LNBA Subgroup: Avoided Transmission Value

Slides:



Advertisements
Similar presentations
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
Advertisements

Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
Real Options and Transmission Investment: the New Zealand Grid Investment Test Glenn Boyle, Graeme Guthrie and Richard Meade EPOC Winter Workshop University.
Arizona Transmission System Overview November 18, 2014 Tribal Solar Working Group 1.
California Energy Commission Resource Adequacy Demand Forecast Coincidence Adjustments R Resource Adequacy Workshop January.
An Overview of Arizona’s Renewable Transmission Planning Process Southwest Renewable Energy Transmission Conference Amanda Ormond – Ormond Group LLC Brian.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
Value and Cost of Distributed Generation ACC Staff Workshop #1 – May 7, 2014 Docket No. E-00000J DG Valuation ─ Lessons from the APS Distributed.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
Avoided Cost and E3 Calculator Workshops Energy and Environmental Economics, Inc. October 4, 2005.
Anti-Sweat Heater Control Small Saver UES Measure Regional Technical Forum September 17, 2013.
1 Energy Division Workshops: LTPP Planning Standards (Part 1) & Procurement Rulebook June 11, 2010 Workshop R , Tracks 1, 2, & 3.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM IEPR Workshop Southern California Reliability: Transmission System Additions.
1 ACT 61 INCREASED INVESTMENT AND SAVINGS SCENARIOS Summary Of Methods Used To Develop Inputs For Analysis of Cost-Effectiveness and Rate Impact John Plunkett.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Recent Activities for LIEE and CARE November 2007 Proposed decision submission (R ) Proposed decision submission (R ) IOU reporting.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
Presentation Title SOUTHERN CALIFORNIA EDISON® SM SOUTHERN CALIFORNIA EDISON® SM Regulatory Affairs Net Load Peak ELCC Draft Results / Work.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
LNBA Subgroup: Avoided Transmission Value
Principal Load Profiling and Modeling
Integrated Capacity Analysis Working Group
Transmission-Distribution Interface Working Group Meeting
SEIA Perspective on Smart Inverter Functions
Modeling Renewable Microgrids in South Africa
Locational Net Benefit Analysis Working Group
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
Proposed Medicaid Hospital Outpatient Prospective Payment System
Hourly vs TOU Avoided Costs
SEIA Perspective on Marginal/Avoided CAISO Transmission Costs
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Locational Net Benefit Analysis Working Group
Preliminary Electricity Rate and Time of Use Rate Scenarios
Integrated Capacity Analysis Working Group
Facebook Campus Expansion Project EIR
August LNBA Agenda Time Topic 1:00 – 1:15
SPSG Meeting August 17, 2016 Salt Lake City, UT
Distribution Systems and Planning Training
Resource Adequacy Demand Forecast Coincidence Adjustments
Integrated Distribution Planning Process
Final Year Project COMP390/393/394/395
Introduction to Growth Scenario Working Group
Discussion and Vote to Amend the Regulations
Integrated Capacity Analysis Working Group
Rule 21 Working Group 2 Issue 6 subgroup
Avoided Cost and E3 Calculator Update Workshop
DECISION
ICA Methodology Clarifications ICA Working Group 5/18/2016
DER Growth Scenarios and Load Forecasts Working Group
DC State Community Solar Policy Trends National Conference of State Legislatures Webinar June 7, 2018 Autumn Proudlove Senior Manager of Policy Research.
Rate Design Matters… A Lot
Presentation transcript:

LNBA Subgroup: Avoided Transmission Value July 19, 2017 Webinar drpwg.org

Overview Long-Term Refinement (June 7 ACR) and Decision 17-09-026 (September 8) IOUs are to serve proposals for modeling and/or methodological approaches to achieve the third use case (use of LNBA in cost-effectiveness evaluation) within 60 days of the Decision (Dec.6) LNBA WG would like to avoid parallel discussion and overlapping comments between the Final Long-Term Refinement Report (due Jan. 8) and comments on the IOUs’ methodology filings (separate Energy Division-led process). The WG submitted proposals and discussion that has been held here may inform the ED-process. This WG final report will also summarize discussion to date for the LNBA deferral use case; however, given upcoming projects and overlapping discussions (e.g., Oakland Chinatown case study), this is not meant to be the primary focus.

Overview Next Steps Written proposals are due Dec. 6. MTS will summarize discussion to date within the WG, and include all written proposals into the Final LTR report in full Opportunities for comments and written responses to proposals on the avoided transmission topic, including comments on the utilities’ proposals due 12/6, will be shifted to the upcoming regulatory process focused on the Track 1 Decision (rather than in the Working Group report comment process), which envisions comment periods and workshops on this LNBA topic. This avoids the need to submit overlapping sets of comments on similar issues

Incorporation of LNBA Avoided Transmission Costs into DERAC LNBA Working Group

Understanding SCE’s Transmission System Mira Loma Lugo Victor Kramer Antelope Magunden Inyokern Vincent Control Rector Big Creek Mead Gene Palo Verde Midway J. Hinds Eagle Mt Alamitos Eldorado ARIZONA NEVADA CALIFORNIA Eastern 20% Metro 51% Devers Valley 7% Whirlwind Ventura 7% Red Bluff Colorado River Big Creek 12% Outer Rural 3%

Impact and Value of DERs on SCE’s Transmission System Category Regions Load and Generation Characteristics Effect of Net Peak Load Reduction Value of Net Peak Load Reduction Import Metro Major load center with limited generation Reduce transmission constraints through reduced imports Positive Value Ventura Isolated load center with limited generation Export/Transfer Outer Rural Limited load and extensive renewable energy development Exacerbate transmission constraints through increased exports Negative Value Ambiguous Big Creek Load and generation both extremely whether dependent Highly varied from year to year Neutral   Valley Limited growth, moderate renewables development Uncertain Eastern

Estimated Avoided Cost Value Regional granularity Locational granularity cannot be specified within a region. Therefore, assume needs, and associated avoided costs, are averaged across region Estimating avoided cost of deferred projects Cannot develop “hypothetical” needs projects based on counterfactual analysis without extensive transmission planning analysis Therefore, use MTC to estimate avoided cost per kW Estimating needs Earlier years: limited deferral opportunity Planned capital dollars are primarily to completed existing projects Fewer anticipated grid needs Later years: More deferral opportunities More needs anticipated throughout the grid Calculating value: Escalating fraction Earlier years: Few needs to be deferred  small average value Assume average avoided cost to be fraction of MTC Later years: Assume needs increase over time. Eventually assume deferrable projects in all locations  larger average value Assume average avoided cost to be full MTC Apply RECC methodology to calculate present value of estimated avoided costs