Alabama Asphalt Pavement Association

Slides:



Advertisements
Similar presentations
By Robert J. Blight Project Engineer Bureau of Materials.
Advertisements

Paving Potpourri 2015 Spec Changes and More! Bob Dyer Assistant State Construction Engineer WAPA Joint Training March 2015 Lynn Peterson Secretary of Transportation.
Analyzing Multivariable Change: Optimization
Section Cross Slope District 1 Your logo here.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Recycled Asphalt Program & Environmental Stewardship Program (Post Consumer Content) Robert C. Rea Nebraska Department of Roads WASHTO – Omaha, Nebraska.
PPTG Thin Overlays Task Group (TOADS) Team Overlay Asphalt Debaters Presented by Basem Muallem (CT) - Tony Limas (Industry) April 19, 2005.
Construction of LLP HMA Pavements Pre-bid Meeting Solano 80; 04-4A0104 District 4 Oakland, CA September 14, 2012 Bob Humer.
WMA TWG December NCAT WMA Research 2007 Andrea Kvasnak.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Ornulv (Arnie) Sonsteby, PE Penn State / FAA Airport Conference 2007
Example #4: Designing Superelevation
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
Uniform Paving Platform A Contractor’s Perspective J. Brent Moore Regional Manager Branscome, Inc. - Richmond.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
TRB AFK10 Committee on General Issues in Asphalt Technology Update on NCAT Test Track and Other Research Results April 24-26, 2006.
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Materials Specifications & Virginia Test Methods (VTM’s) 2014 Regional Asphalt Seminars Rob Crandol, P.E. Statewide Asphalt Program Manager.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
Porous Asphalt The Specs Tim Horton, Skillings Connolly Jessica Knickerbocker, City of Tacoma Mark A. Palmer, P.E., LEED AP, City Engineer, City of Puyallup.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
CAD Standards Presented by Gary Holeman PE Senior Design and Automation Engineer Roadway Engineering unit
FUEL AND ASPHALT COST ADJUSTMENT PROVISIONS. Use of Cost Adjustment Provisions FHWA Technical Advisory Dec 10, 1980 –“Price volatility of construction.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Session #3 Asphalt 103- Materials: Basics of RAP, Usage and Specifications.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
THE DESIGN OF POROUS PAVEMENT SHOULDERS AT RICHMOND INTERNATIONAL AIRPORT 33 rd Annual Airports Conference March 3, 2010 – Hershey, PA Presented by: H.
Paving the way for over 60 years Presentation at the January 10, 2007 NCAUPG Technical Conference By Dusty Ordorff Bituminous Roadways, Inc.
3 - 1 Holding The Contractor to 105% of the Target Spread Rate!
STH 21 Adams County Project # Project Specifics Project Specifics Asphaltic Pavement Milling Asphaltic Pavement Milling Pulverizing Shoulders.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Quantity Calculations Module 3. Quantity Calculations  Specifications  Post Bid Quantity Calculations  Production Quantity Calculations –Checking Yield.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
ALDOT Specifications Update
Alabama Asphalt Pavement Association
David P. Shiells, P.E. District Materials Engineer
Office of Materials and Road Research
Uniform Paving Platform A Contractor’s Perspective
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
12th TRB National Planning Application Conference Xiaobo Liu, Ph.D.
ALDOT Specification Updates
Presenters: Sumon Roy1 and Badrul Ahsan1
ACEA Annual Conference
Pavement condition index calculation
Update on the current APT Project in Texas
ALDOT Pavement Preservation Policy
ACP Inspector Certification Homework (oops, not homework) Solutions
Traffic Control Plan Development Course
MnDOT Office of Civil Rights Disadvantaged Business Enterprise (DBE) Special Provisions Update March 2017.
Panel discussion Date.
Longitudinal Joint Construction – Why Straightness Matters
ACEA Annual Conference
2018 Surveys and Evaluations
Pavement Type Selection – Updated Guidance on Use of Alternate Bidding
Engineering Geology I (GED355) S
Compaction Process in the Field
Materials and Tests Engineer
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Introduction Persons engaged in surveying are often called to determine volumes of various types of material. The most common unit of volume is cubic having.
Missouri Stringless Paving: I-35 Unbonded Concrete Overlay
Materials and Tests Engineer
Getting the Most Value for Your Assessment Dollar: Cost Analysis for the New Kentucky Assessment System John F. Olson Assessment Solutions Group CCSSO.
Analyzing Multivariable Change: Optimization
Presentation transcript:

Alabama Asphalt Pavement Association 630 Adams Avenue Montgomery, AL 36104 334/834/5314 (Phone) 334/834/5537 (Fax) E-mail: alapa@bellsouth.net Web site: www.alasphalt.com

2015 ALDOT PRE- CONSTRUCTION CONFERENCE CONTRACTOR’S PERSPECTIVE ON CROSS SLOPE MAY 7 , 2015

CROSS SLOPE CURVE SECTIONS TANGENT SECTIONS GENERAL ISSUES OTHER ISSUES

CURVE SECTIONS

CURVE SECTION DATA NEEDED PC STATION PT STATION BEGIN TRANSITION STATION END TRANSITION STATION REQUIRED CROSS SLOPE

CURVE SECTION DATA ISSUES PC STATION AND PT STATION ON PLANS OFTEN DO NOT MATCH PC STATION AND PT STATION IN FIELD. REQUIRES FIELD ADJUSTMENTS DURING CONSTRUCTION. POSSIBLE QUANTITY CHANGES. SUGGEST ALDOT VERIFY AND STAKE FIELD LOCATIONS PRIOR TO PROJECT LETTING.

