East Hall under construction

Slides:



Advertisements
Similar presentations
General Infrastructures Services Department LIU-SPS external beam dump - Internal Review Civil Engineering Aspect for Option B (LSS4) 30/7/2014 Martin.
Advertisements

CENF – Civil Engineering Extension B887 CERN: An accelerator complex unique in the world -Prevessin site complex- -EHN1 Extension Area- EHN1 Extension.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
Plan. 12/05/ Who are we? PM (Project Management and Resource Planning) – APT – IMPACT – PPTEU2 – Plan LS1 – 2012 –…–… Plan V2 – From LS1 to LS2.
R2E Mitigation Project P5 Relocation Options - Discussion R2E Mitigation Project CMS Relocation Options Towards An R2E Baseline 1 M. Brugger for the R2E.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Cooling & Ventilation feed-back M. Nonis – EN/CV.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
Contributions from BE -ABP -ASR -BI -CO DG -RP EN -CV -EL -MEF -STI GS -SEM -ASE IT -CSPH -CMXTE -CRG -EPC -MPE Follow.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – FY 2014/15 – Cost to Completion Risks – Top level to completion – R9 working space – Summary.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
East Area Renovation Project Planning activities Quentin Bouirek / EN-EA, East Hall under construction
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
East Hall under construction
SMB Department LS2 period main activities Luigi Scibile (SMB-SE) on behalf of SMB
SPS Personnel Protection System Renovation Project
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
CERN Construction Planning and Scheduling (LHC installation)
East Area Renovation Project Team meeting # 2 – EDMS News
LIU – EVM status and next steps
Framework Schedule from EYETS 2016 to LS2
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
VENTILATION OF AD TARGET Kick off meeting
Brief Status SPS Prototype PSB Prototype Installed in LS1
Feedback from POPS-B explosion analysis
LIU Consolidation project (INDICO ) E. Blanco BE/ICS
ELENA installation and commissioning status
East Hall under construction
LIU – EVM status and next steps
UK Financial Plan & Risks
Configuration Management and Layout Database ELENA Project
WP8 – Improvement and equipment of irradiation beam lines
EC Activities Status for the LIU
News and brief overview of Beamline plans for the next few months
East Area Renovation Project team #6 Launch safety agreement
4th FRC meeting, Antti Onnela, CERN-PH-DT
LV Safe Powering from UPS to Clients
Accelerator and Experiment Interface Session: LS2, LS3
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
RWTCS Steering Commitee
HL Consolidation Day Analysis of needs from BE-ICS
SPS activities during LS2 TE-EPC (Power Converter Group)
Acknowledgments: LIU-PT members and deputies, H. Bartosik
East Hall under construction
UK RFD Pre-Series cryomodule
GIS Portal Racks Project
PLAN Results K. Foraz on behalf of LS2 team
Implementation Challenges
Experimental Areas – LS2 planning
LHC External Collimation Review
Radiological and Environmental Monitoring System (REMS)
East Hall under construction
East Area Renovation Supply of control rooms b.157
East Hall under construction
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

East Hall under construction - 1962 East Area Renovation meeting #5 Schedule Quentin Bouirek / EN-EA, 16-12-2016 East Area Renovation

Contents Key design parameters Proposal to anticipate CE works Linear Schedule Gantt Schedule Risks Cost and Schedule review #1 December 8th, 2016

Key design parameters Start/end dates Operation constraints Last beam sent to East Area  18/11/2018 End  target date : 05/07/2021 (end of commissioning and restart of physics in East Area) Operation constraints Logistics constraints Co-activity constraints Resource constraints Procurement constraints Radiological constraints Cost and Schedule review #1 December 8th, 2016

CLOUD layout Cost and Schedule review #1 December 8th, 2016

Operation constraints No run in 2019 and 2020 would be a pity for the Cloud experiment. However a lot of services are required to run the experiment (electricity, gas, access control, …) Runs without beam are being considered Q1/2019 and Q4/2020 to minimize impact on renovation. Cost and Schedule review #1 December 8th, 2016

Operation constraints EA primary area and B.352 are closely linked As PS ring beam commissioning restart as from Q4/2020, all works in EA primary area and B.352 should have been completed beforehand. Especially EIS-B to protect downstream areas. Finding: Civil engineering works (external envelope) are independent from operation Cost and Schedule review #1 December 8th, 2016

B352 to EA primary area Cost and Schedule review #1 December 8th, 2016

LS2 Schedule Cost and Schedule review #1 December 8th, 2016

Hardware test Beam Comm’ PSB 04/2020 09/2020 PS 08/2020 12/2020 SPS 01/2021 LHC 10/2020 03/2021 Cost and Schedule review #1 December 8th, 2016

