Udaipur Smart City SUMMARY OF PROGRESS

Slides:



Advertisements
Similar presentations
Johan de Clerk 14 June 2012 Smart Cities from a Civil Security Perspective.
Advertisements

Ashwin Mahesh Mobility in the city Rethinking problem-solving in urban transport.
Energy Smart Room GROUP 9 PRESENTERS DEMO DATE SPECIAL THANKS TO ADVISOR PRESENTERS Thursday April 19, 2007 Department of Electrical and Systems Engineering.
Master Plan Update Chapter 213 of the Local Government Code provides that Cities may engage in Comprehensive Planning which may:  include but not be limited.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Land Use Study for the Community of Winchester July 9, 2012.
Measure 60 Cycle Transport Improvements Katerina Oktabcova Usti nad Labem Municipality.
Confidential | RBEI / NBD | 27/08/2015 | © Robert Bosch Engineering and Business Solutions Private Limited All rights reserved, also regarding any.
Potential use case for discussion – Street Light Automation Group Name: WG1/2 Source: Cisco Meeting Date: Joint-REQ-ARC-WGs-call Agenda Item: Use cases.
Government of India Ministry of Urban Development Smart Cities Mission Smart Cities Challenge – Stage 2 Smart Cities challenge – Ajmer city Final Proposal.
GTPE 04/06/15 L. Scibile 04/06/ EDMS:
Targeting to achieve competitiveness and attractiveness of its territory, new network opportunities, sustainable urban and community development efforts,
EXPO – 2017 ASTANA Malika Bekturova population is ASTANA INFO PEOPLE total area is HECTARS average temperature (in summer) - 25C (77F) ASTANA.
Smart City Proposal Gwalior Round – I Proposal. “Comprehensively transform Gwalior through promotion of heritage and cultural assets, to create new economic.
Smart City A Public-Private Partnership. Uses communication networks, wireless sensor technology and intelligent data management to make decisions in.
Morelli Park Reconstruction and Expansion Project Public Hearing and Award of Construction Contract Stockton City Council and Stockton Redevelopment Agency.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 14 – Transport Policy Brussels
Complete Streets Training Module 4b – Designing for All Users.
Intelligent Transport System (ITS) Dr. Ekroop Caur, IAS.
Integration in Urban Planning Processes Évora (Portugal)
Implementation of Smart Cities mission DAVANAGERE SMART CITY LIMITED
Review of Implementation of Smart Cities Mission
Review of Implementation of Smart Cities Mission
REVIEW : Implementation of Smart Cities Mission
Review Implementation of Smart Cities Mission
Review: Implementation of Smart Cities Mission Maharashtra
ELCITA UPDATE April 2017.
ELCITA UPDATE March 2017.
Review of Implementation of Smart Cities Mission
ELCITA UPDATE JULY 2017.
Smart Kalyan Dombivli Development Corporation Limited (SKDCL)
Smart and Safe City.
Review of Implementation of Smart City Mission
Review: Implementation of Smart Cities Mission Maharashtra
The fibre journey for fibre-to-the-cabinet (FTTC) solutions
REVIEW : Implementation of Smart Cities Mission
Building world class livable and smarter cities
Review: Implementation of Smart Cities Mission Haryana
Review: Implementation of Smart Cities Mission
Review: Implementation of Smart Cities Mission Maharashtra
Smart Kalyan-Dombivli Development Corporation Limited (SKDCL)
Review of Implementation of Smart Cities Mission
ELCITA UPDATE AUGUST 2017.
Security systems for cities
Review of Implementation of Smart Cities Mission
Project Management Team Meeting #3
Review of Implementation of Smart Cities Mission
Review: Implementation of Smart Cities Mission Maharashtra
Review of Implementation of Smart City Mission
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Review: Implementation of Smart Cities Mission Maharashtra
SIX Pillars of Integrated Public Transport
WTOC Pic of area WTOC (Signals) 5 SCATS Operators Monitoring 6am-8pm
Safety and Security System in Tallinn
Tektronix Technology Systems LLC We are technology company We provide customized IT solution, majorly we deal into telematics and installation of CCTV,
Site study and Analysis
Future Village development key requirements
Review of Implementation of Smart Cities Mission
Review of Implementation of Smart Cities Mission
“Smart City: Future Perspectives”
Status Report on Rochester’s DMC Transportation Plan
Overview of the work of the Advisory Board and Technical Advisory Group Cristina Bueti 22 July 2016.
DIGITAL DIVIDEND : TECH FOR GOOD
& David Gregory, Connected Space Ltd
Moving Towards a Smart City Traffic Services Initiatives
Review of Implementation of Smart Cities Mission
Redevelopment of Jama Masjid Precinct
Sub 1 GHz Use Case Discussion
CR-GR-HSE-419 Safety of excavation works
Steria SmartCity 09/11/2019.
Presentation transcript:

