Read Building Relocation Plan

Slides:



Advertisements
Similar presentations
August 2008 WATCH YOUR STEP! CONSTRUCTION PROJECTS UNDERWAY!
Advertisements

Short-Term Alternatives for City Offices. Background and History Citys current lease for City Marketplace offices ends October 31, 2014 For 22,221 square.
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation.
Edna Maguire School Modernization - Phase 1 Summer 2012.
Campus Master Plan 2012 Update University Senate November 6,
Basic Building Condition Assessment – Part 1 Prepared for Delivery through AGLEARN.
Purdue University - School of Aeronautics and Astronautics Design/Build/Test Activities at Purdue John Sullivan School of Aeronautics and Astronautics.
Warm Springs Community Park 1 Administrative Building 3 School of Engineering (EAST) 2 Library and Student Service Center (WEST) 1. Administrative Building.
Finance and Administration Advisory Group June 30, 2010.
PRTM Philosophy Statement & Program Management Philosophy.
PHASE 2 CONSTRUCTION PHASE I DESIGN SERVICES ISSUE DESIGN-BUILD CONTRACTS DIFFERENCES: SUBCONTRACTOR LISTING (POST AWARD) VALUE ENGINEERING (CHANGE ORDER.
HYDROLOGY FOR ENGINEERING MANAGEMENT MSc
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
New Corporate Office Space
Tackle Engineering We Tackle the Tough Jobs Proposed Developments for New Park and Recreation Center in Alpha, NJ Presented to the Alpha Borough Council.
Read Building Relocation Plan Council of the Built Environment Facilities Utilization Review Sub-Council February 2011.
Academic Programs College of Agriculture and Life Sciences – NC State University Impacts reputation of NC State in the sciences Most diverse on campus.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
Energy Conservation & Deferred Maintenance MSU’s Energy Conservation Module May 1, 2012.
Texas A&M University. Size  The seventh-largest university in the United States, A&M enrolls over 49,000 students in ten academic colleges.
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
SHOW ME THE MONEY Supporting the Operating Costs of a University Center Presented by Laurie McDowell District Director, Edison University Center Edison.
Dr. Gerard Mildner Director, Center for Real Estate Portland State University April 13 th, 2010.
COUNCIL ON ACCREDITATION/DoD FITNESS CENTER STANDARDS DEVELOPMENT.
Coco Dai Xin.  Environmental Engineer  Chemist.
By: Hernandez TEXAS A&M.  Opened in 1876 as Texas' first public institution of higher learning, Texas A&M University is a research-intensive flagship.
Applying Factoring Chapter 10. Solve.  (x – 3)(x – 4) = 0.
A series of refurbishment and alteration projects leading to the vacating of most of level 3P and some of level 2P to allow the opening of the new College.
AUBURN UNIVERSITY Capital Projects Program Facilities Management
The Internet of Things, BYU Buildings. What does it cost to support an office employee?  Office space leasing ($18/sq.ft./year)  Office & data services.
Data Center Update November 5, Background Studies by Staggs and Fisher Consulting Engineers and Emerson Network Power confirm serious power and.
Construction Report September 15, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
Neighbourhood Learning Centres Healthy Communities Partnership Committee September 21, 2012.
South Greenville Recreation Center and Park Master Plan.
Emaar MGF - The Palm Square, Golf Course Road Gurgaon for Rent & Pre-leased Property for sale Call Now For More Detail at  Office and Two.
University of Ohio State. Education Ohio State had more than 44,000 under grads in the fall of The acceptance rate at Ohio state was 55.5% in the.
April 2016 Bond / Facilities Update Presentation
Community Forum 2017 Project Overview UNIVERSITY OF UTAH.
Lane Center for Academic Health Sciences – Now Open
2006 Facilities Master Plan Update Cañada College
Hede Architects Pty Ltd Leading Designers in Community Buildings
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Chabot College Facilities Priorities
Kell Hall Relocation Concept Plan
District Presentation
Group3 Class1, 王凯 许文凯 赵成浩 谷红 赵珊 王西艳 张凯俐 曲璐璐 解宏艳
21st Century School Buildings Plan
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Welcome To Temple University
Reduce your Operating Cost in Wyoming
Welcome to CIS WELCOME WELCOME WELCOME W E L C O M E.
BSOE SPACE/FACILITIES COMMITTEE Agenda – July 23, 2009
Campus Capital Needs Assessment
Fair Lawn BOE: Concept Planning
FOR LEASE Lease Rate From: $15.95 psf; FS
Summer 2017 Projects DV Campus.
Graduate school /school of Engineering Science
Legislative Budget Office (LBO) Office Space Options
CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
University Budget Committee
Facilities Initiative Chris Kinsley, Director, Finance & Facilities
Academic Senate Productivity
Where do you go from here?
FLC Upper Eastern Shore Industry Day
Engaging Industry on Campus: The Case for the Sturm Collaboration Campus Eric Dunker, Ph.D.
EMMI PELTOLA, PIHLA HAKALA, MIKKO KANNISTO AND KIRSI MARJAVA
Laboratory Departure - OVERVIEW
“Rethinking Our Space”
Presentation transcript:

Read Building Relocation Plan October 2010

Short Term Long Term Timeframe Read Building Relocation Plan Planning Goal Short Term Relocate the spaces identified as needing to be demolished located in the Reed Building and G. Rollie White Coliseum. Long Term Discuss options: Existing Spaces New Building(s) Partnerships (Rec/Sports, Athletics, Others) Timeframe Short Term: Relocate spaces by Fall 2011 Long Term: To be determined

Read Building Relocation Plan Current Users Health & Kinesiology Classrooms CIS Recreational Sports Athletics MSC Kyle Field Rec Center

Read Building Relocation Plan Areas to be Relocated Floor Plans

Read Building Relocation Plan Areas to be Relocated Floor Plans

Read Building Relocation Plan Areas to be Relocated

Read Building Relocation Plan Areas to be Relocated

Read Building Relocation Plan Areas to be Vacated

Read Building Relocation Plan Options Solutions Needed sqft Office/Related 18,500 Research Lab 10,000 Activity/Gym 50-60,000 Approx Need 88,500

Read Building Relocation Plan Research Space Options Research Laboratory (~10,000 square feet) Research Park Lease Others

Read Building Relocation Plan Activity Space Options

Read Building Relocation Plan Activity Space Options

Office & Related Spaces Research Laboratory Activity Spaces Read Building Relocation Plan Options Office & Related Spaces Relocate to Space Vacated by Agriculture &/or Engineering Research Laboratory Consider a Research Park Lease Others Activity Spaces Temporary Structures Others: Existing spaces, Old Albertson’s Building … CIS: Open Access Lab Network Hub Classrooms New Buildings

Read Building Relocation Plan Campus Map