HCAL Commissioning and Related Activities

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
1 Calice UK Analysis Meeting 23/1/07David Ward Cambridge data analysis work David Ward Main focus – data-MC comparisons Using “official” reconstructed.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
We observe two classes of anomalous signals in HCAL 2) Cherenkov light produced by interactions in the window of the Forward Calorimeter PMTs ¼ photoelectrons.
Study of HF pmt high tail signal FNAL: Jim F, Rick Vidal Iowa: Ugur Akgun, Asli Albayrak, Warren Clarida, Antony Moeller, Yasar Onel, Justin Parsons, Taylan.
MTCC –II & HCAL noise chasing Mandakini Patil India-CMS meeting Jan07 Shantiniketan.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
1 HCAL Upgrade TP simulation studies Jane Nachtman (Iowa) – for the HCAL group Trigger Upgrade meeting April 28, 2010.
University of Iowa HEP Group CMS Analysis 1. 2 Outline As University of Iowa HEP group, we are involved with several different physics analysis. Electroweak.
1 TASK B1 OVERVIEW By YASAR ONEL The University of Iowa DOE SITE VISIT 2009 (fy10) I)CMS EXPERIMENT HCAL (HF) CALORIMETERHCAL (HF) CALORIMETER II)CDF EXPERIMENT.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
HCAL General Meeting: DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova Frank Chlebana HCAL General Meeting Apr 21, 2011.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
India in DØ Naba K Mondal Tata Institute, Mumbai.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
30/06/08E. Garutti1 CALICE testbeam 2008 FNAL. 30/06/08E. Garutti2 The installation.
Quartz Plates R&D Status By F. Duru, S. Ayan, U. Akgun, J. Olson, Y. Onel The University Of Iowa V.Podrasky, C. Sanzeni, D.R.Winn Fairfield University.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Beam Test of a Large-Area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System Vallary Bhopatkar M. Hohlmann, M. Phipps, J. Twigger, A.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
10-Dec-2008 / S.KunoriHCAL Noise Identification and Monitoring1 HCAL Noise Identification and Filtering (HPD behavior and noise identification) Shuichi.
Feb 24, Abnormal Events in HF: TB04, Simulation, and Feb.08 Fermi Testbeam Anthony Moeller (U. Iowa) Shuichi Kunori (U. Maryland) Taylan Yetkin (U.
HF Calorimeter PMT Upgrade R&D Yasar Onel for University of Iowa, Fairfield University, INFN, Trieste.
Quartz Plate Calorimeter Prototype Hardware & Preliminary Test Beam Data Anthony Moeller The University of Iowa.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Testing Physics Examine at D0 FNAL/Univ. of Illinois Soojin Kwon Advisor: Pushpa Bhat (FNAL) 3 July 2002.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
ECAL Shift Duty: A Beginners Guide By Pourus Mehta.
CALICE Collaboration Meeting Sept Roman Pöschl LAL Orsay - Data Collected with the Ecal - Ecal in July running - Collected Data and Glimpse on Quality.
ATLAS Tile Calorimeter Data Quality Assessment and Performance
CMS ROC Report Patricia McBride May 26, 2005.
Calorimeter Status Electronics Installation and Commissioning
EZDC spectra reconstruction and calibration
Experimental Method: 2 independent detectors on both sides of IP
IFR Status Summary W. Baldini on behalf of the IFR Group
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Preparation for CERN test beam
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
CMS Preshower: Startup procedures: Reconstruction & calibration
HE Calorimeter Upgrade Studies
Muon DPG 2012 Camilo Carrillo (INFN Napoli) Tim Cox (UC Davis)
F.Guber, A.Ivashkin INR, Moscow
Overview of CLAS12 Calibration
HE Calorimeter Upgrade Studies
HCAL DPG News Sunanda Banerjee – SINP Olga Kodolova – SINP MSU
Chris Smith California Institute of Technology EPS Conference 2003
ScECAL+AHCAL+TCMT Combined Beam FNAL
U of Iowa CMS group Physics Progress and Plans Jane Nachtman
Rick Salcido Northern Illinois University For CALICE Collaboration
High Granularity Calorimeter Upgrade Studies
Experimental Method: 2 independent detectors on both sides of IP
LC Calorimeter Testbeam Requirements
Rick Salcido Northern Illinois University For CALICE Collaboration
Presentation transcript:

