RESIDENTIAL DESIGN PROJECT

Slides:



Advertisements
Similar presentations
Commercial Building Project Portfolio
Advertisements

Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Draft Zoning Code City Council Work Session June 21, 2007.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
CEA F INAL E XAM R EVIEW These are the topics that will be on the final.
Pre-Application Presentation To Village of Glendale Planning Commission February 2, 2015 Village Gate Subdivision.
3 feet 6 feet Sun (flashlight) Moon Earth Moon walks around Earth and stops at each quarter turn. Earth records what it sees. Each student should take.
f has a saddle point at (1,1) 2.f has a local minimum at.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
Graphic Language of Buildings Architectural Plans.
City of Rehoboth Beach Managing Impacts of Current Development Trends on Residential Neighborhoods: Issues and Possible Solutions City of Rehoboth Beach.
1837 Pine Street Project Overview Pine Street - Site Plan 2.
FRONT- I50 sq. ft. BACK-150 sq. ft. SIDE-80 sq. ft. + SIDE-80 sq. ft. 460 sq. ft. 460 sq. ft. 460 ÷ 10 =46 gallons , x x 46.
Please start Bellwork # HW, red pen, book on desk.
ARE LOCAL ZONING AND BUILDING CODE REQUIREMENTS PREEMPTED BY STATE LAW? Distributive Electrical Generation Systems.
BCC WORK SESSION OVERVIEW OF ORANGE COUNTY SIGN CODE (PART II) SEPTEMBER 24, 2013.
BE MECHANICAL ENG. 1 ST SEM GROUP :-11 ME – D DABHI DASHYANSINH.S 241 VEKARIYA TEJ.R 242 NIL PATEL.J 243 AKSHAY PATEL.A 244 PARTH PATEL 245 MOHIT VERMA.H.
Draft Zoning Code Planning Commission Work Session June 20, 2007.
MARCH 12, 2013 BACKYARD HENS IN RESIDENTIAL DISTRICTS ORDINANCE BCC WORKSESSION BACKYARD HENS IN RESIDENTIAL DISTRICTS ORDINANCE BCC WORKSESSION.
© 2012 Cengage Learning. Residential Mortgage Lending: Principles and Practices, 6e Chapter 14 Residential Real Estate Appraisal.
Cycle Eun Cho Studio V Summer program Retail: 7-11 Store on Corner 3,000 sf // 3,018 sf Single Story Retail 32,000 sf // 39,276 sf Residential Condominiums:
By: Dakota White.  Slides  Elements  Project Description  Client Survey  Bubble Diagram  Design Sketches  Code Considerations  Habitat for Humanity.
J&J CONTRACTORS’ MAJOR PHASE DRAWING GUIDE HAFB 1305 HVAC Repair Solicitation # MXRD /8/09 1. Chiller line-horizontal work 2 weeks (2 dn shift)
Parkside Development Standards Colorado Springs Together Offices Monday, September 24, 2012 Tuesday, September 25, 2012.
Northwest Quadrant Draft Zoning Ordinance NWQ Draft Zoning Ordinance Planning Commission Review February 21, 2006 Phil Carlson, AICP DSU Planning Consultant.
Phillips Ave. Fire Station. The Fire Station: Phillips Ave. Fire Station RFP to be issued  Retain Historic Building  Allow Residential Use – Single.
Carbon Footprint of the U.S. Population: Causes and Spatial-Temporal Pattern U.S. Residential Electricity Use Analysis Class Project Me/ENV 449, 2007 Nick.
Affordable housing project
Coastal Commission Staff Presentation Item W11a, August 10, 2011 Hearing Applicants: Cheryl Pitt + Jeanne Harris Location: 614 Avenida Victoria, San Clemente.
Lowe’s Site Plan Application No. SP-MAJ Lot 3.
Chapter 3 Orthographic Projection. TOPICS Object representation Glass box concept Line convention Orthographic projection of point, line, plane, surface.
The New Leavelle McCampbell Middle School Design Development Presentation.
Overview of Residential Reconstruction in Needham Lee Newman Town of Needham Director of Planning and Community Development.
To provide for alcohol-free commercial uses that serve as a transition between commercial districts and one- and two-family residential areas. PURPOSE.
Small Town Service ~ Community Stewardship ~ Future Focus ALBRIGHT OFFICE PARK Planned Development PD Architecture and Site S Environmental.
Residential Infill Project Scale of Houses (a primer) Stakeholder Advisory Committee October 6, 2015.
How Closely We Live With Each Other
City of East Palo Alto Planning Commission
ACCESSORY DWELLING UNITS: CLEARING UP THE CONFUSION
GRAPHIC ANALYSIS of EXISTING DOWNTOWN DENSITY
Hillside Development Permit 09-38
Planning and Sketching a Floor Plan
253 South Los Robles Avenue Predevelopment Plan Review
How do we compare properties of two functions?
Beekeeping Sample Site Plan Sketch
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
rezoning Petition # The Drakeford company
RSL and LR1 – Supersize! The Grand Bargain was that Single Family became Multifamily and the development capacity “give” was generally one floor. But in.
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Area of Shapes.
Ardrey Kell High School Civil Engineering & Architecture
Planning and Sketching a Floor Plan
Arbors at Bittersweet Woods.
Commercial Building Project Portfolio
Planning and Sketching a Floor Plan
Architectural Drawings
City of Santa Cruz Accessory Dwelling Unit Development Program
Client Requirements (review) Bubble Diagrams
Zoning We are about to build The Woodlands Community to the City of Mississauga development standards. ARCH – Architectural Studio 2.
Planning and Sketching a Floor Plan
What is the function of the graph? {applet}
ARIZONA WATER COMPANY East Sedona Water Storage Facility
Architectural Drawings
1st Floor Spaces Layout Latrine Latrine TTF Office TTF Office SQ SQ SQ
X y y = x2 - 3x Solutions of y = x2 - 3x y x –1 5 –2 –3 6 y = x2-3x.
City Commission Workshop
Graphic Design Semester 1 Final Exam
Final Project Total 100 points possible.
The New Leavelle McCampbell Middle School
Planning and Sketching a Floor Plan
Presentation transcript:

