MD Studies for LIU PS Injection

Slides:



Advertisements
Similar presentations
REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
“Beam Losses” Christian Carli PSB H - Injection Review, 9 th November 2011 Several topics more or less related to beam losses, a study still somewhat at.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
PS losses during CT extraction, a history about 30 year long... J. Barranco, S. Gilardoni CERN - AB/ABP.
IEEE NSS 2007 D.Kramer 1 Very High Radiation Detector for the LHC BLM System based on Secondary Electron Emission Daniel Kramer, Eva Barbara.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Status of ATF Fast Kicker Experiment
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Some ideas to optimise PSB injection chicane Wim, Brennan, Jan, Masamitsu.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
STABILITY STUDIES OF THE PSB-TO-PS TRANSFER W. Bartmann, J. Abelleira With many inputs from: O. Berrig, J. Borburgh, S. Gilardoni, GP di Giovanni, B. Goddard,
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
Aperture measurements during LHC commissioning 2017
Use of a Diamond BLM System in the LHC Ring
TPS pulse magnet measurement
Summaries and conclusions of the MTE Workshop
Luminosity monitor and LHC operation
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
LHC Wire Scanner Calibration
The TV Beam Observation system - BTV
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
2007 IEEE Nuclear Science Symposium (NSS)
J.-L. Sanchez Alvarez(PSB-EIC)
LINAC4 ADVISORY COMMITTEE
Status of the PS TFB Hardware Overview Machine results To be done
Use of a Diamond BLM System in the LHC Ring
Introduction: FCC beam dumping system
Alternative/complementary Possibilities
Power converters for 2GeV injection
MD2036: UFO dynamics studies and UFO fast detection
Emittance growth AT PS injection
Case Study - Group 2 FCC-ee Top-Up Injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Automatic Generation of the Radiation Level Weekly Reports Update 18
Results from crystal H on Beam 2
Luminosity Optimization for FCC-ee: recent results
PSB-PS instrumentation for LIU
CNGS Proton Beam: Introduction
FCC-hh injection group 7
Beam Injection and Extraction Scheme
Strip-line Kicker R&D at KEK-ATF
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Week 35 – Technical Stop and Restart
PS2 Injection/Extraction Layout
Tuesday 9th November 10:02 Fill beams dumped
Introduction to LHC beam production in PSB and PS
Multi-Turn Extraction for PS2 Preliminary considerations
MD#2 News & Plan Tue – Wed (19. – 20.6.)
DEMONSTRATION OF TRIPLE BUNCH SPLITTING IN THE CERN PS
Generation of Higher Brightness Beams for LHC
MD Planning Fri – Sat (1. – 2.7.)
Kicker specifications for Damping Rings
Injection design of CEPC
Saturday 24 September 2011.
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Presentation transcript:

MD Studies for LIU PS Injection M. Serluca, W. Bartmann, V. Forte, G. Sterbini MSWG, 02 September 2016

Motivation Optics studies on the transfer line and PS ring for the future injection at 2 GeV have shown that the optimized septum position is 1 cm closer to the PS closed orbit with respect the actual position MD goal: verify that the future septum position is compatible with LIU requirements for 2 GeV beams type and PPM compatibility with beam at 1.4 GeV

Present injection region SS42 ACEM BLM42 Diamond BLM42 Injection line from PSB MU 41 MU 42 BLMs on the top of MU42 BSW42 SMH42 BEAM

Future injection region Eddy current septum New septum-bumper 42 (same vacuum vessel) BEAM MU 41 MU 42 35 cm septum-like bumper

Future injection area Example of injection of 2 GeV HI beam with low beta insertion  Optics studies on the transfer line and ring have been carried out to optimise the horizontal position and angle of the septum and maximise the acceptance for LIU HI beams at 1.4 and 2 GeV. EDMS: 1557577 v.1.1 - PS-M-ES-0002 v.1.1  

Septum position and angle Future septum-bumper Blade thickness: 11 mm Present septum Blade thickness: 5 mm Present septum dr = 64 mm f = 10 mrad 62 cm 94 cm 1 cm Future septum dr = 54 mm f = 10 mrad

MD1740: setup and measurements Workflow from recorded data to final results MD data TIMBER: main parameters ( not all and some of them are saved for short time ) MATLAB, etc… : user scripts to save data during the MD ROOT, MATLAB, etc.. : user has to merge the data and use scripts to analyse them Generally data and scripts are not public Efforts are in progress to improve the process SWAN (Service for Web based Analysis): platform for interactive data analysis in the cloud SWAN is becoming widely used at CERN in combination of cernbox Interactive program environment: Jupyter Python-based applications: so-called notebooks Possibility to access and filter all data (TIMBER and MATLAB .m files) Generate plots inside the environment Create monolithic database, catalogues of analyses and encourage reproducible studies MD1740 Postprocessing.py notebook can be found in /afs/cern.ch/work/s/sterbini/public/2016/MD1740_SMH42

MD1740: setup and measurements TOF beam ex = 17.4 mm mrad el = 2.75 eV s t = 157 ns dp/p = 2.58 10-3 I = 800 1010 Knobs: septum: position, angle and strength kicker45 strength bumpers strength Recorded signals Beam trajectories BLMs along the ring BLM42 slow (yellow line) Fast Diamond BLM42

MD results: TOF beam

MD results: TOF beam First hour: 10 mins to take reference BLMs readings for nominal settings Test the septum motors

MD results: TOF beam Second hour: Test of the diamond BLM42 using the internal dump Optics optimization: reduction of the bump height and increase of kicker-septum strength

MD results: TOF beam Last hour: Automatized scan of SMH42 position and angle

MD results: TOF beam Scan of SMH42 positions and angles BLM42 reading for nominal position (64 mm) and angle (10 mrad) is 23 [8-bits ADC] Lower losses for position between 54 and 61 mm BLM42 8-bits ADC Scan of SMH42 positions and angles Same plot but with BLM42 reading filtered for data below 8 [8-bits ADC] Lower losses for position between 55 and 60 mm and angle between 8 and 13 mrad BLM42 8-bits ADC

MD results: TOF beam Previous results are confirmed by data from OASIS channels Diamond BLM42 Scan of SMH42 positions and angles Fast diamond BLM42 integrated values Lower losses for position between 54 and 60 mm Slow BLM42 Scan of SMH42 positions and angles Lower losses for position between 54 and 60 mm

MD results: SFTPRO beam SMH42 position and angle acquisitions Injection optics not optimized for SFTPRO beam BLMs show a slight reduction of losses

MD results: SFTPRO beam Scan of SMH42 positions and angles BLM42 reading for nominal position (64 mm) and angle (10 mrad) is 20 [8-bits ADC] Lower losses for position between 54 and 61 mm BLM42 8-bits ADC Scan of SMH42 positions and angles Same plot but with BLM42 reading filtered for data below 25 [8-bits ADC] Lower losses for position between 54 and 59 mm and angle between 8 and 13 mrad BLM42 8-bits ADC Similar results for AD and LHC beams

Conclusions MD results were very positive Septum position (around 56 mm instead of 64 mm) reduces the losses of a factor 3 for HI beams with the drawback of pushing the septum strength too close to its maximum value, i.e. reduced lifetime A lower position of the septum is also compatible with LIU requirements for 1.4 and 2 GeV beams