TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS

Slides:



Advertisements
Similar presentations
Expert Panel on Liners This seminar is an attempt to involve the audience as much as possible in so far as to allow you to essentially control the content.
Advertisements

By Asaad Mohammad Automation and Mechatronics Lead Teacher
Tank 85 Foundation  View of poured auger pile.  Setting up for next pile.  This process repeated itself 310.
RESTROOM CLEANING DAILY AND WEEKLY MAINTENANCE. WHAT IS DIFFERENT? The application method!! WHAT IS THE SAME? What needs to be done!!
Module 3: Restroom Cleaning Problems and Solutions SPARKLING RESTROOM TRAINING PROGRAM.
Geometry Unit Project 6th grade.
When the floors are in position they are left a few weeks to dry. Meanwhile various tradesmen can start to put the finishing touches to the building, both.
THE SUMMER OF CHANGE Things are happening ….. WEEK ONE.
Your Company Name Here Subtitle or Logo here. What is Concrete Engraving?
Week 3 IT5 Describing ‘does’ with ‘how’. This teacher led activity aims to show how children can describe verbs more fully by adding a ‘How’ word (adverb)
Problem-solving with MATLAB Week 4: Computing volumes: cubic feet, gallons, measuring water NAME _________________________.
Readme slide for presentation Delete before use The following presentation is based on teaching the CAMT course using the CAMT Participant guide. It is.
Landforms Can you identify these landforms? Created by: Mrs. Kanas 2008.
Performing a titration A bluffers guide! Preparing a standard solution 4 Accurately weigh a weighing bottle, recording the mass 4 Add approximately x.
How to build a two storey house
Objective - To solve rational equations. Solve. Variable in denominator Restriction:
Norco Tank T/A Meeting  Review current contracting strategy & options for improved strategy  Review details of 2008 & projections for 2009 forward.
BRVFD & RS Training Facility Proposal 05/07/2009.
 Distance all the way around an object  Example: fence, backsplash, frame, border…  Perimeter is measured in linear units (ft, m, in)
Area VS. Volume Through this activity, you will explore different real-world situations and decide which one requires finding the VOLUME of an object using.
The Mosaic Idea For Physics
Harrington Pools Dedicated to providing excellence in pools.
INTERIOR PAINT & DRYWALL REPAIR Identify the tools needed to paint interior ceilings & walls Learn to repair damaged drywall Learn how to prepare rooms.
Mathematical investigation #1. How many little cubes can we fit into this classroom?
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Lab Instructions. Materials and Equipment Distilled Water Zinc metal Filter Paper Plastic Wash Bottle Copper II sulfate Tap water Pencil (not a pen) Plastic.
Math Flash Cards Area, Perimeter, and Volume By: Mrs. Scanlon Balls Bluff Elementary.
Christmas Around the World Matching Quiz Directions Think about the countries we studied this week. Think about the countries we studied this week. Look.
POOL CONSTRUCTION THE 5 MAJOR STEPS 1. Plan2. Dig3. Build4. Finish 5. Swim!
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
An Introduction to Cathodic Protection. The Problem Water and de-icing salts along the splash zone of the abutment walls to this roadbridge have caused.
Week 14 Ideally, prior to showing these slides, print the slides and cut up the sentences and pictures. Ask the learners in groups to match them, then.
Caulking, Drywall, Plaster, Orange Peel, Popcorn Ceilings, Locks, Tile Interior & Exterior Maintenance and Repair Course.
Volume and Surface Area of Prisms and Cylinders Per. Names: Date: 2/26/16.
Transform Your Old Floor into New One. Welcome to Love Marble Stone Care - We specialize in restoring marble and other natural stone surfaces - floors,
How can I find the area and perimeter of a rectangle? MCC.4.MD.3.
Objective - To solve work problems Work Rate TimeWork Done Work Rate TimeWork Done 5 hrs.1 Job.
How Our Earth Sheltered Homes are Constructed Earthlog ® Equity Group, Inc. The American Dream … The Future is Now
 We specialize in removing that irritating calcium deposit that every pool owner in the Central Valley struggles with.  Our.
Week 14 Ideally, prior to showing these slides, print the slides and cut up the sentences and pictures. Ask the learners in groups to match them, then.
 Know how to use equipment safely  Clean up spills immediately and report any accidents to teacher  Fire safety: stop, drop and roll  Tie hair back.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
Tile & Grout Cleaning (770)
بسم الله الرحمن الرحیم. Jet grouting.
Create decorative backsplashes, accent walls, or other focal points
SWIMMING POOLS CONSTRUCTED AND REPAIRED
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
SoUTh Shore Pool Supply
The Distributive Property and Area Models
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Here is a sketch of the floor of a swimming pool.
Distributive Property and GCF
Extraneous Solutions and Work Problems.
Building Structural Systems
FLOOR COATINGS TRAINING GUIDE
Safety in the Kitchen: Lab Protocols
Design your house the way it must be done!
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
BELL WORK.
MOSAICS Elements: Shape, Hue, Value
Spackling expert will do fine work General Home Improvement
Best Paint Options for a Concrete Around Pool By: Authentic Plastic and Tile
The Distributive Property
Unit 3 Creative Project Mosaic.