Resource constraints Many competing activities (LIU, LHC, HL-LHC, other projects) Lack of resources identified in many groups (see Sebastien’s talk) Resource availability not complying ideal schedule: beam commissioning of injectors and LHC get a higher priority than East Area  compromise solutions. Cost and Schedule review #1 December 8th, 2016

Logistics constraints Civil engineering works: Generate waste Waste management Activated waste  ISR’s Asbestos waste  Swiss disposal path Conventional waste  SMB waste service Need for temporary storage spaces for: Concrete and cast iron blocks Magnets Access control equipment during relocation New material from CE Finding: difficult to conduct beam line & building renovation in parallel. Cost and Schedule review #1 December 8th, 2016

Logistics constraints (II) Major civil engineering works for B.157, B. 251 and synergy with B.156 Parking lots will be used. Storage space 2 Storage space 1 Cost and Schedule review #1 December 8th, 2016

Co-activity constraints The renovation implies to dismantle all the beam lines (except T8) and associated services involving more than 15 equipment & services groups many co-activities. Dismantling – Cleaning – Installation – Hardware commissioning – Beam commissioning = main phases, difficult to mix them Multi-layer co-activities. Finding: difficult to conduct beam line & building renovation in parallel. Cost and Schedule review #1 December 8th, 2016

Co-activity constraints D. Brethoux Cost and Schedule review #1 December 8th, 2016

Procurement constraints Example: CE procurement & contracting As cost estimate . 750 kCHF IT + FC approval before contracting Reverse planning: target = December’17 FC, tight schedule! CSR 08/12/2016 13/12/2017 FC Cost and Schedule review #1 December 8th, 2016

Radiological constraints Work in controlled areas 6 month-cool-down prior to any long-duration intervention in primary area 2 month-cool-down prior to any short-duration intervention in primary area G. Dumont Cost and Schedule review #1 December 8th, 2016

Radiological constraints No modifications area (CLOUD) Fast access area Delayed access area No modifications area (CHARM/IRRAD) Cost and Schedule review #1 December 8th, 2016

Proposal to anticipate CE works The goal is to avoid coactivity between civil engineering and EN-EA renovations. Proposal to carry out building renovation (in parallel to run) in 2018 and beam line renovation during LS2. Cost and Schedule review #1 December 8th, 2016

Proposal to anticipate CE works Declassify the ceiling area to allow CE works during operation: supervised  non- designated area Possible with some mitigation measures: Additional shielding blocks above primary area. CE staff access only by means of external staircases. Building access integrity must be ensured at all worksite stages (no intrusion) . Additional TLD dosimeters to continuously monitor this area. Start with zone 2 and 4 (learning process). Cost and Schedule review #1 December 8th, 2016

Ceiling working areas (zone 1) Ceiling access area 1 Ceiling access area 2 Ceiling access area 3 Ceiling access area 4 D. Brethoux Cost and Schedule review #1 December 8th, 2016

Main Phases stage Groups involved Date Comments Civil Engineering works SMB-SE December 2017 January 2019 Dismantling EN-EA, EN-HE Nov 2018 – April 2019 Cloud runs EP-DT Feb-March 2019 + November Dec 2020 Cleaning EN-EA Q3-4/2019 after final dismantling Shielding modification Q4/2019 Installation all Q1-2-3/2020 Hardware Commissioning Q4/2020 Beam commissioning Q2/2021 Cost and Schedule review #1 December 8th, 2016

EA Renovation linear schedule Timeline Different working areas Cost and Schedule review #1 December 8th, 2016

EA Renovation linear schedule Cost and Schedule review #1 December 8th, 2016

EA Renovation linear schedule Cost and Schedule review #1 December 8th, 2016

Schedule improvement Add 4 month to the physic period Cost and Schedule review #1 December 8th, 2016

Risks Risks Detail Group Mitigation Lack of resources causing delays or activity cancellation Missing staff to follow the project EN-CV (1,8 FTE.y) EN-EL (2 FTE.y) EN-EA (3 FTE.y) Management to allocate more resources Failure in the supply chain Delay on equipment availability TE-MSC (magnets) TE-EPC (Power converters) See Sebastien’s talk Weather constraints Work stoppage due to bad weather conditions SMB-SE Flexibility in the schedule: focus activity on indoor works Cost and Schedule review #1 December 8th, 2016

Summary Schedule was build by taking following constraints: Operation constraints Logistics constraints Co-activity constraints Resource constraints Procurement constraints Radiological constraints Blocking point: Lack of resources in a few groups Cost and Schedule review #1 December 8th, 2016

Thanks for your attention! East Area Renovation Cost and Schedule review #1 December 8th, 2016

Miscellaneous 157 Integration LS2 T9-T10-T11 Cost and Schedule review #1 December 8th, 2016

EA Renovation baseline Cost and Schedule review #1 December 8th, 2016