RESIDENTIAL DESIGN PROJECT APPLICATIONS OF TECHNOLOGY NAME DATE

NEIGHBORHOOD HISTORY

CLIENT DESCRIPTION

PROGRAM In terms of rooms/spaces, our client had the following needs for the project:

PROGRAM In terms of rooms/spaces, our client had the following needs for the project:

SITE ANALYSIS We learned the following from the analysis of the site:

SITE ANALYSIS We learned the following from the analysis of the site:

ZONING ANALYSIS ZONING RESTRICTIONS REQUIREMENTS OUR BUILDING MAXIMUM BUILDING HEIGHT TOTAL BUILDING AREA 1ST FLOOR: 2ND FLOOR SHED: 120 sq ft TOTAL MAXIMUM BUILDING FOOTPRINT SEE ABOVE MINIMUM FRONT YARD MINIMUM REAR YARD MINIMUM SIDE YARD

BUBBLE DIAGRAMS Site First Floor Second Floor

BUBBLE DIAGRAMS Site First Floor Second Floor

PRECEDENTS

PRECEDENTS

CONCEPT SKETCHES

CONCEPT SKETCHES

SITE PLAN

1ST FLOOR PLAN

2ND FLOOR PLAN

STRUCTURAL DIAGRAMS 1ST FLOOR

STRUCTURAL DIAGRAMS 2ND FLOOR

WATER SUPPLY DIAGRAMS 1ST FLOOR

WATER SUPPLY DIAGRAMS 2ND FLOOR

ELECTRICAL DIAGRAMS 1ST FLOOR

ELECTRICAL DIAGRAMS 2ND FLOOR

HVAC DIAGRAMS 1ST FLOOR

HVAC DIAGRAMS 2ND FLOOR

MODEL

SUSTAINABLE/GREEN DESIGN

SUSTAINABLE/GREEN DESIGN

MATERIALS & COST ESTIMATION

MATERIALS & COST ESTIMATION

SOURCES

SOURCES