HCAL Commissioning and Related Activities Fermi National Lab CERN University of Iowa Anthony Moeller

HCAL ROC Shifts at Fermi Several group members take shifts at the Remote Operations Center (ROC) located at Fermi National Lab. Two kinds of shifts, Offline and Online. Offline Shift: Shifters pick an analysis task as suggested by: HCAL PFG (Prompt Analysis Group) HCAL Operation Team Savannah Hcal Noise Task Force Hcal Roc Group

HCAL ROC Shifts, II Online Shift: Shifts are parallel to CERN. Data and operations are checked by shifters at both locations, with ongoing communication between CERN and FNAL. Start with current status check (Magnet, High Voltage, etc.) Run checklist for runs longer than 15 minutes and compare with CERN . Additional quality checks (pedestals, hot and dead channels, etc.)

HCAL ROC Shifts, III Group members who have taken or are scheduled to take shifts at FNAL ROC: Ugur Akgun Elif Albayrak Kwangzoo Chung Warren Clarida (Coordinator) Firdevs Duru Anthony Moeller James Wetzel Taylan Yetkin Kai Yi Iowa group members have taken 11.6% of the shifts from April through the end of October 2009.

ROC/LPC Activities By Warren Clarida Co-coordinator of the HCAL Fermilab ROC shifts for Aug CRAFT09. Coordinator of the HCAL Fermilab ROC shifts for the startup of the LHC. HCAL prompt feedback group tasks: Investigated rates and quality monitoring for non-zero suppressed runs. Studied readout box noise events. Designed the standard histograms created by the HCAL Noise Monitor component of the HCAL Combined Monitor code developed at Fermilab. Pictures and plots are on the next slide.

PFG Task results FED size with and without RBX noise events Non-Zero Suppressed rate from May - July global runs Unsuppressed rate for a group of May Global Runs 6

HCAL Noise Monitor Plots http://home.fnal.gov/~jhirsch/hcal/trendplots/HcalRocMonSummary_109046-112647/runlist.html The standard plots that are produced by the HCAL noise monitor for every run.

HF Jet Energy Rates By Elif Asli Albayrak Used Monte Carlo minbias data to produce energy rates for all jets and HF jets. Compare simulation results with real data. Minbias events energy rate for all jets. Minbias events energy rate for only HF jets.

HF PMT Simulations By Anthony Moeller Can see RBX shape PMT events only (Simulation) By Anthony Moeller Cerenkov radiation from particles hitting the PMTs in the readout box behind HF can create abnormally large signals. PMT events could be mistaken for new physics. Abnormally large signals were seen for pions and muons at the 2004 testbeam. A modified simulation including the PMTs was used to verify the cause of these events. PMT hits exist for muons and pions, but not electrons (See next slide).

HF PMT, Cont. 150 GeV Muons 100 GeV Pions Green – PMT events Red and Blue – HF Body events PMT events occur earlier than normal events (particles going all the way through HF travel at ~c, the signal in the fibers is slower). Cutting events with a pulse time < 47 ns eliminates 98.6% (88.8%) of PMT events for muons (pions), but also cuts 6.5% (9.3%) of physics events.

Monitoring of HCAL and Jet triggers CERN-based activity of Kwangzoo Chung (April 2008 – April 2009) HCAL trigger monitoring projects Online trigger primitive occupancy plots Offline Data Quality Monitoring of HCAL trigger primitive Trigger cross section monitoring Level 1 trigger – Jet Rates from CRAFT (cosmic ray global run) 2008 data (CMS-CFT-09-013-002) Occupancy of HCAL trigger primitives in eta and phi, accumulated online through CMS data acquisition system (Chung) 11

Meetings ROC/HCAL Commissioning HF PMT Simulation HCAL DPG Meetings (CERN) HCAL ROC Meetings (LPC) HCAL Noise Task Force Meetings (CERN/LPC) HF PMT Simulation HCAL+ECAL Simulation Task Force Meetings (CERN/LPC) CMS Week HCAL Meetings (CERN) CMS Upgrade Workshop at FNAL, by Anthony Moeller ( Oct. 2009) 2009 Prairie Section APS Meeting, by Anthony Moeller (Nov. 2009)