YETS 2017 TE-CRG-OP overview of tasks to perform during the first month. 2017-10-09_GF YETS2017_CRG-OP.

Slides:



Advertisements
Similar presentations
CURRENT STATUS OF CV INSTALLATIONS, WORKS DURING LS1 AND PROBLEMS ENCOUNTERED DURING START-UP NORTH AREA Bill Bannister / Jani Lehtinen EATM – 7 th October.
Advertisements

UNICOS-CPC applied to Cryogenics and specifications Benjamin Bradu EN-ICE-PLC February 2014.
Current status Arkadiy Klebaner November 21, 2012
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
SOFT 2004 OVERVIEW OF CRYOGENIC TECHNOLOGY FOR THE THERMONUCLEAR FUSION P. DAUGUET, M. BONNETON, P. BRIEND, F. DELCAYRE, B. HILBERT, A. RAVEX Air Liquide.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
PLC Based sequential batch process CONTROL system
April 19, 2006A.Klebaner Cryogenics for ILC TA Current Status Plans and issues.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
EN-CV interventions during YETS
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Ahmed Sidi-Yekhlef, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN FLOATING.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
G-2 Cryogenic System Restoration of G-2 Refrigerator for Proposed E969 Experiment WBS 1.11 Tony Nicoletti 2/8/06.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
TE-CRG Activities D. Delikaris, TE-CRG.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Recycler/Ecool Shutdown Planning Meeting (6/4/2010)
TAC2 Alpi consolidation in Cryogenics and Cryomodules.
Cryogenics Fault Tree A. Niemi & E. Rogova. Contents 1.Introduction of the current tree structure 2.Failure rates observed in 2015 failure data 3.Unsure.
Thomas Jefferson National Accelerator Facility Page 1 CEBAF Cryo & SRF Workshop April 3, 2014 Mathew Wright Cryogenic Systems Operations Engineer
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Operation of cryogenics for LHC detectors: what did we learn? European Cryogenics days U. Wagner, CERN.
Overall planning, consolidation, stops, time line K. Foraz MAC – April 27th 2010 April 27th 20101K. Foraz - Machine Advisory Committee.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
A technical proposal for the consolidation of the LHCA cryogenic elec/control system for the HL-LHC era. 07/10/2017 Simon MARTIN Marco PEZZETTI Simon MARTIN.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Update on the PSB Cooling and Ventilation Systems
Desmi Pumps in operation at LHCA P4 & P6
EN-CV activities for LHC during LS2
FRIB Cryogenic Support
Cryoplant Installation Scope
AD consolidation activities in LS2
LHC Performance Workshop (Chamonix 2016)
CRYOGENICS – strategy, unavailability root causes and limitations
n_TOF “Draft” plans for YETS and LS2
Preparation of the activities for the LHC Long Shutdown 2
SPS EN-CV Planning LS (initial draft)
CV maintenance works during YETS
Activities of the ME section during LS2 ( )
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
CRG-ME YETS 2017/2018 activities
Short LHC-TS week 38 Confirmed by LMC on 16th August
Status of the cryogenic system for B180
EYETS septa status Septa activities TE/ABT Thierry Masson
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
KFA45 Hydraulic System Overview
Cryo stop of P8 on 1st of November
SC1R Cold Box PDR Controls
Mathew C. Wright October 2016
IBBelle: Status Commissioning at MPP Transport to KEK
Mathew C. Wright January 26, 2009
CERN with UNICOS M. Pezzetti AT_ECR_CE 27 June 2005.
Overarching Commissioning Plan
Operator Training Requirements
SNS Cryoplant Commissioning Past Experiences
KAGRA PLC System Overview
P8 cryogenic PLC problems on
Aziz AMAMOU EACM – 21th May 2019
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Presentation transcript:

YETS 2017 TE-CRG-OP overview of tasks to perform during the first month. 2017-10-09_GF YETS2017_CRG-OP

Time schedule See KB presentation 2017-10-09_GF YETS2017_CRG-OP

Maintenance tasks foreseen 2/2 ATLAS MR/SR: Replace oil pumps (magnetic coupling) Update plateform for solenoid dewar Install new pumping system MRCB Consolidation SOL control rack? Upgrade CPU (MR) Replace communication link pump 2 Cold boxes/ Comp software update ANRS Water tanks refurbishing Add 3 ways valves and redundant SV CMS Upgrade CPU and vacuum measues Charcoal Adsorber insultation refurbishing (calorifuge) Oil retention to build under new oil separator Add 3 new purges line (charcoal filter outlet, HP/LP line CS-CB) All: instrumentations/small mechanical upgrade 2017-10-09_GF YETS2017_CRG-OP

Maintenance tasks foreseen 1/2 LHC Compressor stations SACO and associated instrumentation to replace/rewire Sealing to inspect/replace: QSCA-4-CPA, QSCA-8-M02, QSCB-18-2P640, QSCB-8-M06 Small mechanical maintenance Piping to clean QSCCB_P18 Instrumentation to check/exchange LHC Cold boxes Valves to replace TU7_LHCA-P4 to exchange Turbines instrumentation to inspect/replace Self regenerated Colling water filter (prototype) to install P6 Cold compressor calibration/recover data 2017-10-09_GF YETS2017_CRG-OP

Controls tasks foreseen LHC Update data server/FEC PLC reload with individual FF and software updates 8 Premium to replace Interlock review and associated software update; only 1 hardware modified (QSCA_P6) with simplified safety chain. Prototype updated Cold compressor control (remove “kundig” plc and install soft in UNICOS) for prototype LHCA_P8, TBC Minors updates. 2017-10-09_GF YETS2017_CRG-OP