IPTV related works in Q13/12

Slides:



Advertisements
Similar presentations
International Telecommunication Union D3 Methodology Objectives for this meeting from Chairman of WG-A Yoh Somemura (NTT, Japan) Vice Chairman of FG on.
Advertisements

Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
1 CFR CHAPTER I AND 1 CFR PART 51 REGULATORY UPDATE.
DOCUMENT #:GSC15-GTSC-05 FOR:Presentation SOURCE:ITU-T AGENDA ITEM:4.1 NGN, Testing specification and Beyond Chaesub.
NGN Management Focus Group 2 November 2004 Dave Sidor Interim Chairman Nortel Networks Tel Fax
Security Threats and Security Requirements for the Access Node Control Protocol (ANCP) IETF 68 - ANCP WG March 18-23, 2007 draft-ietf-ancp-security-threats-00.txt.
Doc.: IEEE Submission November 2007 Michael Lynch, Nortel Networks Update on IEEE IMT Advanced RR-TAG was directed to take.
The 16th CJK NGN-WG Meeting July 22 ~ 24, 2009, Beijing, China 16 th CJK NGN-WG (Standardization on DSN and Future Direction ) Shin-Gak Kang
Doc.: IEEE /0616r0 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
Project Execution Methodology
Task Group API 19SS Sand Screens
Proposal for study scope of CJK IPTV-adhoc group
nnnnn, iii_xxxxx_vv Section 2 Comment Resolution Summary Jim Mollenauer Steve Wood Dave Meyer Med Belhadj May 9, nnnnn, iii_xxxxx_vv.
Preparing for Permit Review
Global Standards Collaboration (GSC) GSC-15
Status of the Planning Working Group’s (PWG) Efforts
P802.11aq Waiver request regarding IEEE RAC comments
Current Situation of F.MID and H.MID in ITU-T SG16
22 March Agenda Opening comments and attendance
Triennial Review of Water Quality Standards Proposed Rulemaking
CJK 10th NGN-WG (Follow up IPTV-GSI) Chae Sub, Lee
Sub-1 GHz Study Group Closing Report Sept 2018
Software Measurement Process ISO/IEC
ETSI e-approval application enhancements
IEEE MEDIA INDEPENDENT HANDOVER DCN: sec
IEEE MEDIA INDEPENDENT HANDOVER
June 2010 doc.: IEEE /0705r0 November 2010
<month year> <Sept 2018>
This Presentation Pack is brought to you by
IEEE MEDIA INDEPENDENT HANDOVER
WG Technical Editor’s Report
doc.: IEEE <doc#>
March 2009 Closing Report for TGmb
May 2009 Closing Report for TGmb
<month year> Denver, March 2006
TGac Status and Timeline
doc.: IEEE <doc#>
Mar Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG4w March 2018 Plenary Closing Report] Date.
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
P802.16q Closing Report for Session #89
IEEE MEDIA INDEPENDENT HANDOVER
Session # GRIDMAN Opening Report
IEEE MEDIA INDEPENDENT HANDOVER
EC Update on TV Whitespace ECSG
Proposed work items and timeline for the LC SG
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP Title: m Session #74 Opening Notes Date Submitted: May 16, 2016 IEEE session.
Proposed timeline for the Light Communications TG
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Opening report for TG4j (MBAN) Task Group, Nov.
WG Technical Editor’s Report
Open Letter - Summary of Responses
IEEE TGmc Mar 2013 Agenda Date: Authors: March 2013
June 2010 doc.: IEEE /0705r0 December 2010
Timeline for the Light Communications TG
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
GRIDMAN Task Group Opening Presentation Session #83
Resource Adequacy Steering Committee Meeting October 4, 2011
May 2015 doc.: IEEE /0496r1 July 2017 IEEE TG13 Multi-Gbit/s Optical Wireless Communication September 2017 Closing Plenary report Date:
P802.16q Closing Report for Session #89
Status report of OBD Task Force
Nov 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Closing report for TG4j (MBAN) Task Group, Nov.
TGaj editor report for Sponsor Ballot
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
Wayne Zeuch, GTSC-6 Chair Nicole Butler, ATIS Staff
Capacity Access Review
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
KPI and KVI Review Approach & Plan
UIG Task Force Progress Report
Presentation transcript:

