Fast Kicker R&D in the Americas Region

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

September 28, 2006-Cornell (Zisman/Mattison) Global Design Effort 1 DR Kicker R&D: Goals and Work Scope Michael S. Zisman and Tom Mattison.
Americas Region Inductive Adder Modulators for ILC DR Kickers Craig Burkhart SLAC For SLAC-LLNL Team Ed Cook, C. Brooksby LLNL R. Cassel, T. Beukers, C.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
FID Based Pulse Generators for Accelerator Applications Vladimir M. Efanov FID GmbH, 25 Werkstrasse, Burbach, D-57299, Germany 2006.
Americas Region High Availability Electronics R&D Program FY06-07 DOE/NSF ILC Americas Program Review FNAL April Ray Larsen SLAC For Controls,
Stripline Kicker Project LBL LLNL SLAC KEK DESY. Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β,
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
A fast RF kicker for the MEIC electron cooler Andrew Kimber Amy Sy 31 st March 2015 Thomas Jefferson National Accelerator Facility is managed by Jefferson.
Plans for injection/extraction R&D S. Guiducci INFN-LNF KEK - ILCDR07, Dec 207.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
XFEL Pulser Specification of Pulser Dump pulser with a Belhke switch
Status of Fast Pulser and Kicker Work at UIUC and Cornell Robert Meller Cornell University Laboratory for Elementary-Particle Physics.
Ultra-Fast Damping Ring Kicker Modulator Development at SLAC Status update for ILC2010 C. Burkhart, A. Krasnykh, R. Larsen, & T. Tang March 27, 2010.
ILC Damping Ring Kickers Presenter: Josef Frisch Dec 7, 2004.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
ILC Hybrid MOSFET/Driver Module Update T. Tang, C. Burkhart September 29, 2011.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ILC Program discussion M. Ross Damping Ring Injection / Extraction Kicker Magnet 1)The TDR Kicker: 1)0.6 mrad (.01Tm), 5GeV, 50 m β, 7e-4 stability,
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
I PhysicsP I llinois George Gollin, Damping ring kickers, SLAC ILC-America, October Damping ring kickers George.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
22 Set 2009 EPPC 09 CERN September /14 Solid-State MARX Type Circuit for the ISOLDE Target Voltage Modulator L.M. Redondo*, J. Fernando Silva.
Status of ATF Fast Kicker Experiment
Bunch Separation with RF Deflectors D. Rubin,R.Helms Cornell University.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
Injection/extraction R&D Summary S. Guiducci (INFN), Thomas Mattison (UBC) KEK - ILCDR07, Dec 207.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Fast Grid Pulse Modulation
Fast pulsed power supply for ILC damping ring kicker
Damping Ring Injection and Extraction Damping Ring EDR Kickoff Meeting Daresbury UK 5-7 November 2007 Thomas Mattison University of British Columbia.
Tao Tang, Craig Burkhart
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
HA Electronics Progress December R. Larsen For the Team.
DR Kicker R&D: Goals and Work Scope
Development of a Marx-Generator for the drive beam electron gun
Javier Serrano CERN AB-CO-HT 29 February 2008
The ILC Control Work Packages
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Oversea collaborators
General presentation about recent status of DRFS
The DBD: Outline and Scope
George Gollin University of Illinois at Urbana-Champaign and
Junji Urakawa (KEK) for ATF International Collaboration
Bunch Separation with RF Deflectors
Damping Ring Kicker Tests at AØ
Klystron Power Supplies for ILC
Strip-line Kicker R&D at KEK-ATF
ATF Fast Kicker R&D at LBNL ILCDR06, Cornell University
Fast Kicker R&D at ATF T.Naito(KEK) TILC09 18/April/ /11/27.
Fourier Series Pulse Compression Damping Ring Kicker
Pulser Tests at the A0PI Mark Palmer and Bob Meller Cornell University
ATF project meeting, Feb KEK, Junji Urakawa Contents :
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Specifications for the XFEL Beam Switchyard Kickers
Presentation transcript:

Fast Kicker R&D in the Americas Region Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education ILC2007 Global Design Effort

Outline Fast kicker and pulser priorities for the Americas region Americas R&D Effort High Availability kicker development Update from FID Technologies Other efforts and possibilities in the Americas Conclusion Global Design Effort

