Highlights Chaired by Ian Bird, CERN

Slides:



Advertisements
Similar presentations
IPv6 testing plans 25 Jan Short term – next 6 weeks Add sites to testbed – Glasgow (DPM storage end point) – Fix DESY – Others? Is GridFTP mesh.
Advertisements

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/
SRM 2.2: status of the implementations and GSSD 6 th March 2007 Flavia Donno, Maarten Litmaath INFN and IT/GD, CERN.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPiX, Ann Arbor MI 30 Oct 2013.
The HEPiX IPv6 Working Group David Kelsey EGI TF, Prague 18 Sep 2012.
Maarten Litmaath (CERN), GDB meeting, CERN, 2006/02/08 VOMS deployment Extent of VOMS usage in LCG-2 –Node types gLite 3.0 Issues Conclusions.
“From IPv4 to eternity”: the HEPiX IPv6 working group CHEP2012, New York 21 May 2012.
HEPiX IPv6 Working Group David Kelsey GDB, CERN 11 Jan 2012.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
LCG Introduction John Gordon, STFC GDB June 8 th 2011.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
WLCG Service Report ~~~ WLCG Management Board, 18 th September
WLCG and IPv6 David Kelsey (STFC-RAL) LHCOPN/LHCONE, Rome 28 Apr 2014.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
The HEPiX IPv6 Working Group David Kelsey HEPiX, Prague 26 April 2012.
“From IPv4 to eternity” - the High Energy Physics transition to IPv6 David Kelsey TNC2012, Reykjavik 23 May 2012.
SRM 2.2: experiment requirements, status and deployment plans 6 th March 2007 Flavia Donno, INFN and IT/GD, CERN.
HEPiX IPv6 Working Group David Kelsey david DOT kelsey AT stfc DOT ac DOT uk (STFC-RAL) HEPiX, Vancouver 26 Oct 2011.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
The Worldwide LHC Computing Grid WLCG Milestones for 2007 Focus on Q1 / Q2 Collaboration Workshop, January 2007.
Implementation of GLUE 2.0 support in the EMI Data Area Elisabetta Ronchieri on behalf of JRA1’s GLUE 2.0 Working Group INFN-CNAF 13 April 2011, EGI User.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX CERN October 5, 2012 CERN 1
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
IGTF, WLCG, EGI and SHA-2 (and RFC proxies) David Kelsey (STFC-RAL and WLCG) TAGPMA meeting, Panama City Aug 2012.
Operations Workshop Introduction and Goals Markus Schulz, Ian Bird Bologna 24 th May 2005.
CREAM Status and plans Massimo Sgaravatto – INFN Padova
EMI INFSO-RI EMI 1 (Kebnekaise) Updates C. Aiftimiei (INFN) EMI Release Manager.
Ruth Pordes, March 2010 OSG Update – GDB May 12 th 2010 Operations Services 1 Periodic reliability problems with end to end publishing to WLCG BDII – as.
WLCG IPv6 deployment strategy
Jeremy Coles, STFC-RAL GDB April 4, 2007
OpenSSL and Java 7 vs. 512-bit proxy keys
Status of Task Forces Ian Bird GDB 8 May 2003.
LCG Service Challenge: Planning and Milestones
gLite->EMI2/UMD2 transition
Andrea Manzi, Oliver Keeble
Plans to support IPv6-only CPU on WLCG
1 VO User Team Alarm Total ALICE ATLAS CMS
Grid Deployment Area Status Report
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
Database Readiness Workshop Intro & Goals
Update on Plan for KISTI-GSDC
The CREAM CE: When can the LCG-CE be replaced?
Taming the protocol zoo
CASTOR-SRM Status GridPP NeSC SRM workshop
Support for IPv6-only CPU – an update from the HEPiX IPv6 WG
Update on SHA-2 and RFC proxy support
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
John Gordon, STFC-RAL GDB March 11, 2009
Update from the HEPiX IPv6 WG
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
Deployment of IPv6-only CPU on WLCG - update from the HEPiX IPv6 WG
John Gordon, STFC GDB October 12th 2011
EMI: dal Produttore al Consumatore
WLCG and support for IPv6-only CPU
WLCG Collaboration Workshop: Outlook for 2009 – 2010
UMD 2 Decommissioning Status
Andrea Manzi, Oliver Keeble
MB Maarten Litmaath CERN v1.0
IPv6 update Duncan Rand Imperial College London
Dirk Duellmann ~~~ WLCG Management Board, 27th July 2010
The LHCb Computing Data Challenge DC06
Presentation transcript:

Highlights Chaired by Ian Bird, CERN FtF MB meeting @CERN January 10th 2011 https://indico.cern.ch/conferenceDisplay.py?confId=164577 Chaired by John Gordon, STFC-RAL GDB meeting @CERN January 11h 2011 http://indico.cern.ch/conferenceDisplay.py?confId=155064

Topics WLCG service report Reporting installed capacities Critical services for experiments IPv6 status RFC proxy & SHA-2 support Availability computation for Jan. 2012 based on CREAM only

WLCG Service report Andrea Valassi (CERN) MB meeting 2 Service Incident Reports received: Loss of two LHCb files from tape archives at Gridka (SIR) AFS NAT ping packet flood from IN2P3 (~SIR) Upgrade to AFS 1.6.0 Comments : Non official SIR but thanks to IN2P3 team Nasty bug from the latest AFS version Discourage people to upgrade to 1.6.0 version ====> impact on BDII service at CERN

Availability plots week 05/12/11 MB Meeting SRM overload at SARA and IN2P3-CC Est-ce corrélé avec l’arrêt 6/12, forte activité au redémarrage ? surcharge (IOWait) sur les 2 serveur principaux dCache (srm and chimera) ??

