LDF “Highlights,” May-October 2017 (1)

Slides:



Advertisements
Similar presentations
System Center 2012 R2 Overview
Advertisements

Skyward Disaster Recovery Options
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Talend 5.4 Architecture Adam Pemble Talend Professional Services.
Windows Azure Conference 2014 Oracle on Windows Azure.
CERN IT Department CH-1211 Genève 23 Switzerland t Integrating Lemon Monitoring and Alarming System with the new CERN Agile Infrastructure.
The SAM-Grid Fabric Services Gabriele Garzoglio (for the SAM-Grid team) Computing Division Fermilab.
Assessment of Core Services provided to USLHC by OSG.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Oracle Application Server 10g (9.0.4) Recommended Topologies Pavana Jain.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
 Cloud computing  Workflow  Workflow lifecycle  Workflow design  Workflow tools : xcp, eucalyptus, open nebula.
Control Software Integration German Schumacher T&S Software Lead.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
DC2 Post-Mortem/DC3 Scoping February 5 - 6, 2008 DC3 Goals and Objectives Jeff Kantor DM System Manager Tim Axelrod DM System Scientist.
NA-MIC National Alliance for Medical Image Computing UCSD: Engineering Core 2 Portal and Grid Infrastructure.
NMNH EMu DAMS Integration Project Rebecca Snyder Smithsonian, NMNH.
INTRODUCTION TO DBS Database: a collection of data describing the activities of one or more related organizations DBMS: software designed to assist in.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
LegendCorp What is System Center Virtual Machine Manager (SCVMM)? SCVMM at a glance Features and Benefits Components / Topology /
OAIS Rathachai Chawuthai Information Management CSIM / AIT Issued document 1.0.
LSST VAO Meeting March 24, 2011 Tucson, AZ. Headquarters Site Headquarters Facility Observatory Management Science Operations Education and Public Outreach.
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
National Archives and Records Administration Status of the ERA Project RACO Chicago Meg Phillips August 24, 2010.
CERN - IT Department CH-1211 Genève 23 Switzerland t High Availability Databases based on Oracle 10g RAC on Linux WLCG Tier2 Tutorials, CERN,
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Building Preservation Environments with Data Grid Technology Reagan W. Moore Presenter: Praveen Namburi.
V7 Foundation Series Vignette Education Services.
Architecture of a platform for innovation and research Erik Deumens – University of Florida SC15 – Austin – Nov 17, 2015.
Data Analytics and Hadoop Service in IT-DB Visit of Cloudera - April 19 th, 2016 Luca Canali (CERN) for IT-DB.
CTA: CERN Tape Archive Rationale, Architecture and Status
1 OBSERVATORY CONTROL SYSTEM (OCS) FRANCISCO DELGADO OCS CAM.
CERN IT-Storage Strategy Outlook Alberto Pace, Luca Mascetti, Julien Leduc
Windows 2012R2 Hyper-V and System Center 2012
Bob Jones EGEE Technical Director
Landsat Remote Sensing Workflow
WP18, High-speed data recording Krzysztof Wrona, European XFEL
. . . ? ? ? ? ? ? ETL Engine Server Gateway Server Database Server
Report from WLCG Workshop 2017: WLCG Network Requirements GDB - CERN 12th of July 2017
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Ian Bird GDB Meeting CERN 9 September 2003
Consulting Services JobScheduler Architecture Decision Template
An Overview of Data-PASS Shared Catalog
Ops Manager API, Puppet and OpenStack – Fully automated orchestration from scratch! MongoDB World 2016.
Joseph JaJa, Mike Smorul, and Sangchul Song
DI4R, 30th September 2016, Krakow
Current Resources LSST-DEV General Purpose Login/Compute Node. Supports developers and staff. Primary Linux Machine for this use.
T-StoRM: a StoRM testing framework
API Aspect of the Science Platform
CCNET Managed Services
Chuck F Claver LSST System Scientist & Commissioning Lead
Computing Infrastructure for DAQ, DM and SC
Oracle Solaris Zones Study Purpose Only
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 6 – 7 July 2016.
CIMI Enterprise Architecture Proposal
NCSA Plan for DPP: Construction and Operations of the LSST Data Facility Don Petravick, Paul Domagala, Margaret Johnson Joint Technical Meeting March.
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
ITD Service Catalog October 20th, 2009
SDM workshop Strawman report History and Progress and Goal.
LSST Control Software Integration Francisco Delgado OCS Software Manager LSST Commissioning Plan Review January 24-26, 2017.
Storage Trends: DoITT Enterprise Storage
Clouds & Containers: Case Studies for Big Data
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
A Network Operating System Edited By Maysoon AlDuwais
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 12 – 13 December 2016.
Solution versatility Standalone Large scale
Designed for powerful live monitoring of larger installations
Robin Dale RLG OAIS Functionality Robin Dale RLG
Salesforce.com Salesforce.com is the world leader in on-demand customer relationship management (CRM) services Manages sales, marketing, customer service,
PerformanceBridge Application Suite and Practice 2.0 IT Specifications
Presentation transcript:

