BT2017 Analysis meeting LAL, 30/11/2017

Slides:



Advertisements
Similar presentations
Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
7 Sept 2007Paul Dauncey - Calorimetry1 UK Opportunities in SiD Calorimetry Paul Dauncey Imperial College London.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Micromegas modules Towards the 7 module test. Micromegas panels Phase I: ‘Large Prototype’ Micromegas modules were built and tested in beam ( ):
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
ATLAS micromegas activities (MAMMA)
Resistive anode studies D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Micromegas Large Prototype panels Studies.
ECAL review 5 th ILD LAL Orsay May 2011 K. Kawagoe Kobe-U  Kyushu-U in April 2011.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
SiW ECAL: the status before Fermilab Marcel Reinhard LLR – Ecole Polytechnique CALICE caollaboration meeting 18/03/08, Argonne.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
SiW ECAL Marcel Reinhard LLR – École polytechnique LCWS ‘08, Chicago.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
D_R / D_1 Vincent Boudry LLR, École polytechnique FJPPL'10 LAPP — Annecy 15/06/2010 A common R&D on the new generation detector for the ILC Shinshu KEK.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting May 2011 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting CERN May 2011.
Hadrons in a SiW Electromagnetic Calorimeter for a Future Linear Collider Roman Pöschl LAL Orsay LHC EUDET Annual Meeting DESY Hamburg September/October.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
14.4. Readout systems for innovative calorimeters
ILD & Test Beam DAQs session
SiD R&D Plan and Opportunities for New Collaborators
Final CALICE OsC meeting: Status and summary of project
Test beam results of MCz-Si detectors
EUDET Elec/DAQ meeting
AIDA st annual meeting DESY, 27/01/2016
Experimental Method: 2 independent detectors on both sides of IP
Test Beam Request for the Semi-Digital Hadronic Calorimeter
FCAL R&D towards a prototype of very compact calorimeter
Integration of CALICE DAQ in common DAQ
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
Preparation for CERN test beam
Comments on the DAQv2 advancement
CALICE News The 2007 beam tests have started!
CALICE Meeting Tokyo University, 26/09/2017
DESY Test Beam Facilities - Status and Plan
Status of Ecal(s) for ILD
Plan of production of SiW-ECAL slabs in Japan
Report from the Technical Board
10/month is the present production rate 2 FTE + sporadic contributions
C. de La Taille IN2P3/LAL Orsay
New Design for Beam Test Structure
CALICE/EUDET Electronics in 2007
CALICE Collaboration Meeting KEK/Japan – April 2015
prototype PCB for on detector chip integration
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Stéphane Callier, Dominique Cuisy, Julien Fleury
Michele Faucci Giannelli
Experimental Method: 2 independent detectors on both sides of IP
LC Calorimeter Testbeam Requirements
Presentation transcript:

BT2017 Analysis meeting LAL, 30/11/2017 Beam Tests 2018 Vincent Boudry École polytechnique, Palaiseau BT2017 Analysis meeting LAL, 30/11/2017

DESY `end of spring’ 2 weeks in June 2018 for the SiW-ECAL of ILD/CALICE. The purpose is to complete the test of June 2017 DESY beam test in several directions: 1) Using a new compact structure allowing for 0 to 24 X0 of Tungsten and any number of sensor layer: It will hold: (FEV are our PCB, SK2/SK2a ASICs) the existing layers (7 working tested in 2017 + 3 to be repaired [FEV11 + 325μm Wafers + SK2] 3 to 4 layers with improved design [FEV13 + 500μm & 650 μm wafers + SK2a] up-to 5 new layers to be produced in Kyushu (Japan) in close collaboration with industrial partner [FEV12-Jp + 650μm Wafers + SK2a] 1 or 2 thin layers with ASICs embbeded in PCB [FEV11_COB + baby wafer + SK2a] 2) A long structure (3.2m) chaining 12 detector units, mounted on a support on wheel, to test the response of a long layer. We would like to test the structures with and without B field as last year (so T24 would be perfect). Additionally, if this is technically feasible, we would try photon generation by bremsstrahlung in a thin target before a dipole at distance from detector: this would be useful for separation studies, a key criteria of PFA. The typical separation distance to be tried is up-to 5-6 cm. It might then be useful to have a beam telescope at hand. Vincent.Boudry@in2p3.fr

DESY schedule (v1, 2017-11-24) http://particle-physics.desy.de/sites/site_particle-physics/content/e252106/e261123/infoboxContent289052/Testbeam_schedule2018v1_ger.pdf “occupied” To be negotiated Vincent.Boudry@in2p3.fr

Beam Area Vincent.Boudry@in2p3.fr

What can be improved wrt to 2017 ? > 45° Long structure: TB24/1 everything new. Can it be put in the B field. Shoot though the magnet Shoot at angle ? Prototype → More layers: TB21 Holding structure → ? readiness ? 24 X0 whatever the number of active layers ? Grounding ? electron shower program (E, angles) with simulation Separation studies : γ + e → ? Feasibility ? → D for Ee~Eγ in [1–5] cm ⇒ target, B, L Use of telescope ? → ? DAQ ? TB24/1 e- B field ⦿ Target ~1 X0 D Ee+Eγ ~ Ei D ∝ 1/Ee Ei L γ Vincent.Boudry@in2p3.fr

CERN 2018 Posted the same demand as last year: very late beam with SDHCAL DAQ integration ? Vincent.Boudry@in2p3.fr