RF-Dipole Cavity Update

Slides:



Advertisements
Similar presentations
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
 Outline: ◦ 325 MHz Superconducting Spoke Resonators in the Project X Linac (HINS front end). ◦ SSR1 Single Spoke Resonator with β g =.21: Fabrication.
Fabrication Progress for LHC Superconducting Crab Cavities April 17, 2015.
Vacuum Vessel Production Readiness Review
Page 1 Thinning of stamped End cap 1.The measurement from Niowave shows the corners of FPC and H-HOM openings are thinned and its thinnest area is 2.2mm.
Plans for 201-MHz Cavities Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory November 18, 2010.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Fabrication Progress for LHC Superconducting Crab Cavities July 10, 2015.
G. Olry for the IPN Orsay team 5 th SPL collaboration meeting, 25-26/11/2010, CERN.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
RFQ Thermal Analysis Scott Lawrie. Vacuum Pump Flange Vacuum Flange Coolant Manifold Cooling Pockets Milled Into Vanes Potentially Bolted Together Tuner.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Mechanical Issues SPL cavities/cryomodules Workshop CERN 30 Sep. 2009
201 MHz Cavity Status and Test Plans at MTA MICE Collaboration Meeting at RAL, UK October 22 ~ 24, 2005 Derun Li Center for Beam Physics Lawrence Berkeley.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
2.1GHz cavity without cell-to-cell coupling slots – 1.875” beam pipe Binping Xiao Aug
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1.3GHz Input Coupler for ILC
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
SPS D OUBLE -Q UARTER W AVE C RAB C AVITIES D ISCUSSION ON CAVITY PREPARATION PROCEDURES CERN, 28 October 2015 Silvia Verdú-Andrés, Toohig fellow at BNL.
Cavity Measurements By Aaron Cheng 4 May Overview RF measurements Waveguide-coax transition.
RF-Dipole Cavity: Processing and RF Measurements Procedure
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
Page 1 Subashini De Silva Center for Accelerator Science Old Dominion University CAVITY II – RF-DIPOLE CAVITY TEST RESULTS LHC – CC-13, CERN December 9-11,
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
S. Verdú-Andrés, LARP Toohig Fellow Brookhaven National Laboratory
Page 1 Jean Delayen Center for Accelerator Science Old Dominion University RF Dipole Cavity Design and Plans LARP Review Fermilab, 10 June 2013.
RF Modeling of the LHC Crab Cavity Zenghai Li SLAC Zenghai Li LARP CM20 April 8-10, 2013.
1 SLHiPP2013 meeting – Louvain la Neuve Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud Orsay cedex Tél. : Fax : +33.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Fabrication of Remaining Components Allan DeMello Lawrence Berkeley National Laboratory MICE RF Workshop Fermilab June 2, 2014.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
LCLS-II 3 rd Harmonic Dressed Cavity Design Review Chuck Grimm November 20, 2015.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
CERN – Zanon discussions
RF Dipole HOM Electromagnetic Design
SRF Crabbing Cavity R&D
Crab – RFD prototype: Production Status Update
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Odu/slac rf-dipole prototype
SPS – RFD Experience and Evolution to LHC
Double Quarter Wave Crab Cavity
Crab Cavity Manufacturing Readiness Meeting
Cavity + He Vessel interface
RF-Dipole Cavity Update
Superconducting RF Crab Cavities
UK RFD Pre-Series cryomodule
SNS Fundamental Power Coupler History
RF modes for plasma processing
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
System tests at CEA O. Piquet 19/03/2019
Cryomodule Design for CW Operation 3.9 GHz considerations
SNS Coupler Shipping Plans
Parameters Changed in New MEIC Design
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
RF Parameters for New 2.2 km MEIC Design
Presentation transcript:

RF-Dipole Cavity Update December 02, 2016

Current Status – RFD-001 & RFD-002 Completed  Bulk BCP Bulk BCP – CTR-001 – Nov 18, 2016 Average removal – 122 microns Bulk BCP – EVHOM-001 – Nov 29, 2016 Average removal – 58 microns Low removal in the stub  Assembled for 2nd bulk BCP Bulk BCP – EHHOM-001 – Dec 01, 2016 Average removal – 95 microns To be Completed  Final welds CMM measurements for end plate lengths End plates – EVHOM-001, EVHOM-002, EHHOM-001 & EHHOM-001 Weld prep Electron beam welding Weld inspection CMM measurements to determine weld shrinkage Leak test Frequency measurement

Thickness Measurements – RFD-CTR-001 112 94 164 123 117 109 130 98 157 131 128 111 128 109 Average removal – 122 micron

Thickness Measurements – RFD-EVHOM-001 62 O20 O24 -5 7 O23 O22 O21 O25 71 89 13 146 80 Average removal – 67 micron  Reprocessing going on

Thickness Measurements – RFD-EHHOM-001 FPC Port HHOM Port O05 O06 O08 O09 O07 O12 O17 52 69 43 134 185 87 186 78 105 73 102 Average removal – 112 microns

Thickness Measurements – RFD-EHHOM-001 39 O04 O14 O13 O15 O16 163 183 256 O10 111 57

Port Losses and Q for Stainless Steel Flanges Beam Port – VHOM Side Calculations at 1.0 J with Stainless Steel flanges Conductivity of stainless steel 6.99×106 S/m Pick Up Port VHOM Port Port Power Loss [W] Q Beam Port (HHOM) 2.64×10-5 9.53×1013 Beam Port (VHOM) 2.71×10-4 9.30×1012 FPC Port 5.76×10-5 4.37×1013 HHOM Port 6.52×10-4 3.86×1012 VHOM Port 3.02×10-9 8.34×1017 Pick Up Port 1.69×10-18 1.49×1027 Total 1.01×10-3 2.50×1012 FPC Port HHOM Port Beam Port – HHOM Side

Coupling Factors for VTA Test Test Probes FPC and Pick Up ports are used for VTA rf test Probe calibration: Qext (FPC): ̴6.0 × 109 Qext (Pick Up): ̴5.0 × 1010 Use same probe for all the VTA tests Bare cavity test Bare cavity test with HOM couplers Cavity with He-vessel test Coupling Factors for VTA Test 105.5 mm 4.5 mm Parameter Value Geometrical Factor (G) 107 Ω Residual Resistance (Rres) 10 nΩ Rs at 2.0 K 11.3 nΩ Q0 at 2.0 K 9.5×109 Rs at 4.2 K 81.3 nΩ Q0 at 4.2 K 1.32×109 4.5 mm 53.25 mm 44.5 mm

Cavity Assembly Set Up Beam Port – VHOM Side Pick Up Port Blank flanges VHOM Port FPC Port Nb coated blank flange HHOM Port Beam Port – HHOM Side To vacuum pump