LDF “Highlights,” May-October 2017 (1) Services Supporting Observatory Operations (aka Level 1 Services) Installation of DAQ in Level 1 Complete Test Stand and integration of Archiver. Hosted Systems Engineering Early Pathfinder software integration workshop. Exercise command sequence for single main camera visit. Preliminary design and review of Header Builder. Batch Production Services Completed reprocessing campaign of HSC SSP PDR1. Continued biweekly RC processing campaigns. Unit-tested DESDM framework on verification cluster using Oracle DB instance for storing metadata, provenance, location. Containerized Application Management Services Deployed instance of Kubernetes on the NCSA Nebula as functional integration platform. Deployed JupyterLab container, integrated with LSST IdM system, read-only GPFS. Deployed test Kubernetes in VM to prototype functionalities and stability, and to advise FY18 Acquisition Strategy of establishing Kubernetes core. Investigated OpenShift container orchestration and management system to understand functionalities on top of bare Kubernetes, how these support facility concerns of resource management, flexible provisioning, security. (tech note forthcoming) DMLT F2F | Tucson, AZ | 2017-11-02

LDF “Highlights,” May-October 2017 (2) ITC Completed detailed specification and procurements of remaining FY17 capabilities: Base AA & Network Security systems at interim facility (prototypes site coordination and support), single-node Oracle system for first standalone consolidated database (used through ComCam), and 3-PB storage expansion for production file systems. Completed FY18 Acquisition Strategy plan defining capabilities to be procured. Continuous operational support of developer and integration systems and services. Management of Facility Baselined LSST Data Facility plan, transitions LDF from construction to operations. Began recording mid-level architecture as defined in the rebaselined WBS in TOGAF standard architecture language (ArchiMate), which follows the layered service architecture we have used as the framework of our plan. Supports overall management of the Data Facility. Working Groups SuperTask and Butler working groups participation to represent facility operations needs and assure production use cases are supported by proposed architecture. Began chairing and leading activities for the Lossy Compression Working Group. DMLT F2F | Tucson, AZ | 2017-11-02

FY18 Goals (1) – Support Major Milestones HSC Reprocessing – Nov 2017 Goal: Production processing using initial version of production workflow system and production file system context. Spectrograph Test Stand in Tucson -- Feb 2018 Goal: Read out the Spectrograph with the L1 archiver service software and archive data as FITS files to local disk. Provide ability for operator to ingest (transfer and record) selected engineering data into Data Backbone at NCSA. Provide access to files for staff via mounted filesystem (read-only) on lsst-dev and web download. Spectrograph On Sky – Aug 2018 Goal: Spectrograph Service Bundle deployed in production – Spectrograph Archiving Service, EFD ETL Service, Observatory Operations Data Service, header writer deployed in Observatory system. Offline campaign processing service for spectrograph data use cases. DMLT F2F | Tucson, AZ | 2017-11-02

FY18 Goals (2) – Evolution of Facility Provide offline L1 processing service, develop first-order QA processes. Facility scientist to liaison and set up. Support single production framework. Integrate Butler and SuperTask components as available and verify use in production. Deploy instance of LSP for Staff at NCSA. Facility scientist to start integrating components, liaising with groups providing components, using like in production, understanding system from an operational perspective. Extends to the PDAC integration platform while maintaining primary focus on the production instance for staff. File management for production file systems, including backup and disaster recovery services. Administration of raft-scale consolidated DB. (Selected) FY18 Acquisition Strategy capabilities support establishing LDF core Kubernetes commons at NCSA. Supports development, integration and production use cases. completing the Level 1 Complete Test Stand to fully support all Observatory components and early pathfinder activities. establishing data transfer service for data transfer between sites. Contexts: ingest from test stands and instruments, export to authorized users, staging for batch production by workload management system. deploying Summit endpoint for AA and network security. supporting Spectrograph service bundle in Chile, including Base site file systems. integrating MyDB capability with PDAC. (late FY18) prep for initial commissioning cluster – batch, Kubernetes, consolidated database for MyDBs. flexible provisioning, remote provisioning, development of administrative processes. provisioning LSST core network fabric in NPCF. Support flexible provisioning of commons for separate enclaves; ability to exploit idle Kubernetes nodes for batch production. Establish service-level monitoring for all services we are currently running and plan to have running in FY18. 24/7 incident response for services running in Chile, beginning with deployment of AA & security services. Processes for managing incidents, requests, changes, problems. Integration with existing workflows and systems (NCSA ICI, LSST ITSC). Metrics for capacity and availability management. Supports acquisition strategy planning. Support commissioning planning efforts DMLT F2F | Tucson, AZ | 2017-11-02