Review of MSU/AMSU Re-Calibration Product

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
16-17 May, GSICS Coordination Center (GCC) Report GSICS Executive Panel Meeting 15 Larry Flynn, Manik Bali, and FangFang Yu 2014 GSICS Executive.
GSICS Coordination Center Update GSICS Executive Panel Meeting 12 Fuzhong Weng and Fangfang Yu GSICS Coordination Center.
Atlanta Public Schools Project Management Framework Proposed to the Atlanta Board of Education to Complete AdvancED/SACS “Required Actions” January 24,
P1516.4: VV&A Overlay to the FEDEP 20 September 2007 Briefing for the VV&A Summit Simone Youngblood Simone Youngblood M&S CO VV&A Proponency Leader
GSICS Coordination Center Update GSICS Executive Panel Meeting 10 6 June 2011 Fuzhong Weng and Bob Iacovazzi, Jr. GSICS Coordination Center.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
GSICS Coordination Center Report GSICS Executive Panel Meeting 14 GSICS Coordination Center.
QA4EO in 10 Minutes! A presentation to the 10 th GHRSST Science Team Meeting.
GSICS Data and Products Servers Volker Gärtner (EUMETSAT) For GSICS Data Working Group.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO A WMO perspective on GSICS Joint Meeting of the.
GSICS GDWG Report, Toulouse, 9 February GSICS Data Working Group Status Report V. Gaertner CMA, EUMETSAT, JMA, KMA, NOAA/NESDIS, WMO.
June, GSICS Coordination Centre (GCC) Annual Report to the Executive Panel Document #3 Larry Flynn and Manik Bali 2016 GSICS Executive.
16-20 March, GSICS Coordination Centre (GCC) Report Larry Flynn and Manik Bali 2015 GSICS Annual Meeting New Delhi, India March 16-20,
June, GSICS USER GUIDE Using GSICS Products and Services Manik Bali, Tim Hewison, Larry Flynn and Jerome Lafeuille 2016 GSICS Executive Panel Meeting.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Documenting GSICS as an element of the WMO Integrated.
GSICS Procedure for Product Acceptance (GPPA) WorkFlow GCC Presented by Fangfang Yu 12/03/
Report from 17th GSICS Executive Panel, Biot, 2-3 June 2016 Presenter (..) GSICS-EP-17, Biot, 2-3 June
GSICS Coordination Center Report Fangfang Yu, Fuzhong Weng, Fred Wu and George Ohring NOAA/Center for Satellite Applications and Research 8 April, 2013.
Highlights (Actions) of GSICS Exec Panel 30 October 2009 Volker Gärtner.
Marianne König, Tim Hewison, Peter Miu
GSICS Procedure for Product Acceptance Update
Project Management PTM721S
Comments on Template & Document Management System for GSICS
GSICS MW products and a path forward.?
GRWG/GDWG Joint Web Meeting Agenda
Jerome Lafeuille WMO Space Programme Office
GSICS Collaboration Servers a Vehicle for International Collaboration Status 2011 Peter Miu EUMETSAT.
Chapter 11: Software Configuration Management
Planned Activities of GSICS Microwave sub-group
GSICS Coordination Center (GCC) Report
GSICS Review Summary Manik Bali.
Operational Aspects of GSICS
GSICS Quarterly Special Issues and Editors
GDWG Agenda Item Repository for GSICS Work - Clarification on Archiving Masaya Takahashi, JMA CMA, CNES, EUMETSAT, ISRO, IMD, JAXA, JMA, KMA, NASA, NIST,
Larry Flynn and Manik Bali 2016 GSICS Executive Panel Meeting
GIRO usage and GSICS Lunar Observation Dataset Policy S. Wagner
GSICS Data Management and Availability to Users
Improvement Suggestions to the Procedure for Product Acceptance
Actions and Recommendations of the Joint Session
Document Management System
Manik Bali, Larry Flynn NOAA/STAR
The GSICS Procedure for Product Acceptance ( GPPA )- New Challenges
Jo Schmetz1 on behalf of Tim Hewison1 EUMETSAT
Quality Management Systems – Requirements
GSICS Product Submission & Promotion Documents 8.1 and 8.2
Masaya Takahashi (JMA)
Update on the GSICS Procedure for Product Acceptance (GPPA)
2b. GSICS Coordination Centre (GCC)
GSICS Coordination Center GSICS EP- Debrief
Xiangqian WU and Fangfang YU with contributions from
GSICS-EP-19, Bangalore, India, 1-2 June 2018
GDWG Joint Meeting Summary and Actions 2017
Chapter 11: Software Configuration Management
Technical aspects of the GIRO work: inputs from GRWG
Status of the EUMETSAT GSICS DCC product
GSICS Coordination Center (GCC) Report
The GSICS Procedure for Product Acceptance ( GPPA )- Timeliness
Masaya Takahashi (JMA)
Summary of 2019 GDWG breakout session
Hot summary of the Fourth GSICS Users Workshop
GSICS Data Management Working Group Summary and Action Items
GSICS Coordination Centre (GCC) Report for
Software Reviews.
GSICS Coordination Center (GCC) Report
Lunar Calibration Workshop Status of the preparation
2s. Defining GSICS Products and Deliverables
GSICS Documentation Discussion - classification and storage
GSICS Newsletter Microwave mini issue
Presentation transcript:

