Gas pipeline interconnection possibilities

Slides:



Advertisements
Similar presentations
TRANSPORT INFRASTRUCTURE
Advertisements

The Borderless City European Capital of Culture Pécs2010.
Slavko Mezek, Regional Development Centre Koper Project is partly founded by European Union, program Interrreg IIIB CADSES 4nd PlanCoast Conference Climate.
CROATIAN MOBILE LIBRARIES by Spomenka Petrović ZAGREB CITY LIBRARIES.
EBRD – Annual meeting and Business Forum Istanbul 2013 Nabucco Gas Pipeline International Reinhard Mitschek Chief Executive Officer 10 May 2013.
Investment projects in energy sector – a perspective of HEP Group Ivona Štritof, HEP d.d. Brussels, hotel Thon EU, 21st Jan 2015.
Roma minority in Croatia today Josip Nakić Alfirević, prof. Open University Koprivnica Tallinn, X 2009.
SEE Port Development A Variation on the Story of the Rabbit and the Turtle Erich Cossutta, President Confindustria Serbia.
DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO
1 Infrastructure in Bosnia and Herzegovina dr. Jasmin Bučo
Ministry of Mining and Energy Republic of Serbia Impact of Energy on stability and Economic Development in the Region Serbian Oil and.
PLINACRO CROATIAN GAS TRANSMISSION SYSTEM OPERATOR Mladen Čavić, B. Sc. Director of Transmission Division.
Education in Croatian prisons. General situation: The total accommodation capacity of prisons and imprisonment in Croatia amounts to less than places.
1 SIMONE as a key support for operating transmission system of Plinacro Authors: Josip Jovanovac, Plinacro d.o.o. Martin Styblo, SIMONE Research Group.
The Interconnector Greece-Italy (IGI) Project:
Which is the capital of Croatia? Split Zagreb Makarska Zadar Zagreb.
Example of SIMONE Network Manager Integration Plinacro project description.
CROATIA IN BRIEF The presentation for our European friends from  Denmark  France  Lithuania  Scotland  Slovakia  Romania and all the others who might.
Msc Miomir Stojnović Križevci College of Agriculture Croatia Heppenheim, Germany, 22 – 28 April 2012.
Update on the NETS Concept A new, value creating, cross-border business Initiative 4th IG Meeting Vienna 8th April 2008.
Regional Innovation Systems: the experience of AREA Science Park Trieste ___________________________________________________________________________ Fabrizia.
High-pressure gas pipelines projects
M SAN Group – Fujitsu Siemens Computers Partnership Agreement Press Conference in Zagreb Viktor Malinowski, Managing Director SEE regionMay 28th 2008,
1 Belgrade, 12 October 2007 Improvement of system for monitoring and control of transmission system, capacity calculation, and creation of technical conditions.
Croatian Power System 1 The Electric Power System - Croatia -
Project preparation in the Municipality of Koper Ivana Štrkalj International projects’ manager Pula,
1 Investment costs in the Virtual Test GRI NW Investment I1- Virtual Test/Business Simulation Bas Barten Gas Transport Services.
Vision, work, sacrifice Peta regionalana konferencija zdravstveni,wellness i spa turizam Beograd,
GOOD GOVERNANCE ON THE REGIONAL LEVEL IN THE CONTEXT OF CROSS-BORDER AND TRANSNATIONAL PROJECT COOPERATION - THE CROATIAN EXPERIENCE - Ruse / Bulgaria,
Euraxess – Researchers in motion – key initiative of European Commission for enhancing careers of researchers. Established in EURAXESS (until
Republic of Croatia and EGTC. Content – Croatia and EU FUNDS 2013/2014. – – Croatia and EU FUNDS 2013/2014. – Croatia and European Groupings.
1 - prepared by the Energy Community Secretariat - RECENT DEVELOPMENTS IN THE ENERGY COMMUNITY GAS STATUS as of October 2008 GIE – ANNUAL CONFERENCE 23rd.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
CROATIA POPULATION By: Morena Kurtović, Iva Plazibat, Nina Rađa, Karmen Gazibara i Matea Lauš.
Republic of Croatia Ministry of Environmental Protection, Physical Planning and Construction Experience in Implementation of IPA Projects in Croatia Brussels,
Proposed Pipelines & Infrastructure Proposed Pipelines & Infrastructure.
Europe – Adriatic SEA - WAY Pilot Projects presentation Region of Istria Trieste, 3rd December 2015.
4 th Coordination Meeting WP4 – Assessment of the Adriatic port system and its integration with hinterland 4 th of March, 2015 Shkodra, Albania.
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
The countries highlighted in red are the ones you have to label on your map. Note that the borders for Montenegro and Kosovo are not drawn on your map.
RIVERS IN CROATIA LONGEST RIVERS NAME LENGTH (TOTAL) LENGTH (IN CROATIA) Danube 2857 km188 km Sava 945 km562 km Drava 707 km505 km Mur 438 km53 km Kupa.
Prof. Yannis Maniatis Minister for Environment, Energy and Climate Change Pre-Launch Event for “Greece Offshore Licensing Round 2014” London, July 1st,
he transport development progress in Slovenia the EASYCONNECTING hint
Interconnection between the ROMANIAN and the BULGARIAN
Dr. Stelios Bikos, Head of Commercial Division
Opening the Eurasia Gas Corridor
TRANSMISSION GAS NETWORK IN SLOVENIA
Gas Supply to the EU – the Role of the Slovak Republic
GRI-S : Infrastructures The Union list of projects of common interest
Feasibility study on infrastructural interventions in Port of Split
Vojko Obersnel, M.Sc. President of the Association of Croatian Cities
Transport & Logistics Conference 2016
Interconnectivity projects between the EU and Ukraine
2nd JANAF’s Conference Challenges of crude oil diversification,
EUROPE -ADRIATIC SEA-WAY
4th DRS Stakeholder seminar of DRS PA2
TRANSIT OF OIL AND GAS ACROSS TURKEY
JANAF Workshop Flexibility of JANAF transportation system capacities
ENERGY SECTOR IN MONTENEGRO
SAVA COMMISSION Navigation in the Sava River Basin -
RO-HU-AT - a pilot project for incremental capacity
»Invest in Montenegro. Invest in the Region «
RO-HU-AT - a pilot project for incremental capacity
Government of Montenegro Ministry of Transport and Maritime Affairs
DIVERSIFICATION OF TRANSPORT ROUTES AS
Geometry in national ornaments Commenius
Government of Montenegro Ministry of Transport and Maritime Affairs
Energy Stats Analysis 2014 Corporate Energy Desk
International Conference
Presentation transcript:

