WF on Radio Link Monitoring in NR

Slides:



Advertisements
Similar presentations
Way forward for LTE DL 4Rx AP SI on RF
Advertisements

WF on design of physical downlink control channel for MTC CATT, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, ETRI, InterDigital, MediaTek, NTT.
WF on PBCH Coverage Enhancement
Way forward on TBS determination in initial partial subframes
WF on Support of EBF/FD-MIMO Features in TM9
Way forward to NB-IoT 3GPP TSG RAN WG1 #83 R1-157xxx
WF on SIB1bis Transmission
Way forward on RAN2 aspects of multiple PRB operations
WF on UE capability signaling for FD-MIMO Class B LG Electronics, Intel Coorporation, NTT DOCOMO, Qualcomm 3GPP TSG RAN WG1 Meeting #84 R St Julian’s,
Clarification of the scope of the study on latency reduction techniques for LTE 3GPP TSG RAN Meeting #71RP-16xxxx Göteborg, Sweden, March , 2016.
WF on MCOT limit Signaling and Modifying LBT type Ericsson, … 3GPP TSG RAN WG1 #85 R1-16xxxx Nanjing, China 23 rd – 27 th May 2016 Agenda item:
WF on Supporting different Numerologies in a NR carrier LG Electronics, [Huawei, HiSilicon, Panasonic], 3GPP TSG RAN WG1 Meeting #85R Nanjing,
Way Forward on NR UE Testability Intel Corporation, CATR 3GPP TSG-RAN WG4 Meeting #80bis R Ljubljana, Slovenia, August, 2016.
Overview of open issues in
Offline discussion on remaining details on RRM measurements
WF on Bandwidth Part for DL common channel
WF on RA-RNTI design 3GPP TSG RAN WG1 Meeting NR#3 R1-171xxxx
3GPP TSG-RAN WG4 Meeting NR#3 Nagoya, Japan, 18 – 21 Sep, 2017
Summary on Beam Recovery Mechanism
Way Forward on UE measurement definition and capability
Summary of SLS for RRM NTT DOCOMO
Offline Discussion on remaining details about RACH Procedure
Draft WF on single Tx switched UL
3GPP TSG-RAN WG4 Meeting #84bis
R GPP TSG RAN WG1 Meeting #90 Prague, P.R. Czechia, 21st – 25th August 2017 Agenda: WF.
WF on new NR CG sequences for PUCCH
Wayforward on Rel-15 NR Study Items
WF on NPUSCH scrambling for Rel-14 NB-IoT
WF on NR spectrum NTT DOCOMO, INC. R
WF on pre-DFT PT-RS pattern for DFTsOFDM
Summary of proposals on CBG-based retransmission
WF on single Tx switched UL
Proposals on remaining issues on PDCCH structure
Summary of offline discussion for PDCCH structure
Proposals on remaining issues on search space
WF on Beam Indication for Beam Management
WF on NB-IoT Radio Link Monitoring Performance Test Procedure
WF on measurement capability and measurement gap for NR
Way forward on UE EIS Spherical Coverage and Beam Correspondence
3GPP TSG RAN WG1 Meeting #90bis
Summary on Beam Recovery Mechanism
WF on spherical coverage in FR2
WF on remaining open items for allowing 1Tx transmission in LTE-NR DC
WF on Beam failure recovery
Illustration of RMSI monitoring windows (TDM)
WF on SS Block Index Reporting through RACH Procedure
Way forward on cell identification in NR
Discussion on TB-ack/CBG-Nack for initial transmissions
Intel Corporation, Apple
Proposal for defining requirement of LTE BHH TRP/TRS
Way forward on DL ACLR&ACS for WP5D LS
Samsung, KT Corp., NTT DOCOMO, Verizon, [ZTE], [CATT], [Intel]
WF on beam reporting CATT, Intel R1-17xxxxx
WF on Beam-Related Indication
WF on CSI timing offset for PUSCH
R WF on channel raster Nokia,.
Shanghai, China, April 11-15, 2011 Source: Qualcomm Incorporated
Motorola Mobility, Lenovo, …
WF on UE mandatory channel bandwidth for NR bands
Way Forward on Coexistence Evaluation Methodologies for LAA
WF on LTE-NR DC with UL coexistence
Summary on CA Aspects Samsung 3GPP TSG RAN WG1#91
Summary of Offline Discussion on RMSI CORESET Configuration (Part 2)
WF on UL Beam Management
WF on UL Beam Management
WF on CB-group based retransmission
WF on Phase discontinuity issue in intra-band EN-DC with 1-PA
WF on LTE-NR Coexistence
on the overall 5G-NR eMBB workplan
Presentation transcript:

WF on Radio Link Monitoring in NR 3GPP TSG RAN WG1 NR Ad Hoc Meeting R1-17xxxxx Qingdao, China, 27-30 June 2017 Agenda item: 5.1.1.5.3 WF on Radio Link Monitoring in NR Huawei, HiSilicon, Qualcomm, ATT, DOCOMO, Intel, Vivo, LGE

Background(1) Following agreements on radio link failure and radio link monitoring for NR have been made in RAN1 #89: Agreements: IS and OOS indications are based on SINR-like metric (e.g., hypothetical PDCCH BLER) as in LTE SINR-like metric as in LTE represents whether or not UE can receive PDCCH FFS: PDCCH in U-SS and/or PDCCH in C-SS RS used to derive SINR-like metric is down selected from following options Opt.1: CSI-RS Opt.2: DMRS for NR-PDCCH in C-SS Opt.3: DMRS for NR-PBCH Opt.4: NR-SSS Opt.5: RS for time/frequency tracking (if separate RS from above is defined for time/frequency tracking) FFS: how many options are used RAN1 assumes that single IS or OOS is indicated per reporting instance regardless number of beams available in cell. RAN1 has not concluded whether IS/OOS indications for RLF are per cell or not. RAN1 plans to provide at least periodic IS/OOS indications. FFS: possibility of additional aperiodic IS indication e.g., based on beam failure recovery mechanism.

Background(2) Agreements: RAN1 provides the following response to RAN2’s LS: Q1: Can the in-sync/out-of-sync indications for RLF be provided per cell? A1: RAN1 assumes that single IS or OOS is indicated per reporting instance regardless number of beams available in cell. RAN1 has not concluded whether IS/OOS indications for RLF are per cell or not. Q2: Is RAN1 planning to provide in-sync/out-of-sync indications that are periodic (similar to LTE)? A2: RAN1 plans to provide at least periodic IS/OOS indications.

Proposal NR should strive to provide aperiodic indication(s) based on beam failure recovery procedure to assist radio link failure(RLF) procedure, if same RS is used for beam failure recovery and RLM procedures. Example 1: aperiodic indication(s) based on beam failure recovery procedure can reset/stop T310 RAN2 can decide specific procedure Example 2: aperiodic indication(s) based on failure of beam recovery procedure How to use aperiodic indication can be decided in RAN2 FFS: aperiodic indication(s) based on beam failure recovery procedure to assist radio link failure(RLF) procedure if different RS is used