TANGENT SECTIONS

TANGENT SECTION DATA NEEDED CROSS SLOPE REQUIRED OR MATCH EXISTING CROSS SLOPE.

GENERAL ISSUES

GENERAL ISSUES CROSS SLOPE VERSUS SPREAD RATE. IF MATCH EXISTING CROSS SLOPE, SPREAD TOLERANCES CAN GENERALLY BE MAINTAINED. IF CORRECTING CROSS SLOPE, SPREAD RATE TOLERANCES CAN NOT BE MAINTAINED. PAY ITEM NEEDS TO BE SPECIFIED AS LEVELING.

GENERAL ISSUES MILLING VERSUS LEVELING. EASIER AND MORE ECONOMICAL TO MILL IN CROSS SLOPE VERSUS LEVELING IN CROSS SLOPE WHEN ROADWAY STRUCTURE ALLOWS. NO SIGNIFICANT COST INCREASE TO MILL 1” VERSUS 2” VERSUS 3” , ETC.

GENERAL ISSUES MANY TIMES EASIER TO MILL IN TANGENT SECTIONS THAN CURVE SECTIONS. CURVE SECTIONS GENERALLY LACK CROSS SLOPE RATHER THAN HAVING TOO MUCH CROSS SLOPE. PARTIAL LANE MILLING CAN STILL BE EVALUATED.

Economics Of RAP Value Of RAP Assume AC Liq. Ton @ $450.00 / Ton Assume Virgin Agg. @ $ 15.00 / Ton RAP 5% AC And 95% Aggregate Per Ton Value Of RAP .05 x $450.00 = $22.50 .95 x $ 15.00 = $14.25 One Ton Of RAP = $ 36.75* *Does not include costs to mill, haul and process

GENERAL ISSUES MILL / FILL INFORMATION TABLES. PROVIDES APPROXIMATE DEPTHS OF MILL / FILL ALONG PROJECT AT VARIOUS STATIONS. CHECK ACCURACY OF DATA. VALUABLE INFORMATION FOR CONTRACTOR TO EVALUATE DEPTH OF FILL VERSUS MAXIMUM ASPHALT LAYER LIFT THICKNESS. DETERMINES HOW MANY PASSES REQUIRED TO PLACE REQUIRED LEVELING THICKNESS.

GENERAL ISSUES NEED ACCURATE QUANTITIES OF MILLING AND LEVELING FOR BIDDING PURPOSES. LEVELING QUANTITIES ARE MORE FREQUENTLY INACCURATE THAN MILLING QUANTITIES. QUANTITIES ARE GENERALLY UNDERESTIMATED. SITE VISIT BY DESIGNERS MAY HELP EVALUATION OF THESE AND OTHER QUANTITIES.

GENERAL ISSUES ROADWAY DENSITY FOR LEVELING LAYERS SHOULD BE MAXIMUM ACHIEVEABLE DENSITY FROM ROLLER PATTERNS ESTABLISHED BY NUCLEAR / NON-NUCLEAR GAUGES. CORES AND TARGET PAY FACTORS ARE NOT REASONABLE FOR ROADWAY DENSITY FOR LEVELING LAYERS.

OTHER ISSUES

OTHER ISSUES WHENEVER POSSIBLE ESTABLISH PAY ITEMS AND QUANTITIES FOR REQUIRED WORK. MAKING REQUIRED WORK SUBSIDIARY OBLIGATION OF OTHER PAY ITEMS CREATES UNKNOWN QUANTITIES / SCOPE OF WORK FOR CONTRACTOR. UNKNOWN = ADDED $$$$$$$$.

OTHER ISSUES CONTRACTOR REVIEW OF PRELIMINARY PLANS FOR COMPLEX / LARGE PROJECTS. CONTRACTORS CAN SUBMIT IDEAS ON SEQUENCE OF CONSTRUCTION, CONSTRUCTABILITY OF PROJECT, ETC. MONTHS BEFORE TWO WEEK BID ADVERTISING WINDOW. MORE COMPLETE AND ACCURATE PLANS = LESS UNKNOWN = REDUCED $$$$$$.

OTHER ISSUES TEMPORARY EDGE LINE STRIPE ON RESURFACING PROJECTS. ELIMINATING PAY ITEM GENERALLY DOES NOT REDUCE PROJECT COST. CONTRACTOR LIABILITY ISSUES. SCORING PAVEMENT SHOULDERS.