HPL DG d=1.4mm/e=1.4-1.6mm.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

Micro MEsh GASeous Detectors (MicroMegas)
Status Update on Mechanical Prototype in Rome November 6,
1 Apr. 28, 2007 Test of the Pulse Height and Time Jitter for the IHEP Full-Size RPC’s with 8-m-Long Readout Strip Planes C. Lu, K. McDonald and W. Sands.
GRIPS Mask Design Rationale (1) Grid Pitch Parameters Minimum pitch, P min = 1.0 mm (set by detector resolution) Want a finite number, N v, of discrete.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
1 MUON UPGRADE: ME0 GMM All engineering drawings from Sasha Surkhov PRELIMINARY !!
PCB layout issues PCB alignment and spacing MMM meeting, 22/01/2014G. Sekhniaidze/ J. Wotschack1.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
1 Muon Veto System and Expected Backgrounds at Dayabay Hongshan (Kevin) Zhang, BNL DayaBay Collaboration DNP08, Oakland.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
W.Van Doninck February 2010 The CMS muon upscope Restore the TDR version of CMS  ME4 CSC’s and RE4 RPC’s on Yoke YE3  When ? During first long shutdown.
Chamber mechanics Chamber mechanics Production in China Peking University Group – 20 Aug
L. Bosisio - 2nd SuperB Collaboration Meeting - Frascati SuperB SVT Update on sensor and fanout design in Trieste Irina Rashevskaya, Lorenzo.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
The Phase-1 Extension of the CMS Endcap RPC System Michael Tytgat on behalf of the CMS Collaboration Outline :  Introduction  RPC Upgrade  Simulation.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
Straw man layout for ATLAS ID for SLHC
GEM Integrated PCB readout and cooling
(University of Sofia “St. Kliment Ohridski”)
Mock-up and integration status
Integration and Services RE3/1 and RE4/1
Integration and Services RE3/1 and RE4/1
Gas Detectors (GEM) The 6th Egyptian school for high energy physics
Tin Whisker Risk Model Spreadsheet
YE2 – YE3 distance Manual measurements
Sensitivity of Hybrid Resistive Plate Chambers to Low-Energy Neutrons
RPC built a new plastic (peek doped with CB)
A. Zhang, S. Colafranceschi, M. Hohlmann
CMS muon detectors and muon system performance
SVT Module design F.Bosi
Vacuum chamber for the CMS forward region
Chamber Design and Integration RE3/1 and RE4/1
PHENIX RPC R&D EFFORT Beau Meredith
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
First of all we will remind some numbers:
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
SIT AND FTD DESIGN FOR ILD
Coordinate system for the GIF as defined for CMS RPCs
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
RPC SYSTEM LAYOUT and DIMENSIONS
A. Zhang, S. Colafranceschi, M. Hohlmann
ISO view of pipe w/ individual EC detector installed
Covering a Large Area ILC-TPC endplate
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
RE3/1 & RE4/1 Parameter Space Services
Option 1: Reduced FF Quad Apertures
Presentation transcript:

HPL DG d=1.4mm/e=1.4-1.6mm

Overall Dimensions of RE3/1 with inner Mount to Neutron shielding Ian Crotty 30-31/05/2017 Overall Dimensions of RE3/1 with inner Mount to Neutron shielding Lost space if the direct mount to the N. shield is retained Development with IO will be required to increase the coverage back to the cylindrical N. shield.

Design RE3/1 RPC chambers Double gap RPC chamber PP under work * Clearance between ME3/1 and RE3/1 will be (80 ± 1 ) – (5 + 25 + 5 +25) = 20 ± 1 mm, where thickness RPC chamber is 25 mm; thicknesses honeycomb panel is 5 mm. Ian Crotty 30-31/05/2017 Cross section of  double gap RPC chamber From Kodel BT design we know that the chamber will fit in this mechanics

RE4-1 chambers RE4-1 Ian Crotty 10/02/2015 RE42-3

RE4-1 chamber Ian Crotty 10/02/2015 20° chamber Long 1030 mm Large 1179 & 816 mm 18 top chambers 18 bottom chambers Service Carter shorter for space issue 70 mm thickness available

Initial TDR (2007) |η| < 2.1 Geometry ◮ 2 rolls (η-partitions) :: A,B ◮ Δη ≈ 0.12 For the New TDR (2017) |η| < 2.4 Geometry ◮ 5 rolls (η-partitions) :: A-E ◮ Δη ≈ 0.12 (|η| < 2.1) ◮ Δη ≈ 0.10 (|η| < 2.4) Is it possible to keep the 5 partitions from the readout point of view ; Strip PCBs design, FEB & cabling Strip pitch: 96 strips / 20 degrees : min max Re3.1 0.52 1.24 Re4.1 0.6 1.24

a b h RE3/1 layout RE4/1 layout REG1 REG2 REG4 REG5 REG3 REH1 REH2 REH4 REH5 REH3 RE3/1 & RE4/1 dimensions in CMSSW REG1 h = 32.1 cm a = 101.36 cm b = 112.68 cm REG2 h = 32.1 cm a = 89.68 cm b = 101.0 cm REG3 h = 32.1 cm a = 78. cm b = 88.92 cm REG4 h = 32.1 cm a = 66.34 cm b = 77.66 cm REG5 h = 32.1 cm a = 54.66 cm b = 65.98 cm REH1 h = 28.1 cm a = 104.1 cm b = 114.0 cm REH2 h = 28.1 cm a = 93.82 cm b = 103.74 cm REH3 h = 28.1 cm a = 83.56 cm b = 93.48 cm REH4 h = 28.1 cm a = 73.3 cm b = 83.22 cm REH5 h = 28.1 cm a = 63.04 cm b = 72.96 cm

RE3/1 Strips Angle [mrad] Width (min) [cm] Width (max) 32 10.9 1.708 3.521 64 5.5 0.854 1.761 128 2.7 0.427 0.880 192 1.8 0.285 0.587 RE3/1

RE4/1 Strips Angle [mrad] Width (min) [cm] Width (max) 32 10.9 1.658 3.563 64 5.5 0.829 1.781 128 2.7 0.414 0.891 192 1.8 0.276 0.594 RE4/1

Assembly of RE1/1 chambers KODEL, Korea university Built 4 chambers in 2008-2009 10 degrees/4 aprtitions Eta :1.82.1 25th. Feb. 2009 RPC detector and operation meeting