Cohasset Town Hall THRAC August 29th, 2017.

Slides:



Advertisements
Similar presentations
STRATEGIC FACILITIES MASTER PLAN for Village of Holmen, WI BRIEF OVERVIEW.
Advertisements

Employee Council Meeting January 2012 Office of the Architect.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
LEGG PARK DOG PARK PROJECT DESIGN Prepared for: Meridian Township Parks Commission Board August 9, 2011.
Westminster Town Hall 1770 ● 1835 ● 1889 ● 2011 Continuing a Historical Legacy.
Noncontiguous Clustering New Jersey’s New & Improved Planning Tool.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
Campus Planning & Development Project Overview and Campus Update.
How does CPA work? Basics of the Act for Communities Considering Adoption Presented by: Jennifer M. Goldson, AICP JM Goldson community preservation + planning.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
STUDENT UNION PROJECT. PROJECT TIMELINE Phase 1 - May 17, 2010 site work begins Phase 2 - August 2010 to November 2011 building construction period Phase.
OAKLAND UNIVERSITY SOUTH FOUNDATION HALL CLASSROOM IMPROVEMENT PROJECT.
Chapter 8 Plot Plans.
Town of Carver Review of Proposed Plan for Fire and Police Facilities November 12, 2013 EDWARD J. COLLINS CENTER FOR PUBLIC MANAGEMENT.
Article 49 - Davis Field Park & Recreation Commission Town Meeting May
Contract Opportunities for CUCF Minority & Women-Owned The City University Business.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
FISCAL YEAR 2010 – 2011 FINAL BUDGET June 17,
2015 City of Olympia Ad Valorem Tax Ordinance. Regular Levy: $ 13,282,8421% Increase over Highest Legal Levy 138,762New Construction $55.86 million 43,882Refund.
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
Massachusetts Housing Partnership Connie Kruger, AICP Massachusetts Housing Partnership April 28, 2007 Western Mass Conference on the Community Preservation.
Mary Lin Elementary School 586 Candler Park Drive Phasing Plan March 25, 2010.
Simplified Design Concept. Significant Design Concept.
Objective: To find percentages of quantities without a Lesley Hall Percentages £60 50%25%10% 20% 5%15%30%75% £30£15£6 £12 £3£9 £18.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
1 ARKANSAS RECREATIONAL TRAILS PROGRAM August 10, 2012.
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
Bathroom Renovation Benefits. Bathroom Remodeling Services  A beautiful functional bathroom with an appealing look is always a result of a proper plan.
A PLAN TO BUILD AN ELEVATOR October 15, Long-Range Plan –Office-size Elevator –New Fireproof Stairs –Handicap-Accessible Restrooms –Large Multi-purpose.
FINALIZATION OF MASTER PLAN STEGE ELEMENTARY SCHOOL PRESENTATION MAY 14, 2013 POWELL & PARTNERS, ARCHITECTS.
Georgia Association of MPOs November 29, 2012 North Augusta Park and Ride Project.
WINCHESTER HIGH SCHOOL Site Walk – April 11, 2015.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
Alachua County Mobility Plan Sidewalk Mitigation & Bicycle and Pedestrian Planning Efforts.
The Community Preservation Act in Kingston. Open Space Historic Preservation Affordable Housing Allows communities to establish a dedicated fund for:
Caseload Management and Analytics August 25, 2015 Anthony McGaughey and Angela Damon, IBCLC.
June 2015 Allison Anderson Federal Program Monitoring and Support Eligible School Summary Report (ESSR) Power School Data Webinar.
Planning Department 781 Prospect Boulevard Willis (William) Hindry House Application for Historic Monument Designation City Council October 15, 2012.
Getting Started: Summary of Bylaw and Regulatory Options for Stormwater and Low Impact Development Lexington & Wakefield 1 st Workshop - February 7, 2007.
Municipal Center Needs Analysis City of New Carrollton 100% Final Report MCA # /13/2015 Introduction Needs Analysis Existing Facility Analysis Process.
Building Renovation Updated Plans. Welcome History Original structure was built during Civil War Past renovations – 1961 – 1978 – 2001.
Fractions to Percentages Objective: To find one number as a percentage of Lesley Hall Percentages are fractions out of ……. 100 Write.
Crabtree, Rohrbaugh & Associates, Architects Montoursville Area School District Value Engineering Study Analysis February 23, 2016.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Needham Town Hall Feasibility Study Cover & Credits Prepared for: Needham Town Hall Feasibility Study Committee Permanent Public Building Committee John.
Frothingham Hall Renovation Easton, MA June 21, 2010 architecture interior design urban design cbtarchitects.com.
OUR ENVIRONMENT IN DANGER OF DISAPPEARING/DAMAGING/SPOILING…… The WORLD MONUMENTS FUND, a non-profit organization dedicated to preserving and protecting.
Summary of Key Analysis: Population Permits Parcels
Brewster Ladies’ Library Design & Renovation Project
Facilities Committee Rootstown Local School District January 16, 2017.
Cohasset Town Hall Renovation Advisory Committee (THRAC)
Fiscal Year 2017 Final Budget Workshop
Drawing & Building Names
Board Meeting August 21, 2017.
Cohasset Town Hall Renovation Advisory Committee (THRAC)
2a. Number and percentage of construction establishments and employees, by establishment size, 2012 (With payroll) Establishment size.
21a. Temporary workers as a percentage of the workforce, construction versus non-construction,
HHS Freshman Academy Update
IUSB Education and Arts
Sccca membership meeting Budget 2017
Demmer Library Mission Statement
Cohasset Town Hall THRAC August 29th, 2017.

Town Hall Meeting 2011 Issues
SECTION EXISTING CONDITION PHOTOS
Cathedral of Saint Nicholas
Keystone Library Deliverables
Phase II Committee Forrest Barber Johnny Davis Mike Hannon Brandon Harwood Kelly McKay Jim McCoy Becky Roberts.
Town & Country.
Town Hall Assessment and Design Progress Update THRAC
Presentation transcript:

Cohasset Town Hall THRAC August 29th, 2017

Cohasset Town Hall THRAC August 29th, 2017

Cohasset Town Hall THRAC August 29th, 2017

Cohasset Town Hall THRAC August 29th, 2017

Cohasset Town Hall THRAC August 29th, 2017

Cohasset Town Hall THRAC August 29th, 2017

Cohasset Town Hall THRAC August 29th, 2017 Preliminary Eligibility for CPA Funding

Cohasset Town Hall THRAC August 29th, 2017 Preliminary Eligibility for CPA Funding Construction Costs Eligible Option 3 Option 4 Renovation of Historic Building 100% $3,577,948 $3,907,887 Percentage of Addition Eligible (egress, elevator, bathrooms) 35% $1,709,066 0% $0 Percentage of Landscape Percentage of Site & Utility Costs 50% $431,194 $514,400 CPA Eligible Construction 60% $5,718,208 40% $4,422,287 Total Construction $9,400,000 $10,900,000 Soft Costs Eligible Option 3 Option 4 FF&E 0% $0 All Other Soft Costs 60% $1,860,000 40% $1,126,000 Total CPA Eligible $7,578,208 $5,548,287 Total Non-CPA Eligible $5,221,792 $9,051,713 TOTAL $12,800,000 $14,600,000