IPTV related works in Q13/12 December 11-12, 2008 TTC Masato Yamanishi SBTM / SBB

IPTV related documents in Q13/12 Recommendations which are approved recently Y.1544 (former Y.IPmulti) G.1080 (former G.IPTV-QoE) G.1081 (former G.IPTV-PMP) Draft recommendations which are inherited from FG-IPTV G.IPTV-PMPD G.IPTV-PMMM Draft recommendations which are newly started G.IPTV-MMRP (former G.IPTV-QMA) IPTV Performance monitoring and reporting (still WD, may become supplement?)

Status of G.1544 (former Y.IPmulti) Title: Multicast IP performance parameters Summary: Performance parameters for point to multipoint IP service, network portion, and IGMP v2/v3 Expansion of Y.1540 Status: Consented in last SG12 meeting in May 2008 No LC comment, so approved

Status of G.1080 (former G.IPTV-QoE) Title: Quality of experience requirements for IPTV services Summary: User requirements for Quality of Experience (QoE) for IPTV services Status: Consented in last SG12 meeting in May 2008 LC comment from Nortel (Canada) requested to move all numerical requirements and lists of codecs to an appendix Q13/12 decided to keep requirements for bit-rates in main part with some modifications and move others to an appendix Additional review is just finished on Dec. 6

Status of G.1081 (former G.IPTV-PMP) Title: Performance monitoring points for IPTV Summary: User requirements for Quality of Experience (QoE) for IPTV services Status: Consented in last SG12 meeting in May 2008 LC comments from Huawei and Nortel (Canada) requested some editorial modifications and clarifications Q13/12 resolved all above points (technically, no major change) Additional review was finished on Oct. 21 and it is in “pre-published” status

G.IPTV-PMPD Title: Summary: Status: IPTV performance monitoring – Parameter definitions Summary: Definitions of performance monitoring parameters for IPTV services Status: Derived from FG output No contribution for previous interim meeting on Nov. 11 and 12 Current one is maximum list, so each parameter may be reviewed to decide its necessity and priority Target date is 2010

G.IPTV-PMMM Title: Summary: Status: IPTV performance monitoring – Measurement Methods Summary: Measurement methods for performance monitoring parameters Status: Derived from FG output No contribution for previous interim meeting on Nov. 11 and 12 Use cases should be studied as next step Target date is 2010

G.IPTV-MMRP (former G.QMA) Title: Measurement-based methods for improving the robustness of IPTV performance Summary: (Dynamically) control the resources based on the analysis of measurement information and policy rules to support high Quality of Experience of IPTV services One of listed up methods is that network devices selectively discard Status: Newly started from Mar. 2008 (Proposed by Huawei) The title and scope are slightly changed in previous meeting Still, needed to list more possible methods up Target date is next SG12 meeting in Mar. 2009

New WD Title: Summary: Status: IPTV Performance monitoring and reporting Summary: The key use cases for IPTV performance measurement are described, and for each use case an aggregation and reporting model is defined. Status: Proposed for last interim meeting by Telchemy May become a supplement, especially useful for G.IPTV-PMMM Needs more contributions Target date is TBD

Potential influence to Qs of SG13 Of course, all works have some influence on Q4/13, as usual G.IPTV-PMMM and G.IPTV-MMRP may have some influence on Q3/13 in future, since they are trying to define details of management functions of Y.1910 G.IPTV-MMRP may have some influence on Q K/13, if a DPI based method will be included

Meeting schedule 4Q/08 1Q/09 2Q/09 3Q/09 4Q/09 11/11,12 Interim meeting 3/10-19 SG/WP12 meeting Target date of G.IPTV-MMRP 11/3-12 SG/WP12 meeting