Ad-hoc Transportation test of «CLIC module»

Slides:



Advertisements
Similar presentations
LEEDS BECKETT UNIVERSITY NEW STUDENTS: PROGRESSION AND AWARD How do I progress between levels? How is my final award calculated?
Advertisements

MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
EditablePowerPoint Slides for Lecturers By Phil Hughes MBE and Ed Ferrett By Phil Hughes MBE and Ed Ferrett.
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
IE 366 IE 366: Work Systems Engineering Introduction.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
ES305: Virtual Tools in Engineering Design: The Eng. Design Process James Carroll, Associate Professor Electrical and Computer Engineering.
1/9 Hélène Mainaud Durand Sylvain GRIFFET, 28/11/2011 BE/ABP-SU/ Adjustment of 4 Drive Beam Quads positions on TM0 CLIC girders EDMS Document No
Equipments of In-Door Material Handling Béla Vizvári.
LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team CLIC ACTIVE PRE-ALIGNMENT STUDIES: STATUS FOR CDR AND PROSPECTS FOR TDR PHASE.
Material Handling & Lifting Resource
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Friedrich Lackner (TS-SU) CLIC08 Workshop. CLIC Main Beam Quadrupole Magnet The Alignment Concept Expected Properties of a the Support Structure Foreseen.
TIB-TID insertion test into the CMS Tracker cylinder ________________________________________________________ Tracker week july 04
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1962 First CMM DEA (Italy) Ahmed CHERIF CERN Metrology lab. CLIC TECHNICAL COMMITTEE – EDMS : EDMS :
Start Typical student project Advanced student project Level of final response.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
Transport & Handling of Detectors TAN Workshop S. Prodon –
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 July 17,
CLIC module Experimental program for module array Module review, June 22 nd 2015Elena Daskalaki, BE-RF-MK.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
Gravity load on SAS – comparison between real and mock-up April 13 th, 2016.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
H. MAINAUD DURAND on behalf of the CLIC active pre-alignment team Status on CLIC pre-alignment studies.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
IE 366 IE 366: Work Systems Engineering Introduction.
Two-beam module layout
Ad-hoc Transportation test of «CLIC module»
Ad-Hoc Committee Future Use of City Buildings
on behalf of the CLIC active pre-alignment team
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Workshop on Tau-Charm at High Luminosity
CLIC Common RF-girder study
Module roadmap to end of 2017
5th FCC Infrastructure & Operation meeting
WP1 Metrology & Alignment
List of changes and improvements for the next generation CLIC module
Installation plan for LAB modules
Radiation-safe area for electronics, or laser or
Pallets Moving Services By Trucksi
Backpage Chicago
Outcome Monitoring and Evaluation Using LQAS
Potato Demo 2017.
Industrial Technology Timber Stage 5
Magnet, Support and Infrastructure
Production process- your product processing cards, technology
Presentation transcript:

Ad-hoc Transportation test of «CLIC module» M. Aicheler 26.10.2016

Those two girders to be transported into storage area in Building 162 => ad-hoc Transportation-Test

AS simple mockup Plain material, no inner geometry Brazed (for material state compareable to CLIC AS) and very cheap to manufacture Core diametre 80mm Manifolds 40mm x 40mm Roughly same weight and similar mechanical properties Will be reused for tests with new supports!

MB Girder AS Vibration logger Fiducial Clamping of AS to girder as in CDR/CLEX

Steps: Installation, clamping, on site-fiducialisitation, installation of vibration logger in Build 18 Transport by manual crane onto palette Transport of pallet with manual lifter Transport of pallet with truck Transport of pallet with hall crane to final position Final on site (build 162) survey and evaluation of vibration logger If we want, we can make an intermediate survey at any point with the laser tracker (e.g. after transport with truck) Overall time estimation for test (including fiducialisation and final survey): 2 days

Targeted outcome: Open questions: Evaluate the loss in position precision during a transportation test with the CDR design of support and clamping Assess the typical spectrum of vibration/shock exposure of a CLIC girder during various transportation steps for future support design Open questions: Transport in a box? Clamping details Details on manufacturing of simple AS mockup