Gas pipeline interconnection possibilities Energy in SEE – A must for development Portorož, 22 – 23 June 2010 Goran Frančić Plinacro, Director of Development Division

I Development-investment cycle 2002 - 2006 ROGATEC 100.000 210.000 SV. IVAN ŽABNO MOLVE DRAVASZERDAHELY ZABOK BENKOVAC ZAGREB BELI MANASTIR BJELOVAR LUČKO D. MIHOLJAC I Development-investment cycle 2002 - 2006 480 km of gas pipelines 17 MRS DC - new SCADA, CS system 2,085 km of high pressure gas pipelines KARLOVAC 30.000 BELIŠĆE UMAG OMANOVAC OSIJEK KUKULJANOVO PSP OKOLI POŽEGA BOSILJEVO DOBROVAC SLOBODNICA JOSIPDOL S. BROD 240.000 OMIŠALJ NOVA KAPELA B. BROD VODNJAN PULA 280.000 GOSPIĆ II Development-investment 2007 - 2011 920 km of gas pipelines 22 MRS 3,081 km of high pressure gas pipelines ZADAR KNIN SPLIT PLOČE

Development projects

Interconnection possibilities

Croatia - Hungary Interconnection SLOBODNICA-DONJI MIHOLJAC-DRAVASZERDAHELY - VAROSFELD - Diameter: DN800 - Operating pressure: 75 bar - Total lenght: 300 km - two-way gas flow - min. border preassure 50 bar - total capacity 6,5 bcm / y - in operation 2011 - JDA signed March 2009 - joint technical group formed

Croatia - Hungary Interconnection SLOBODNICA-DONJI MIHOLJAC DN800/75 bar - Location permit ✔ - Building permit ✔ - Material ✔ - Execution of work – in progress - Planned completion – end 2010 DONJI MIHOLJAC – DRAVASZERDAHELY DN800/75 bar - Location permit ✔ - Building permit ✔ - Material ✔ - Execution of work – in progress - Planned completion – end 2010

