NA4 Test Team Status Test meeting, 07/09/04

Slides:



Advertisements
Similar presentations
Samsung Smart TV is a web-based application running on an application engine installed on digital TVs connected to the Internet.
Advertisements

RSS RSS is a method that uses XML to distribute web content on one web site, to many other web sites. RSS allows fast browsing for news and updates.
Working Out with KURL! Shayne Koestler Kinetic Data.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
EGEE is a project funded by the European Union under contract IST Project Technical Forum C. Loomis (LAL-Orsay) GAG (CERN) July 6,
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
Standards for Technology in Automotive Retail STAR Update Michelle Vidanes STAR XML Data Architect April 30 th, 2008.
EGEE is a project funded by the European Union under contract IST Collaboration Board F.Gagliardi Project Director Cork Conference, 20 th April.
EGEE is a project funded by the European Union under contract IST Tools survey status, first experiences with the prototype Diana Bosio EGEE.
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
EGEE is a project funded by the European Union under contract IST Unit testing coordination and interface testing. David Collados Testing Team.
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Metadata Content Entering Metadata Information. Discovery vs. Access vs. Understanding Cannot search on content if it is not documented. Cannot access.
EGEE is a project funded by the European Union under contract IST GLite Integration Infrastructure Integration Team JRA1.
EGEE is a project funded by the European Union under contract IST WSDL Which WSDL Style ?
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
Configuration & Management for Joachim Flammer Integration Team EGEE is a project funded by the European Union under contract IST JRA1 all-hands-meeting,
JRA1 Testing Current Status Leanne Guy Testing Coordination Meeting, 13 th September 2004 EGEE is a project funded by the European.
Induction: What is EGEE? –April 26-28, EGEE organisation and procedures John Murison, EGEE Training Team EGEE is funded by the European Union.
EGEE is a project funded by the European Union under contract IST WSDL Which WSDL Style ? 17 th October
EGEE is a project funded by the European Union under contract IST GN2 SA3 End to End Quality of Service Toby Rodwell DANTE First EGEE Conference,
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
EGEE is a project funded by the European Union under contract IST Report from the PTF Fabrizio Pacini Datamat S.p.a. Milan, IT-CZ JRA1 meeting,
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
INFSO-RI Enabling Grids for E-sciencE EGEE is a project funded by the European Union under contract IST Report from.
Training for developers of X-Road interfaces
A report by Olaf-Michael Stefanov to the JIAMCATT community
Bob Jones EGEE Technical Director
Automatic Documentation Systems
Report from the PTF Fabrizio Pacini Datamat S.p.a.
Supporting quality devices
Regional Operations Centres Core infrastructure Centres
Training for developers of X-Road interfaces
Parsing JSON JSON.NET, LINQ-to-JSON
Support Operation Challenge – 1 SOC-1 Alistair Mills Torsten Antoni
NA2 Dissemination John DYER Activity Leader
Metropolia 2013 C# programming and .NET framework
Archiving and Document Transfer Utilities
JRA3 Introduction Åke Edlund EGEE Security Head
CE-Monitor Luigi Zangrando INFN-Padova
SAP Business One B1iF Training
Prepared by: Galya STATEVA, Chief expert
Technical Board Meeting, CNAF, 14 Feb. 2004
R-GMA Security Stephen Hicks UK Cluster Security
JRA1 (Middleware) Overview
Leanne Guy EGEE JRA1 Test Team Manager
IEEE SA IEEE LTSC.
Action U-E-5 Technical Coordination – User Technical Support
WSDL Using <import>
Bandwidth Allocation and Reservation Anand Patil, DANTE
API Documentation Guidelines
Project or Team name: Vision: Mission Statement:
Wsdl.
The Re3gistry software and the INSPIRE Registry
Training for developers of X-Road interfaces
Class Commenting Doxygen for Classes.
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Moving from Studio to Atelier
ESS.VIP VALIDATION An ESS.VIP project for mutual benefits
Eclipse Plug-in Development
JRA2 Quality Assurance Geneviève Romier CNRS-UREC
TargetDB and PEPCDB •
Java Code Coverage Tools - EclEmma and JaCoCo
PATENTSCOPE Users Forum IT tools and illustrating materials in the IPC
Use Cases Simple Machine Translation (using Rainbow)
European Statistical System Metadata Handler ESS MH (Super) Providers
Presentation transcript:

NA4 Test Team Status Test meeting, 07/09/04 www.eu-egee.org EGEE is a project funded by the European Union under contract IST-2003-508833

Content Current status Next steps Open questions

Current status Here are our last actions : Test Plan document available ( need to be updated to include these meeting results). Some test cases were writing using the Test Case template define in the test plan. Field on the Test Case : ID Version Short test description Platform Target Tests dependency Requirements reference identifier(s) Use Cases reference identifier(s)

Current status Test Initial conditions Technical test description Possible test failure(s) encountered Test results expected Test rate expected Starting Implementation date Availability date Test usage expected ( frequency) Test Type Comments

Next steps Identify/define/choose the tests framework Same as JRA1 to have a global and coherent test suite Language / error code / config files / …. Output format (XML, human readable : html ?) Go back to the applications to validate the test cases To find the 3 or 4 master test cases to implement first To verify that the use cases were correctly translated into test cases Implement these “master” test cases soon The NA4 cannot deploy his own testbed to develop and perform his tests  Use the JRA1 testbed The tests will not be dependant of the testbed and could be perform in every testbed

Open question A same test need to be perform using the different APIs available A definition of the API will be welcome to generate automatically the test API interface (WSDL definitions ?) What is the domain and the objectives of the SA1 tests ? What is the status of the SA1 testbeds ?