Udaipur Smart City SUMMARY OF PROGRESS Development of all main roads under ABD area as smart roads An Integrated Tender Document is being prepared to cater to the following components – Water Supply, Sewerage, Electrical, Utility Ducting and Smart Roads. It will cater to all the ducting needs as also the Smart Components related to the development of Roads – Wi-Fi Solutions, Smart Lighting System, Smart City Surveillance, Smart Parking Solutions, Smart Transport Management System, Pedestrianization etc. A detailed overview with respect to the same can be had in the Slides 3-5 However, the space requirements of Tender SURE restricts its application, in entirety, to ROW having width 21 meters or more. In the walled city; lane width / ROW varies from 12 m to 3 m (as per reconnaissance survey done in 3rd week of August 2016) at majority of the places and therefore effecting Tender SURE guidelines, in entirety, feasibility seems difficult in the walled city area. B. Redevelopment of street and junctions for which designs have already been prepared USCL and Nagar Nigam jointly started the junction improvement work with the technical assistance of ICLIE, Smart City Partner of Udaipur for Surajpol Junction. Junction redesigning and planning has been done by ICLIE and the detail modal was discussed with transport, police and local administration and practical demonstration successfully implemented with the help of traffic police. USCL has gone ahead with the implementation of the same. Currently work is underway for the Landscape design finalization for Suraj Pol so that Tender can be floated. Plan is underway for implementation for 2 more junctions – Delhi Gate and Hathi Pol

Udaipur Smart City SUMMARY OF PROGRESS C. Performance based contracts for management of smart water supply systems Contract worth INR 350 Crores has already been prepared. DPR with respect to the detailed Water Supply Network is being prepared by Wapcos and is expected shortly. The same will be incorporated into the integrated tender document about which was mentioned in point no A Integrated control and command centre having all the modules 3 Modules have already been initiated – Surveillance Analytics & Forensics Helpline A working prototype of the Command and Control Center is nearing completion with the following details Air Quality Monitoring System Camera feed from Tourist places Mapping of Community Toilets in the map of Udaipur Community Hall Online Booking Status City Bus Service Application Solid Waste Vehicle GPS Tracking System LED Lighting Application 10 modules are under consideration . Consideration is on for integrating the proposed modules with the existing ones

Udaipur Smart City SMART ROAD COMPONENTS START HERITAGE 1 BIO TOILETS 2 HERITAGE CONSERVATION WORK HAS BEEN STARTED ALONG 5 ROADS Bada Bazaar Moti Chauhatta to Ghantaghar Bazaar Jagdish Chowk to Ghantaghar Bazaar Jagdish Chowk to City Palace Bazaar Jagdish Chowk to Gangaur Ghat Bazaar BIO TOILETS BIO TOILETS CONSTRUCTED ACROSS THE CITY AND HAVE BEEN GEO TAGGED REQUEST SENT FOR THE SAME TO BE MAPPED IN THE SWACH BHARAT TOILET LOCATOR 3 PARKING SENSORS PARKING SENSORS TO BE INSTALLED ACROSS THE 10 DESIGNATED PARKING LOTS 5 UNDERGROUNDING 4 CYCLE & E-BIKES UNDERGROUNDING DUCTING WORK TO BE CARRIED OUT IN THE WALLED CITY AREA FOR ELECTRICITY, WATER, SEWERAGE, OPTICAL FIBRE AND GAS DISTRIBUTION SYSTEM CYCLE & E-BIKE STANDS TO BE CONSTRUCTED AT DOODH TALAI, GULAB BAGH, BAGORE-KI-HAVELI & PWD PARKING NEXT

Udaipur Smart City SMART ROAD COMPONENTS (CONTD…) MID WAY SURVEILLANCE 6 SURVEILLANCE 7 SURVEILLANCE SYSTEM TO BE INSTALLED IN 80 + IROAD INTERSECTIONS ACROSS THE WALLED CITY – 250 CAMERAS TO BE INSTALLED LIVE VIDEO FEED OF TOURIST AREAS LIVE VIDEO FEED OF TOURIST AREAS ALREADY IN PLACE IN GANGAUR GHAT & FATEH SAGAR AREAS 8 PEDESTRIANIZATION & E-RICKSHAW E-RICKSHAWS TO TRAVERSE FROM RANGNIWAS TO GHANTAGHAR 10 VMS SCREENS 9 POLLUTION SENSORS/ TEMPERATURE SENSORS VMS SCREENS TO BE IN PLACE IN ALL PARKING LOCATIONS ACROSS THE CITY IN ADDITION TO 10 MAJOR LOCATIONS RAJ VAYU WILL BE INTEGRATED WITH THE INITIATIVE RELATED TO INSTALLATION OF AMBIENT AIR QUALITY MONITORING FACILITY. THE DATA WILL BE PROPAGATED THROUGH THE INSTALLATION OF VMS SCREENS NEXT

Udaipur Smart City SMART ROAD COMPONENTS (CONTD…) MID WAY 11 WI-FI WI-FI HOTSPOTS TO BE SET UP IN 80 LOCATIONS ACROSS THE WALLED CITY COVERING PRIMARILY THE TOURIST SPOTS 12 BUS Q-SHELTER FINISH TO BE SET UP IN 10 LOCATIONS SPANNING THE WALLED CITY