IEEE 802.21 MEDIA INDEPENDENT HANDOVER DCN: Title: Liaison Report – 802.16 Work Related to 802.21 Date Submitted: July 19, 2012 Source: Dan Gal, Alcatel-Lucent Abstract: 802.16 liaison report on 802.16 activities in Session #80, San Diego San Diego, California July 19, 2012 Dan Gal, ALU Slide 1 January 19, 20006 David Hunter, Panasonic
IEEE 802.21 presentation release statement This document has been prepared to assist the IEEE 802.21 Working Group. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.21. The contributor is familiar with IEEE patent policy, as outlined in Section 6.3 of the IEEE-SA Standards Board Operations Manual <http://standards.ieee.org/guides/opman/sect6.html#6.3> and in Understanding Patent Issues During IEEE Standards Development http://standards.ieee.org/board/pat/guide.html> San Diego, California July 19, 2012 Dan Gal, ALU Slide 2 January 19, 20006 David Hunter, Panasonic
Liaison Report IEEE 802.16 Session #80, San Diego Dan Gal Alcatel-Lucent dan.gal@alcatel-lucent.com San Diego, California July 19, 2012 Dan Gal, ALU Slide 3 January 19, 20006 David Hunter, Panasonic
Objectives of Session #80 GRIDMAN Task Group – 802.16n - Resolve ballot comments and create a new, D4 of the draft standard. Maintenance Task Group – wrap up its activities this meeting HetNet Study Group – 802.16q – develop PAR & 5C Metrology Study Group (i.e. Performance Measurement of IP-based end-to-end systems): develop a PAR & 5C. Project Planning Committee New potential project on Proximity Based Applications and D2D communications; will draft a PAR&5C doc for the September 2012 meeting. New Potential project on Wireless Backhaul for Small Cells ITU-R Liaison Group – review incoming liaison letters and prepare outgoing. Work on updates of 802.16e (IMT-2000) and 802.16m (IMT-Advanced) material for the respective ITU-R Recommendations (1459 and 2012) San Diego, California July 19, 2012 Dan Gal, ALU Slide 4 January 19, 20006 David Hunter, Panasonic
802.16n – GRIDMAN Study Group Greater Reliability In Disrupted Metropolitan Area Networks Status this week: Resolved ballot comments on D3. Will issue a new draft, D4. San Diego, California July 19, 2012 Dan Gal, ALU Slide 5 January 19, 20006 David Hunter, Panasonic
802.16q – HetNet Study Group Received and resolved comments on its draft PAR + 5C Will be submitted to the 802 EC for approval this Friday Focuses on Single (802.16) RAN Another PAR will be created in November 2012 – for Multi-RAN San Diego, California July 19, 2012 Dan Gal, ALU Slide 6 January 19, 20006 David Hunter, Panasonic
Metrology Study Group Objective: to amend the 802.16 standard and add Performance Measurement capabilities (passive as well as active) Prepared PAR + 5C Will be submitted to the 802 EC for approval this Friday San Diego, California July 19, 2012 Dan Gal, ALU Slide 7 January 19, 20006 David Hunter, Panasonic
Project Planning The status after this session: Potential new projects: Proximity Based Application Wireless Backhaul solutions based on 802.16 for Small Cells. The status after this session: Ready to start developing the Proximity PAR + 5C Only got buy-in of the TG for SCB project (Small Cell Backhaul) San Diego, California July 19, 2012 Dan Gal, ALU Slide 8 January 19, 20006 David Hunter, Panasonic