RF-Dipole Cavity Update

Slides:



Advertisements
Similar presentations
New Optical Inspection Results at JLab An in-depth update since Chicago meeting ILC08 (Highlights reported in US Regional Talk by Mark Champion) Rong-Li.
Advertisements

Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SPX - Cavity WBS U , U , U Genfa Wu SRF Scientist Accelerator Systems Division/RF Group DOE Lehman CD-2 Review of APS-Upgrade.
201 MHz and 805 MHz Cavity Developments in MUCOOL Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Nufact 2002 Workshop, London,
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Athmospheric Surface Treatments of Niobium A. Camacho*^, A.A. Rossi* and V. Palmieri*^, * INFN – Legnaro National Laboratories ^ University of Padua.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
RFQ Fabrication Plan, Schedule and QC PXIE RFQ Fabrication Readiness Review LBNL – June 26, 2013 Steve Virostek - Engineering Division Lawrence Berkeley.
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Nb 3 Sn Cavity ERL1-4 History of ERL1-4 – Nb 3 Sn coating, just HPR Test shows relatively flat Q vs E up to quench at ~13 MV/m, Q~1e10 – 5x HF rinse, HPR.
CAVITY TREATMENT (BCP, HEAT TREATMENT & HPR) Sergio Calatroni with many contributions from: Rama Calaga, Leonel Ferreira, Antonio Mongelluzzo LHC CCEM,
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
EUROPE Nov 27 –Dec 10 November 27 - Dec 10.
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
RF-Dipole Cavity: Processing and RF Measurements Procedure
DISCUSSION BCP in subassemblies or in fully assembled cavity? Silvia Verdú-Andrés | Brookhaven National Laboratory | 11 December 2015 Thanks to Mike Kelly.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
High Temperature Heat Treatment to Raise the Quality Factor of Large Grain Niobium Cavities Pashupati Dhakal Gianluigi Ciovati Ganapati Rao Myneni July.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
650 MHz Beta = 0.61 Cavity Design, Fabrication and Testing R. Rimmer for F. Marhauser Jefferson Lab, Newport News, Virginia 23606, USA Project-X Collaboration.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
RFD Cavity Frequency Fix Plan HyeKyoung Park SRF Engineering, Jefferson Lab 06/23/2016.
Resource Loaded Schedule and Budget Profile
Strategy and Status of Reference Cavities for European XFEL
Status of the M-ECCTD F. Peauger - P. Bosland
BCP Analysis Update Thomas Jones 22/7/16.
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
ILC-SCRF Test Facilities considerations
HQ Mirror Assembly R. Bossert
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
Crab – RFD prototype: Production Status Update
HQ Coil 19 Test Impregnation
Odu/slac rf-dipole prototype
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
KNU IP-BPM and Reference cavity
Surface Analysis of the Quench Area Sample of Cavity Z111
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Fabrication of Nb and Cu SPL cavities and required tools CERN status
Infrastructure inventory and use
High Q R&D at Fermilab Anna Grassellino TTC Topical Meeting on CW SCRF
SPS – RFD Experience and Evolution to LHC
Date of download: 11/13/2017 Copyright © ASME. All rights reserved.
SC spoke cavity for China-ADS 3~10MeV injector
Status of Cavities at DESY
Cleaning strategy for X-band structure Cu circular xxx:
9-cell Vender Qualification test for LCLS-II
RF-Dipole Cavity Update
Working Group 3 Summary TTC Meeting INFN Milan,March 3, 2011
تهیه و تنظیم :حسین عروجی
Development of Large Grain Cavities at DESY
Vertical Test Results of 9-Cell Cavities for LCLS-II
A. Bignami on behalf of LASA SRF Group
Prototype cryomodule development
FNAL update Martina Martinello.
Customer Events Manager (Procedure A) Insert, Update & Delete Events
Overview of RF Gun Specifications and Technical Issues
JLEIC SRF update SRF team
Paolo Michelato LASA - Status of cavity documentation, fabrication, inspection and NCRs Laura Monaco INFN – LASA 10° ESS SRF Collaboration Meeting, 25.
Presentation transcript:

RF-Dipole Cavity Update November 11, 2016

Current Status – RFD-001 & RFD-002 Completed Bulk BCP – CTR-002 – Nov 10, 2016 Average removal – 95 microns On Going BCPBulk BCP – CTR-001 – Nov 16, 2016 Surface inspection of CTR-002 post bulk BCP More chemistry is needed To be Completed Frequency measurement post bulk BCP CMM measurements of trimmed parts End plates – EVHOM-001, EVHOM-002, EHHOM-001 & EHHOM-001 Bulk BCP of parts (RFD-CAV-001) CTR-001, EVHOM-001 and EHHOM-001

Set Up – CTR-002 Two thickness gauges were used.

Thickness Measurements – RFD-CTR-002 94 111 106 81 101 105 115 84 56 123 97 85 82 96 Average removal – 95 micron

Post Bulk BCP – RFD-CTR-002

Post Bulk BCP – RFD-CTR-002

Next Steps RFD-002 For both RFD-CAV-001&002 Ready for welding after frequency measurement For both RFD-CAV-001&002 Heat treatment At 600 C for 10 hours Light BCP RF Test