F. Ronchetti, INFN-LNF, September

Slides:



Advertisements
Similar presentations
Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Advertisements

Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS Module building at Glasgow
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 Stave.
ATLAS IBL Tool for gluing flex on omega C.Bault/FX Nuiry - IBL Stave Meeting - UniGe August 31st Process description This tool has been designed.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
Walls crates cables gas chambers electronics CERN adb.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
IB stave assembly A. Di Mauro, C. Gargiulo, J. Van Beelen ITS-MFT mini-week
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
1 ‘Ohana Delay Line Installation at the summit Friday, October 13th 06 Pierre Fedou, LESIA.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
Hybrid Integrated Circuit
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
LAV construction status Matthew Moulson (Frascati) NA62 Photon-Veto Working Group Meeting CERN, 27 May 2009.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Dummy and Pad Chips Needed for various activities (interconnection tests, mass tests, assembly,…) Production of masks, processing, thinning and dicing.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
WP6 meeting 30/07/2013. Status of flex prototypes production New laser soldering tests Discussion on mass production schedule.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
BNL Role In ITK 1.Current R&D Roles 2.Proposed Production Role 3.Activities now until TDR (early 2017) 4.Resources and Infrastructure 5.Personnel 1 D.
EMCal Status ALICE Technical Board November 20, 2008 News Schedule.
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
MFT WG5: ladder disk and global assembly Stéphane BOUVIER & Sébastian HERLANT MFT WG7: Mechanics and Thermal studies Jean-Michel BUHOUR & Emili SCHIBLER.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
WP7&8 Progress Report ITS Plenary meeting, 10 June 2014 LG, PK, VM, JR.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
ATLAS pixel module assembly flow
Federico Ronchetti, LNF weekly meeting
Service channels between Tracker and PP1
Ladder Assembly All tools and jigs produced Glue dispensing works
Mauro Savrie' INFN Ferrara
Gluing jigs for Demonstrator
Mini-drawers, FE-ASIC , Integrator
Open Issues Modification of Cactus Arm bending tool required
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
EHN1 Neutrino Installation Plans
Costruzione dello stave 0 e preparazione per produzione stave OB
HIC testing software
Module/Ladder Assembly
CMS Perugia Modules Production Review
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Federico Ronchetti - INFN and CERN
Presentation transcript:

F. Ronchetti, INFN-LNF, September 20 2017 Infrastructure Main building compressor 27 kW: ongoing Backup compressed air line for the CMM: installation ongoing Extra pump for redundancy and improved tooling vacuum: pump arrived, installation this week, checked yesterday HS and Stave cooling circuit: orders ongoing, checked today … Electrical, vacuum and networks services for HIC cutting table: done Tooling HS soldering table: done Stave/power bus soldering table: arriving from Torino Legs for soldering table: being ordered (monopixel) FPC-FPC bridge holders and FPC metallized bridges : arriving from Torino HB qualification: ongoing, some discrepancy found Tower1: qualification and shimming ongoing Tower2: news screws needed for smoother electric contact HIC landing Power Boards: 2 available HIC, HS, Stave readout adapters: arrived Stave assembly jig rails and carriages: order placed (finally!) Functional HIC for readout tests: available HIC mosaic board: back from Bari HMP 4040 and 2030 power supplies: fast order placed Special crates for Stave and HIC/HS: sent from CERN Eccobond glue: arrived at CERN (Marco will bring it to LNF) Next: Ongoing this week: production of 1 HS with FPC-padchips dummies: alignment, gluing, soldering. Next week SF alignment (without glue). Start functional HIC readout setup and test. mechanical stave realistic FPC dummies being sent: 5 from Strasbourg. Aim to be ready to assemble-test Stave-0 at the beginning of October Production shifts from mid October. F. Ronchetti, INFN-LNF, September 20 2017

HS Assembly with FPC-padchips Dummies

HS Assembly with FPC-padchips Dummies