In depth analysis of TYNDP issues

Slides:



Advertisements
Similar presentations
GRIP South Region Gas Regional Investment Plans Investment WS – 29 th Sep 2011.
Advertisements

GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 15 November 2013.
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Gas Regional Investment Plan North West Stakeholder Consultation Presentation 4 th April
EU Developments Transmission Workgroup 3rd November 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
Early implementation of CAM : PRISMA initiative GRI South – SG Meeting Madrid, 30 April 2013.
Update Transparency project RCC The Hague, 12 May 2011 Konrad Keyserlingk - Ofgem -
 TYNDP assessmentFindings for NW region  ResilienceDenmark/Sweden, Luxembourg  Supply dependencySouth of France  Network adaptabilityno issues  Supply.
Gas Regional Initiative Region North-West Gas Regional Investment Plan Project Marie-Claire Aoun, Carole Mathieu CRE RCC Meeting The Hague – 4 April 2013.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Update The Manual for near term investment procedures for (cross-
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
Bonn Workshops 8 and 9 Feb Balancing workstream.
TSO Transparency project Gas Regional Initiative North West Nicola Meheran, Ofgem Regional Co-ordination Committee 15 September 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
29th November 2016 Teleconference
South Region Second Edition
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Update on CAM roadmap/ joint European Capacity Platform
Gas Regional Investment Plans
Ben Voorhorst, President, ENTSO-E
43th IG Meeting South Gas Regional Initiative
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Work plan of GRI NW for 2011 Three out of four projects are started
Gas Regional Initiative
37th IG Meeting South Gas Regional Initiative
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
GTE+ Winter Outlook 2008/2009 Final Version,
Gas Regional Investment Plan North West
In depth analysis of TYNDP issues
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
RO-HU-AT - a pilot project for incremental capacity
Pekka Vile, Senior analyst, Fortum Power and Heat Oy
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Gas Regional Investment Plan North West
RO-HU-AT - a pilot project for incremental capacity
Transparency Project GRI NW Region.
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Update on CAM roadmap/ joint European Capacity Platform
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
43th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan project
40th IG meeting 29th November 2016
37th IG Meeting South Gas Regional Initiative
RO-HU-AT - a pilot project for incremental capacity
Purpose Transparency is a critical element in ensuring an effective functioning internal European Gas market Gas Regulation No 715/2009, effective from.
In depth analysis of TYNDP issues
29th November 2016 Teleconference
26th February 2015 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
Problems identified by NRAs that may lead to new infrastructure needs
Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11th Stakeholder Group meeting GRI NW TITRE.
Work plan of GRI NW for 2011 Three out of four projects are started
July update JANUARY 2019.
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

In depth analysis of TYNDP issues TYNDP assessment Findings for NW region Resilience Denmark/Sweden, Luxembourg Supply dependency South of France Network adaptability no issues Supply source diversification Denmark/Sweden Projects resolving aforementioned issues For Denmark/Sweden: solved by Project Ellund, see section 4.3.1 and 4.3.2 For Luxembourg: work in progress, see section 4.3.3 For South of France: work in progress, see section 4.3.4

Resilience

Supply Source Dependency

Supply Source Diversification

Chapter ‘In Depth Review of TYNDP Identified NW Issues’: Example Resilience Assessment Potential investment gaps Germany, Denmark (and Sweden) TYNDP Project Ellund Capacity extension from Germany to Denmark would solve this issue Projects were identified through an Open Season in 2009 FID-project Step 1 increase capacity from Oct. 2014 at a level of 310,000 m³/h Non-FID project Step 2 increase capacity in 2016 at a level of 500,000 m³/h Update GRIP 2013 Step 2 is now also FID No investment gap

Background to NWE Projects Procedures followed to define investment projects Past and present projects (FID) Possible future projects (non-FID) Maps Matrix Explanation how the matrix works in conjunction with the appendix

Matrix – how it works Step 1: look up the IP number on capacity map Step 2: goto matrix and find IP number (ascending order) Step 3: find TYNDP code(s) of project(s) Step 4: with TYNDP code and country goto appendix (countries in alphabetical order, within country in alphabetical order of TYNDP code)

Implementation of draft RCC feedback September 4th S&D Demand uncertainty Energy efficiency measures taken in member states are part of the demand figures of the NW GRIP report But major uncertainty in heating market is outside temperatures. Elasticity for domestic heating market on price is low.

Matrix – how it works Step 1: look up the IP number on capacity map Step 2: goto matrix and find IP number (ascending order) Step 3: find TYNDP code(s) of project(s) Step 4: with TYNDP code and country goto appendix (countries in alphabetical order, within country in alphabetical order of TYNDP code)

Conclusions TSOs are aware of TYNDP identified issues Germany/Denmark/Sweden solved, RFO 2016 Vulnerable position of Sweden improved but not solved. Solutions identified but not decided Luxembourg congestion identified but not solved Price spread between PEG Nord and PEG South identified, solutions being analysed Enduring importance of gas, but increasing import dependency Depleting L-gas sources in Germany and the Netherlands trigger L-gas market conversion Role of gas in power generation and increasing contribution of RES adds to the challenges in flexible gas supply and transmission Further challenges to network development due to decreasing long term transmission capacity commitments

NW GRIP 2013 Timeline - future Nov 2013 26 Nov 28 Nov 1st Jan 2014 2014 2015 Publish report, start consultation phase GRIP workshop ENTSOG GRI NW presentation End consultation phase Review of feedback ENTSOG discussions future GRIPs New NW GRIP 2015

Questions?