OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.

Slides:



Advertisements
Similar presentations
Future Of OASIS Conference March 29, 2005 Future of OASIS Conference Related Industry Initiatives NAESB - Robert Harshbarger OASIS IA Task Force and ESS.
Advertisements

NAESB Coordinate Interchange Standard, Version 1 / 0
MISO Southern Region Integration – ARR/FTR Timeline FTR WG February 6,
Oasis Overview. 2 OASIS Overview What is OASIS? S –Open Access Same Time Information System –Electronic site for transmitting utility information to customers.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
MISO’s Midwest Market Initiative APEX Ron McNamara October 31, 2005.
Andy Meyers Bonneville Power Administration Merchant Alert Protocol Market Interface Committee March 2015 Salt Lake City, UT.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Economic Demand Response Sheldon Fulton Executive Director, IPCAA November 4, 2008.
Texas Regional Entity Compliance Report TAC July 9, 2009.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
PA AEPS Summit Harrisburg PA Thursday, June 17, 2010.
OASIS Insights & Observations Transmission Customer Forum September 21-22, 2006 Jim Viikinsalo September 21-22, 2006 Jim Viikinsalo.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 4, 2009.
Bulk Power Transmission System
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
12/4/2007 ERCOT Public INF MP Identity Management: Roles Gary Macomber.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
June 17, Strategic Framework Business Definition and Strategic Issues Board of Director’s Meeting June 17, 2003 ERCOT Strategic Planning Task Force.
Lead from the front Texas Nodal 1 Texas Nodal CRR Requirements Overview of Requirements for TPTF Shawna Jirasek and Beth Garza September.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
ERS Update – DSWG Presentation September 21, 2012.
Distributed Generation Registration June 30, 2008.
Transmission Rights. The Markets EnergyForwardTransmissionRightsAncillaryServices Must Run Contracts Energy OperatingReserveCapacityReserve Procurement.
Integrated Marketplace MUI Technical Specifications February 17, 2012.
Transmission Tariff V.Balaji Chief Manager SRLDC.
DAM and Nodal Collateral Requirements Concerns and Solutions December 7, 2009.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
Direct Participation Enrollment Process for 2017 DRAM
EMR Delivery Body Contract for Difference – December 2016.
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
IPC’s Energy Imbalance Market OATT Stakeholder Meeting
Procurement & Strategic Sourcing Commercial Print Services
Carbon Free Energy with Storage 2017 JOINT REQUEST FOR OFFERS
TAC Report to the ERCOT Board
FERC Standard Market Design Working Papers
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Southern Cross Transmission LLC Owner/Operator of a Merchant DC Tie
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
NERC Entity Registration and Certification in the ERCOT Region
Energy Storage Settlements Consistent with PUCT Project & NPRR461
Pseudo-tie business procedure
U.S. Small Business Administration South Florida District Office
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Rates & Regulatory Updates
“TOP-010-1: Data Quality, Analysis Quality, and Alarm Process Monitor”
Cold Snap Task Force Update
Duke Energy Carolinas Quarterly Stakeholder Meeting
Customer Dedicated Solar
Workshop Session 1: Overview
Workshop Session 1: Overview
ESC Use Case Review Joint OASIS Implementation Task Force Paul R
North America Energy Standards Board
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
PRISMA General Information
Pseudo-tie business procedure
OASIS Notification Recommendation.
Presentation transcript:

OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004

Stage 1 Components Participant Registration User Registration Key Liaison - NERC User Registration Market Resource Registration Key Liaison – NERC & IRC Publish/Subscribe Key Liaison - none Operations Data Exchange Auction Transmission Markets Key Liaison - IRC

Participant Registration Central Registry Requirements Identify Business Entity Identify Business Role(s) Identify Contact Information Market Registry Requirements Key to Central Registry? Identify Market Access Markets (e.g., Transmission, Energy, etc.) Market Resources Owned/Operated Market Agreements/Contracts

Participant Registration Submit Participant Registration Participant ID Participant State (e.g., Accepted, Denied) Activation date/time Deactivation date/time Legal business name of the Participant organization Industry recognized business identifier (e.g., DUNS number, etc.) Address Contact information (phone, FAX, etc.) Method(s) of establishing creditworthiness Roles played in the market: PSE LSE GPE Transmission Customer Transmission Owner Transmission Operator Generation Owner Generation Operator Reliability entity Reliability Authority Balancing Authority Market services being requested; initial service agreement application. (May be inferred by market role, e.g., GPE must execute interconnection agreement(s), TCs must execute pro-forma service agreements, etc.). Other market-dependent information requirements

Participant Registration Modify Participant Registration Change/add/delete subset of registered data Set Participant Registration State Acknowledge Acceptance or Denial of registration request View Registration Generic query for registration information

Central Registry Requirements Market Registry Requirements User Registration Central Registry Requirements None? Market Registry Requirements Identify Business Entity Identify User Identify User Roles Identify User Market Access (subset of Participant’s) Markets (e.g., Transmission, Energy, etc.) Market Resources Owned/Operated

User Registration Submit User Registration User ID User State (e.g., Accepted, Denied) Activiation date/time Deactivation date/time Legal business name of the User's Participant organization (or Participant ID) User name Address Contact information (phone, FAX, etc.) e-MARC certificate information (one or more): user's distinguished name certificate issuer's distinguished name Roles played in the market (access rights/privileges): User Administrator Energy Market Participant Transmission Rights Market Participant Scheduler Reliability operator Etc. Other market dependent user registration information

Modify User Registration Set User Registration State View Registration Change/add/delete subset of registered data Set User Registration State Acknowledge Acceptance or Denial of registration request View Registration Generic query for registration information

Market Resource Registration Facilities Physical Generator Station Line Etc. Resources Commercial Source/Sink POR/POD Location Hub Load Aggregate May Map to Facility(ies) Others?

