Facilities Update November 17, 2017
Sierra Vista Completion December 15th, 2017. Relocation to Sierra Vista scheduled December 15th and 16th for multiple departments and with second and third follow up phasing. Instruction: 31 offices Student Services: 53 offices
Relocation to Sierra Nevada Relocation of EOPS , Financial Aid, Admissions and Records, Counseling, Career Services, Transfer Center, Assessment, Bursar and Instruction to Sierra Vista December 15th and 16th, 2017 EOPS Annex Financial Aid Office and Assessment Admission and Records and Bursar 1, 2 & 3 1 2 1 3 2 3
Relocation and Space Plan Moving company to manage and assist with relocation. Boxes issued 11/27/17. Each floor will be color coded for personal materials placement. PE and VG Trailer move on February 22, 2018 with all remaining relocations as noted.
Phones and Data Tracking 1) Cabling Completed, line dedication November 1, 2017 through December 10, 2017. 2) All lines transferred during December 15 - 16 move. Phones 1) All lines transferred during December 15-16 move.
San Rafael and College Police Relocation of San Rafael 2nd Floor to Sierra Vista December 15, 2017 to completion. Relocation of Police to EOPS January 2, 2018. DSPS from San Rafael to San Fernando December 2018 San Rafael 2nd Floor DSPS to San Fernando Trailer College Police to EOPS Trailer Facility to allow Police Remodel. 6 7 6A 6 6 6A 7
Sierra Nevada and Library Remodel Sierra Nevada Secondary Effects Remodel and HVAC system from November 1st - April 2018. Library Dome Renovation December 14, 2017 - February 15th, 2018 3
PE, Verdugo Gym and San Fernando Trailers Financial Aid Bungalow conversion to 2 classrooms, football lockers, coaches offices Assessment Bungalow conversion to 3 classrooms and maintain CalWORKS Two new trailers on basketball court to house DSPS, Title V and classrooms San Fernando Complex and Assessment building to refresh into classrooms and remain throughout the 2017 and 2018 scheduled years. CalWorks to remain until San Rafael second floor is renovated. 4 5 4 5A 5 5A 5
Anthropology, Journalism, and Culinary Arts Relocation of Culinary Arts Office to Sierra Vista building January 21, 2018 Journalism and Anthropology Department moves TBD Culinary Arts 8 8 8 8
Human Resources Relocation of HR to Admissions and Records April 11th, 2018 HR Relocation from Trailer 9 9 9 9
Athletics Facility Expansion Plans to DSA for approval January 2018 DSA issuance of permit August 2018 Bidding process Sept – Nov 2018 Construction Dec 2018 – April 2020 Occupancy Fall 2020
SITE PLAN
Sierra Nevada temporary swing space remodel PROJECT INCREMENT #1 Sierra Nevada temporary swing space remodel
Western portion Demolition, Grading & Utilities PROJECT INCREMENT #2 Western portion Demolition, Grading & Utilities
PROJECT INCREMENT #3 Verdugo Athletics Building Structure
Parking Lot E & Concession PROJECT INCREMENT #4 Parking Lot E & Concession
PROJECT INCREMENT #5 Utilities Upgrades – Infrastructure
Seismic Upgrade Exist. Gymnasium PROJECT INCREMENT #6 Seismic Upgrade Exist. Gymnasium
LANDSCAPE DESIGN CONCEPT
NORTH ELEVATION WEST ELEVATION
BIRD’S EYE VIEW FROM WEST
EXTERIOR VIEW FROM NORTH WEST
PROGRAM SPACES LOWER LEVEL ATHLETIC TRAINING SHOWERS WEIGHT TRAINING LOCKERS CLASS/TEAM ROOM(S) ATHLETIC TRAINING WEIGHT TRAINING OUTDOOR FITNESS ADAPTED P.E. TIERED OUTDOOR LANDSCAPE
PROGRAM SPACES UPPER LEVEL AUXILIARY PRACTICE GYM COVERED WALK WAY FACULTY OFFICES AUXILIARY PRACTICE GYM COVERED WALK WAY ELEVATOR / STAIRS ENTRANCE
BIRD’S EYE VIEW FROM NORTHWEST
Other Projects During 2018 Purchase of land at Garfield Campus Renovation of classrooms at Verdugo Campus Construct surface parking at Garfield Campus Address science lab and science instruction space needs Plan expanded flexible instructional classroom spaces and music and dance facilities