Beam Secondary Shower Acquisition System: Front-End RF Design (2) Student Meeting Jose Luis Sirvent PhD. Student 26/08/2013.
Advertisements

Beam Secondary Shower Acquisition System: Analogue FE installation schedule and Digital FE Status BE-BI-BL Jose Luis Sirvent Blasco
Beam Secondary Shower Acquisition System: ICECAL_V3 Board and QIE10 Mezzanine Test preparations BE-BI-BL Jose Luis Sirvent Blasco 2.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Integrated test environment for a part of the LHCb calorimeter TWEPP 2009 Carlos Abellan Beteta La Salle, URL 22/9/2009TWEPP09 Parallel session B2a - Production,
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
Beam Secondary Shower Acquisition System: QIE10 Front-End, Remote Initialization BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
BWS electronics design status J.Emery & Luca, Pierre-Jean, Emiliano, Jose, Alexander and all past contributors!
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
HIE REX / ISOLDE New Instrumentation electronics - Main functionalities - S.Burger BI-PM
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
Beam Secondary Shower Acquisition System: 2014_11_24_GBT_On_Igloo2 Release BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent Blasco.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
PMT Tests for HF Upgrade Ugur Akgun. HF PMT Proposed Tests On Every PMT: – Rise Time – Negative Pulse Width – Transit Time – Transit Time spread – Single.
Beam Secondary Shower Acquisition System: Igloo2_UMd_Mezzanine and QIE10 preliminary testing PART II BE-BI-BL Jose Luis Sirvent Blasco
Beam Secondary Shower Acquisition System: BWS pCVD Measurements on SPS BA5 BWS51731 BE-BI-BL Jose Luis Sirvent Blasco 2 Jose Luis Sirvent.
Optical position sensor for the BWS Upgrade: Disk Samples measurements at different roughness (Stainless Steel and Aluminium) BE-BI-BL Jose Luis Sirvent.
CDMS II Shielding To Installation To Construction From Design.
KM2A PMT testing platform FENG Cunfeng, LI Chaoju, SUN Yansheng Shandong University THE 2 nd WORKSHOP OF AIR SHOWER DETECTION AT HIGH ALTITUDES IHEP, Beijing,
Beam Secondary Shower Acquisition System: RF design techniques for 40MHz ADC Student Meeting Jose Luis Sirvent PhD. Student 30/09/2013.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Beam Secondary Shower Acquisition System: ICECAL_V3 Mezzanine Board, initial developments BE-BI-BL Jose Luis Sirvent Blasco 2 Jose.
STATUS of BIG PROTOTYPES A. Piskun (for Dubna group) Protvino, 7 June 2011 _________________________________________________ Full Scale Prototype Range.
BWS Design meeting Jose Luis Sirvent PhD. Student XX/03/2014
LHCb Outer Tracker Electronics 40MHz Upgrade
Beam Secondary Shower Acquisition System: Front-End RF Design
LIU Wire Scanner Project
Scintillator testing in Prague (update from Aussois)
ETD PID meeting We had many presentations dedicated to the PM test .
Student Meeting Jose Luis Sirvent PhD. Student 12/08/2013
MICE RF System Power Supplies, Control and Monitoring Status report
Upgrade activities at Clermont-Ferrand
ELENA scrapers ELENA status for BI – electronics and software
Power and control electronics for the new fast wire scanners
Jorge Sánchez-Quesada BE-RF-FB
Upgrade of the scintillator testing station in Prague
LIU Wire Scanner Milestones June 2017
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Analog FE circuitry simulation
Student Meeting Jose Luis Sirvent PhD. Student 27/01/2014
Injectors BLM system: PS Ring installation at EYETS
BI seminar agenda “Project context and Introduction to the collaboration with the HES-SO”, 10 min, Jonathan Emery, CERN “A Generic and Modular Protocol.
Working plan for 2017 Acquisition and Control Electronics
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
Wire Scanner Mechanics
Mini-drawers, FE-ASIC , Integrator
ALICE Trigger Upgrade CTP and LTU PRR
Status of the MOPOS BI TB – 26th June 2014.
LHC wire scanners status
J.L. Sirvent1,2, B. Dehning1, J.Emery1, A. Diéguez2
F.Guber, A.Ivashkin INR, Moscow
Injectors BLM system: PS and PSB Ring installations at EYETS
Beam Wire Scanners (PS prototype and LIU series)
Electronics: Demod + 4Q FE
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Combiner functionalities
Status of muon monitor R&D and construction
Development of hybrid photomultiplier for Hyper-Kamiokande
Testing and deployment
LIU BWS Firmware status
Presentation transcript:

BWS Upgrade: Electro-Mechanical design meetin #14 Acquisition Chain Status Jose Luis Sirvent Blasco BE-BI-BL BWS Upgrade: Electro-mechanical design Meeting #14 19/09/2016 BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