Installed capacities MB meeting Reporting installed capacities - Information is required for the RRB and funding agencies Difficulties to get accurate information published Pb with VO shares, normalization Ian Bird’s proposition forget about automatic reporting REBUS tool usage … upload the installed capacities twice a year by sites http://gstat-wlcg.cern.ch/apps/pledges/resources/ Static information could be detached from the IS CMS would like to be able to query for the information.

WLCG Critical Services Follow-up of T1SCM discussion (Nov. 2011) Experiments asked by MB to produce an ppdated list of critical services to be discussed and reviewed ALICE ATLAS CMS LHCb Experiments’ views IT services : ORACLE, wiki.. Data reconstruction… Ian Bird : The real issue is what is critical for data taking….(cf. WLCG MoU) Go through these lists and review if there is more to be consider then perheaps reconsider somme aspects of MoU Needs for normalization (criticity rank), terminology to be fixed (downtime =/ response time) Specific discussion to be organized in T1SCM

Information Service EMI status and plans Laurence Field (CERN) EMI solution from the comparaison of the gLite, ARC, Unicore GLUE 2.0 support from EMI 1 : IS Components Concept of registry + toplevel cache (waiting for requirement) Information Service for WLCG by Markus Schulz (CERN) WLCG issues : System config. doesn’t match the current use cases Data Quality Data Bloat ( load balancing CEs multiply the data volume ) Recent reflexion and improvements to be rolled out and followed up : Release of gLite-Cluster component, caching BDII, and GLUEValidator

IPV6 status David Kelsey (STFC) Report from HEPix WG (created in april 2011) https://w3.hepix.org/ipv6-bis/ Distributed HEP testbed : CERN, DESY, FZU, GARR, INFN, KIT, USLHCnet Tests started with full mesh of gridftp transfers (PhEDEx tests by CMS), then install FTS … DPM ? Full Asset survey in 2012 Aim to implement dual stack on all WLCG services Important Experiment specific part to be handled Plan several HEP ipv6 days : turn on dual stack for 24 hours during 2013 Collaboration with EGI,EMI…https://wiki.egi.eu/wiki/IPv6 Decisions on plans for 2013 to be made by MB WLCG can not support IPv6-only systems before at least 2014 CERN : IPv6 support foreseen for 2015 T1s plans ? Get the Tier-1s involved at least in the HEPix WG

CREAM Is it working for SGE and can we remove LCG-CE from the availability calculation ? Planned to use CREAM-only availabiliby calculation for january 2012 to keep the calculation consistent throughout 2012 Speak now or forever hold your peace

Mware - EMI 1 status Cristina Aiftimiei (INFN) Update 10 – 24.11.2011 : Major release CREAM/GE module v1.0.0 Update 11 – 15.12.2011 : WMS, v3.3.4 Update 12 – 19.01.2012 : http://bit.ly/EMI1UpdatesReady dCache v1.19.12_13 BLAH v1.16.4 https://savannah.cern.ch/task/index.php?25000 This updates of BLAG fixes a memory leak in the bupdater for PBS/Torque and LSF. It also addresses a problem affecting bupdater and bnotifier start with GE memory leak

SHA-2 and RFC proxies support Maarten Litmath (CERN) IGTF (International Grid Trust Federation) would like Cas to move from SHA-1 to SHA-2 signatures ASAP globus legacy proxies => RFC proxy usage https://twiki.grid.iu.edu/bin/view/Security/HashAlgorithms dCache (and BeStMan) relying on Java using JGlobus 1.x which does not support SHA-2 (RFC proxies already supported) – Migration to JGlobus 2.x (SHA-2, only RFC proxies) Argus, CREAM, WMS, DIRAC do not support RFC proxies. SHA-2 should work (not tested) Preliminary phases and milestones (to be discussed) Deployment of SW supporting RFC proxies Switch to RFC proxies and upgrade dCache and BeStMan Introduce SHA-2 Cas Follow-up : TEG security + France-Grilles

AOB Migration to ORACLE 11 g ??

Incoming events TEG reports during pre-GDB : February 7th, CERN https://indico.cern.ch/conferenceDisplay.py?confId=158775 WLCG workshop co-located with CHEP, May 19-20, NYC http://www.chep2012.org/wlcg-2012.html FtF meeting of HEPix IPv6 at CERN, 15/16 Mach http://indico.cern.ch/categoryDisplay.py?categId=3538