Focus of the ART Program Primary focus of US program Pursue a high availability pulsed power supply design Ensure that we have a route to meet system level requirements of the DR injection/extraction kicker systems Continue to develop a well-understood system design that complements the pursuit of other proprietary off-the-shelf options Modest support for kicker structure development LBNL support of ATF kicker design Expect small supporting effort for ILC design Program assumes that major structure development will take place in the other regions Global Design Effort

High Availability ILC Kicker with ATF Motivation Fast precise pulses <5nsec needed to reduce DR size to 6 km. Reliability/Availability of system of ~ 10-20 or more pulsers in series critical. Program Phase I (FY06-08): Demonstrate HA pulsers, HA architecture Currently pursuing both Induction Adder MOSFET and DSRD* pulser technologies (*Delayed Step Recovery Diode used as pulse sharpener) Final design may use Inductive Adder to pump DSRD circuits Phase II (FY08-09): Demonstrate 3 MHz, <5 nsec width, 1 nsec Tr Tf, +/-10kV to +/-0.1% stability, DR pulser & kicker magnet performance Phase III: Demonstrate, timing control, calibration, fast diagnostics, reliability, HA features for one, more than one pulser & magnet (FY09-10). Actual schedules determined by funding & resources. Involvement SLAC, LLNL/Bechtel for pulser development KEK testing/use at ATF Global Design Effort

HA Kicker Systems Planning targets being ready for a technology down-select in 2009 Global Design Effort

Original Prototype Tested at KEK 20 nsec Pulse needs faster Tr, Tf, tail compensation Integrated Driver & Power MOSFET E. Cook LLNL Global Design Effort

HA Kicker System Topology Tens of pulsers will be needed in a High Availability topology with auto-failover and access for replacement Control/Timing/Calibration Serial Links Shield Wall C. Brooksby BN/LLNL Global Design Effort

DSRD Detailed Circuit Behavior 3 MHz Rep Rate L=40 nH, Co=30 nF, C1=1.5 nF, ton=150 nsec, t = 1 nsec 1 kV 1 nsec 10 nsec ~6 kV pulse Currents vs. time for one cycle Output Voltage, Residual Voltage is ~ 2% Global Design Effort

HA Kicker Progress Summary Progress in FY07: Cascode driver promising; started development of new integrated driver chip with MOSFET to speed risetimes DSRD single diode pulser achieved best waveform to date; but 07 SLAC effort barely started due to lack of initial funding Startup funding now allocated for nanosecond pulse circuit diagnostics development in 07 Submitted comprehensive program plan, funding request for FY 08-09 to DR Area Group Note: Kicker magnet development proposed but no funding for in FY 07-09 plans Global Design Effort

Ongoing Contacts with FID Technologies FPG 10-6000NK Pulse height in the 5-10 kV range 1-2 ns full width 6 MHz burst rate 1 ns rise time Does not use a combiner to obtain burst rate from multiple internal channels No funding available to pursue this option in the Americas 1 ns 7 kV Pulse 6 MHz Burst Global Design Effort

Other Efforts in the Americas (1) A0 kicker Measurement of timing and pulse height stability of ±1 kV pulser from FID technologies last year (Cornell/UIUC) See presentation by George Gollin for A0 status and plans A0 Stripline Kicker Full width ~8.5 ns with ~2.1 ns stripline (slightly over spec) 2 ns 3 MHz Burst 14 kHz Avg Stability <0.75% Kick (mrad) Delay (ns) Global Design Effort

Other Efforts (2) Proposal by Tom Mattison (Univ. of British Columbia) for work on ferrite pulse sharpeners NML beam facility at FNAL Propose to use an ILC DR-style kicker to separate dark current and beam trajectories Can potentially serve as a test bed for DR pulsers Specifications: 1 ns rise time 3 MHz burst rate Need better pulse stability than the DR specification ~0.1% ±3 kV pulse height Global Design Effort

Conclusion Americas program primary goal is to have the HA architecture ready for a downselect decision before the end of 2009 Determines the distribution of funding Modest support for other R&D will be available Other pulser tests Kicker structures Plans appear consistent with EDR needs, S3 priorities and ongoing efforts in the other regions Global Design Effort