Reflecting, Learning, Improving
Lake 16 Dam Repair Presentation
Glen Eira Leisure Removal of Tiles and Painting to Pools
TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS
Presentation transcript:

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS REFURBISHMENT AND TILING OF AN EXISTING FIBREGLASS OUTDOOR POOL

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS REMOVAL OF EXISTING FIBRERGLASS LINER AND MOSIAC TILING OF POOL, PAINTING OF CONCRETE TILE SURROUND, ACID AND HOT WASH OF EXISTING FLAGS, FITTING NEW DOSING SYSTEM, REPAIR TO PIPEWORK, NEW POOL COVER, IMPROVEMENT TO CLEAN WATER DISTRIBUTION SYSTEM

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS THE FIBREGLASS LINED POOL THE START OF THE PROJECT

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS ALL THE EXISTING FIBREGLASS LINING (510 SQUARE METRES) HAD TO BE REMOVED – THIS WAS A PAINSTAKING PROJECT

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS SHOWN IS ONE OF OUR OPERATIVES PAINSTAKINGLY REMOVING THE GLASS LINING AND SCABBLING THE NEWLY EXPOSED WALLS TO ENSURE CORRECT THOROUGH PREPARATION

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS COMMENCEMENT OF MOSAIC TILING TO SHALLOW END

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS PREPARED DEEP END FLOOR BEING THOROUGHLY CLEANED PRIOR TO BEING TILED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS SHOWN IS THE POOL DEEP END IN THE PROCESS OF BEING MOSAIC TILED IN “POOL BLUE”

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS ONE OF OUR OPERATIVES QUALITY CHECKING AN AREA OF POOL WHICH HAS BEEN GROUTED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS SHOWN IS ONE OF OUR FEMALE OPERATIVES GIVING THE FINISHED SHALLOW END THE “WOMANS TOUCH” PRIOR TO POOL FILLING

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS BEFORE AND AFTER PICTURES OF SURROUND TILES

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS ACID AND HOT JET WASHING OF SURROUNDING FLAGS BEFORE AND AFTER

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS THE POOL BEING SLOWLY FILLED

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS THE FINISHED POOL DURATION APPROX 5 WEEKS FROM START TO FINISH

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS BEFORE AND AFTER – WHAT A TRANSFORMATION ON TIME AND IN BUDGET!!

TOTAL SWIMMING POOL REFURBISHMENT SOLUTIONS Comments made by Mr Mark Hart “Operations Manager” of the School “Thank you very much for all you have done for us to date an excellent job, I very much look forward to working with you all again”