Review of MSU/AMSU Re-Calibration Product GCC 08/06/2013

Outline Review of the GPPA Current status of MSU/AMSU Products Discussion of potential solution to impediments GCC staff change

Fundamental Capabilities of GPPA GPPA was originally developed by Dr. Bob Iacovazzi, following the QA4EO guidelines The GPPA is the GSICS: Product developers pathway to obtain a “Stamp of Approval” for a potential product Data users window to GSICS product quality and “fitness for purpose” Governing body reference for judging GSICS product fitness The GPPA defines and documents: Scope of product within the GSICS product portfolio – correction of level1b data Theoretical basis, traceability, and implementation and distribution strategy Product quality (uncertainty, quality indicators, data user’s guide, etc) The GSICS Product Acceptance Form (GPAF) is available at GSICS wiki https://gsics.nesdis.noaa.gov/wiki/Development/GppaWorkflow

Four Product Phases Submission Phase Demonstration Phase Pre-operational Phase Operational Phase

GPPA: Submission Phase Phase Progress: GSICS Product Acceptance Form (GPAF) is satisfactory, Sample data files conform to GSICS file and parameter naming and format standards, Verified to be within GSICS scope, and Theoretical basis is understood at a high-level. Documents & Data to GCC: GPAF sections that detail product name, POC, brief description, and relevance to GSICS. Preliminary version of the product algorithm theoretical basis document (ATBD) Sample product files that adhere to GSICS file and parameter naming conventions Reviewers: GSICS Product Acceptance Team (GPAT) Maximum Time Period: 90 Days

GPPA: Demonstration Phase Phase progress: Founding concepts, supporting models and measurements, and implementation are documented and fully understood, Traceability to community reference standard is documented, Quality Indicator is documented and well-defined, Tested and reviewed by potential product users, and Data released to GSICS members and potential users. Documents & Data to GCC: Routine product upload to a GSICS data server and agree on file retention policy. Baseline versions of four documents critical to product quality assurance – Algorithm Theoretical Basis Document, Document describing product traceability to standards Product supporting radiative transfer model and cal/val supporting measurements description Product quality indicator description and justification Reviewers: GPAT & potential product users Maximum Time Period: 365 Days

GPPA: Pre-operational Phase Phase progress: Generation, distribution, version control and archive strategies are fully documented and implemented. Users’ Guide with clear implementation instructions made available to data users, Data released to public with disclaimer. Documents associated with product data stewardship in an operational environment to GCC: product version control plan, operations and distribution plan, and data user's guide Reviewers: GPAT & GSICS Executive Panel (EP) Maximum Time Period: 180 Days

GPPA: Operational Phase Goal: Product is fully accepted by GSICS Executive Panel (EP) and maintained within GSICS and distributed to the public. Maximum Time Period: Periodic Reviews Milestones: The following are made available by the product provider to the GCC and the GPAT for periodic inspection and review Product logs and usage reports Updated documentation/software as necessary

Current Status of MSU/AMUS Product The 3rd party product was first submitted for GPPA review in Jan 2010. Issue in the Product Submission Phase: the product may not be archived at the GSICS server(s) as requested and different name conventions. Solution: EP granted an exempt clause for the GISCS server to link the (A)MSU product and GDWG will be working to resolve the name convention issue. Resubmitted for the GPPA review in June 2012 GCC disseminated the review documents to GPAT in June 2012 the GPAT members for the MW product included the GPRC representatives and GRWG+GDWG chairs Product was promoted to Demonstration phase in August 2012 Base don the critical review comments and suggestions from GPAT (3 reviewers) Sent to external review in November 2012 MW subgroup Very few feedback received Another call for product test in July 2013 Potential users MW subgroup members

Potential Solutions Call for volunteers from the product users to review the documents and data usability and dissemination MW subgroup Dedicated MW meeting(s) Other suggestions? Any product review comments are more than welcome and greatly appreciated during and beyond the GPPA review period.

GCC Staff Change GCC Director GCC Deputy Director Dr. Larry Flynn (Dr. Fuzhong Weng stepped down) GCC Deputy Director Dr. Manik Bali (Dr. Fangfang Yu will step down on Sept. 1 2013)