Croatia - BiH Interconnection SLAVONSKI BROD – BOSANSKI BROD (BiH) - Diameter: DN 700 - Operating pressure: 75 bar - Capacity: 1,0 – 1,5 bcm/y - Length of Croatian section: 5.1 km - Investment: 8 million € ŽUPANJA - ORAŠJE (BiH) - Diameter: DN 500 - Operating pressure: 50 bar - Capacity: 1,0 bcm/y - Length of Croatian section: 4 km

Croatia - BiH Interconnection LIČKE JESENICE – BIHAĆ(BiH) - Diameter: DN 500 - Operating pressure: 75 bar - Capacity: 1,0 – 1,5 bcm/y - Length of Croatian section: 30 km - Investment: 15 million €

Croatia - Serbia Interconnection SOTIN – BAČKO NOVO SELO (SRB) - Diameter: DN 800 - Operating pressure: 75 bar - Capacity: 5,0 bcm/y - Length of Croatian section: 5km

Croatia - Slovenia Interconnection ROGATEC (Slo) – ZABOK - existing - Diameter: DN 500 - Operating pressure: 50 bar - Capacity: 1.5 – 2.5 bcm / y - Length of Croatian section: 34 km - Entry capacity: 210.000 m3/h - Usage of capacity: 60 – 80 % ZABOK ROGATEC (Slo) – ZABOK - Diameter: DN 700 - Operating pressure: 75 bar - Capacity: 3.5 - 5 bcm / y - Length of Croatian section: 34 km

Croatia - Slovenia Interconnection OMIŠALJ - ZLOBIN – RUPA – KALCE (Slo) - Diameter: DN 1000 - Operating pressure: 100 bar - Capacity: 15 bcm / y - Length of Croatian section: variant A - 53 km / variant B - 72 km ZLOBIN UMAG – KOPER (Slo) - Diameter: DN 300 - Operating pressure: 50 bar - Capacity: 0,6 – 0,8 bcm / y - Length of Croatian section: 34 km

Croatia - Italy Interconnection INTERCONNECTION BETWEEN CROATIA AND ITALY FEASIBLE THROUGH EXISTING PRODUCTION GAS PIPELINE SYSTEM IN THE NORTH ADRIATIC - Entry capacity of Pula terminal: - 280.000 m3/h - Usage of capacity: 45 – 50 % ZLOBIN OMIŠALJ – CASALBORSETTI (Ita) - Diameter: DN 1000 - Operating pressure: 100/150 bar (to be defined) - Capacity: 15 bcm / y - Length of Croatian section: 150 km

Ionian Adriatic Pipeline Project TAG Tarvisio SOL Varosfold Gorizia Zagreb D. Miholjac Pula 825 km Bosiljevo 2.5 BCM Casalborsetti 1.0 BCM 420 km Ploce 0.5 BCM Montenegro 237 km IAP 1.0 BCM 75 km Tirana 0 km TAP Fieri existing planned 13

Ionian Adriatic Pipeline Project

Lika and Dalmatia options IAP Activities Lika and Dalmatia options DN 500 Troughput scenario 2.5 BCM/a DN 800 Troughput scenario 7.5 BCM/a

BiH + MN Interconnection IAP Activities BiH + MN Interconnection PLOČE – MOSTAR (BiH) - Diameter: to be defined - Operating pressure: 75 bar - Capacity: to be defined - Length of Croatian section: PLOČE - DUBROVNIK - Diameter: to be defined - Operating pressure: 75 bar - Capacity: to be defined - Length of Croatian section: DUBROVNIK - PREVLAKA - Diameter: to be defined - Operating pressure: 75 bar - Capacity: 1,0 –1,5 bcm / y - Length of Croatian section: 42,7km PREVLAKA - DOBREČ (CG) - Diameter: to be defined - Operating pressure: 75 bar - Capacity: to be defined - Length of Croatian section:3,5km

Interconnection possibilities

Thanks! Energy in SEE – A must for development Portorož, 22 – 23 June 2010 Goran Frančić Plinacro, Director of Development Division