1. Scintillators assembly Set-Up: 1.1 Components availability status # Description Status Delivered BC-408 5 Cylindrical scintillators Ordered 21-Oct-2016 R9880U 2 Standard PSB PMTs Lab. Available Ready E10679 PMT HV Base Lab. Available? (To check) FilterWheel 3 See Next Slides -- Work in Progress Fixed Filters - Kodak ND Filters Lab Available R7600U-M4 MaPMT (Test System) 5-Oct-2016 E678-32B MaPMT Socket E7083 MaPMT HV Base 26-Oct-2016 Scint Waveguide Waveguide Filter Box Filter Box Fixed Filters PMT R9880 MaPMT R7600 HV Base E10679 HV Base E7083 PSB Standard Series PSB Modif Series All ready on beginning of November BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

2. Filter wheel status: 2.1 ND Filters… Courtesy : D.Gudkov Courtesy : J.Emery Old 30mm diam. Filters from: AG Laser Innovation INC https://edh.cern.ch/Document/SupplyChain/DAI/2830744 New Absorptive Neutral Density Filters required: T  0.25/ 0.05 / 0.025/0.005 /0.0025 OD  0.6 / 1.3 / 1.6 / 2.3 / 2.6 BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

2. Filter wheel status: 2.1 ND Filters… Proposed to process order with Thorlabs: Fast delivery and easier ordering process Filter holder & Single filters separately 3 Filter Sets: 2 PSB Tunnel + 1 Lab Combine filters to reach Transitivity required Compatible Filter Wheel to consider? FW1AB 6 Positions (do we require 7?) SM1 Threaded Component Description Price Unit Units Price total SM1L03-P5 SM1 Lens Tube 0.3’’ Thread Depth, SM1RR included, Pack 5 51.98 e 3 155.9e NE03B Unmounted Ø25 mm Absorptive ND Filter, Optical Density: 0.3 28.8 e 6 172.8 e NE06B Unmounted Ø25 mm Absorptive ND Filter, Optical Density: 0.6 NE13B Unmounted Ø25 mm Absorptive ND Filter, Optical Density: 1.3 NE20B Unmounted Ø25 mm Absorptive ND Filter, Optical Density: 2.0 Total order 847 e Proceed? BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

3. Actions check List: To-do Requirements on surface (Space reservation): as in SPS 1 PC + 2 Pico-Scopes 1 VME HV Power supply with remote control 2 x Filter Wheel controllers 3 Units Europa Crate reserved Access to Turn Clock Laboratory PMT’s Test campaign preparation: Aim: Strategies for High dynamic range coverage (MaPMT, HPD, Several PMTs …) Tests: Linearity, Saturation levels, Resolution, Noise… Equipment is ready, required some optical components (Diffusers, filters…) BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

4. Some news: 4.1 Data from last SPS tests Cable coupling noise synchronous with SPS turn clock. Specially on PMT cable BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch) 4. Some news: 4.2 Observations with all systems disconnected (only cable) BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

4. Some news: 4.3 Intervention to check cabling and remove amplifier PMT and Diamonds are now closer 2. No Amplififer anymore BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch) 4. Some news: 4.4 Nicer Expert application for Acquisition system prototype BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)

2. Installation Proposal Schema: Setup-V2 PSB BWS Secondary Acquisition System Test Installation Proposal V2 (Base + Digital) 2016-2017 LED Scint LED Scint Modif PSB_TYPE Cylindrical H 30mm D 30mm Waveguide PSB_TYPE Cylindrical H 30mm D 30mm 2 x SMF (GBT Link) Waveguide GBT_TX Filter Box GBT_RX Fixed filters 100% 25% 5% 1% Filter Box 4 x MMF (Spares) MaPMT PMT 1 x NG18 (Relay Control + Power) R7400U (Obsolete) Digital GEFE & ICECAL_V3 Mezzanine 100% Relay Bank Spare x 2 25% Relay Ctrl_1 5% Relay Ctrl_2 1% FE. Power +12V Amp. Power +12V Amp. Power -12V Relay Ctrl_3 FE-Prototype Relay Ctrl_4 3 x CK50 (Analog Signal) 100 - 25 % 2 x MaPMT Signal 1 - 5% Signal PMT 1 x PMT Amp. Signal 2 x CEH54 (High Voltage) HPD HV (15-20kV) Analog PMT HV (1-2kV) 2 x NE18 (FilterBox) FilterBox PMT FilterBox HPD 3 x CB50 (Diagnostics LED) HPD PD Bias 25-100V PMT LED Signal HPD LED Signal

BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch) R9880U Series (Standard PSB PMT) R7600U-M4 Series (MaPMT for Test System) Effective Detector Area : 50 mm2 Whole PMT assembly volume: Cylindrical d=16mm x h = 36.4mm Effective Detector Area : 4 x 63.6 mm2 Whole PMT assembly volume: Cubic= 30 x 30 x 37 mm BE-BI-BL Jose Luis Sirvent Blasco (jsirvent@cern.ch)