Market Resource Registration Central Registry Requirements POR/PODs Source/Sinks Transmission Product (Attributes) Path Names? Location Names (e.g., p-nodes, hubs, load aggregates, etc.)? Commercial Mapping? Network Model Mapping? Key to Market Registry? Market Registry Requirements Key to Central Registry? Identify Facilities Identify Resources

Market Resource Registration Submit Facility Registration Facility ID Facility State (e.g., Accepted, Denied) Activation date/time Deactivation date/time Facility name Facility type (e.g., generator, station, meter, etc.) Facility sub-type, if applicable (e.g., coal fired, nuclear, etc.) Owner(s) Operator Operational status (e.g., construction, in-service, decommissioned, etc.) Ratings Other market dependent facility specific information Model data as required to support the market/network model

Market Resource Registration Submit Resource Registration Resource ID Resource State (e.g., Accepted, Denied) Activation date/time Deactivation date/time Resource name Resource type (e.g., generation, load, transmission, pricing, etc.) Resource type specific sub-type, if applicable (e.g., POR, POD, Flowgate, etc., for transmission; node, zone, hub, etc. for pricing) Associated Facility(ies) or other Resources, if applicable (e.g., generator facilities and weighting factors for generation resources; price nodes and weighting factors for zone pricing resources) Market Participant allowed to bid/offer the Resource (i.e., owner) Resource limits, default bid parameters, etc., if applicable Other market dependent Resource registration information

Market Resource Registration Modify Facility Registration Change/add/delete subset of registered data Set Facility Registration State Acknowledge Acceptance or Denial of registration request Modify Resource Registration Set Resource Registration State View Registration Generic query for registration information

Publish/Subscribe Submit Subscription Subscription ID Subscription State (e.g., normal, suspended) Activation date/time Deactivation date/time Delivery location/method Uniform Resource Identifier or Locator (URI/URL) of system to be notified Protocol (e.g., HTTP(S); email, etc.) Identification of data being subscribed to: "Category", e.g., Transmission, Registration, etc. "Type", e.g., Deals, Participant, etc. “Event”, e.g., Set TR Auction Bid/Offer State Optional data filter qualifiers (nature dependent on data subscribed to) Market Participant(s) Resource(s) Optional Subscriber specific context information to be included in each notification message sent to Subscriber.

Publish/Subscribe Modify Subscription Notify Subscribers Change/add/delete subset of registered data Notify Subscribers On Data Event Identify Subscribers Issue Notifications View Registration Generic query for subscription information

Operations Data Exchange Submit Outage Outage ID Outage State Activation date/time Deactivation date/time Facility name Outage type (e.g., planned, unplanned, etc.) Outage start date/time Outage stop date/time Updated facility ratings during outage General terms for deferring or accelerating outage including costs

Operations Data Exchange Modify Outage Change/add/delete subset of outage data Set Outage State Acknowledge Acceptance or Denial of outage request View Operations Data Generic query for operations data

Operations Data Exchange Submit Load Forecast Load Forecast ID Load Forecast State Load Identifier (e.g., name) Load Location (e.g., node, zone, etc.) Load Profile MW Start date/time Stop date/time

Operations Data Exchange Modify Load Forecast Change/add/delete subset of load forecast data Set Outage State Acknowledge Acceptance or Denial of load forecast View Operations Data Generic query for operations data

Auction Transmission Market Post TR Auction Announcement Free-form Data Network Model information Assumptions regarding system conditions: Total load forecasts Major facility outages Contingent elements Transfer Capability eligible for auction Auction rules

Auction Transmission Market Post TR Auction Announcement XML Data Auction ID Auction State (e.g., Pending, Open, Closed) Activation date/time Deactivation date/time Auction Name Auction Round Auction Timing Open/Close Clearing Auctioned Rights Products (e.g., on-peak obligation, etc.) Start/Stop

Auction Transmission Market Submit TR Auction Offer/Bid Offer/Bid ID Offer/Bid State (e.g., Accepted, Cleared) Customer Identifier (Seller/Buyer) Auction ID Auction Rights (e.g. on-peak option) Quantity Offer/Bid, MWs Price Receipt Point (Injection); for point-to-point products Delivery Point (Withdrawal); for point-to-point products Transmission Resource (i.e., Flowgate) for path type products Exchange TR Auction Bid/Offer ID

Auction Transmission Market Modify TR Auction Offer/Bid Change/add/delete subset of offer/bid data Set TR Auction Offer/Bid State Acknowledge Market Clearing Results Auction Offer/Bid ID Auction Offer/Bid State (e.g., Cleared) Auction Clearing Price Auction Cleared Rights MWs

Auction Transmission Market View Transmission Rights Generic query for transmission rights information Customer Identifier (Owner) Type of rights held (Product) (e.g. annual point-to-point CRR obligation, monthly flowgate CRR option) Purchase Price (if applicable) Rights Profile Quantity (MWs)* Start time of rights Stop time of rights Receipt Point (Injection); for point-to-point products Delivery Point (Withdrawal); for point-to-point products Transmission Resource (i.e., Flowgate or Path) Information tracking how and from where rights acquired: By Allocation At auction From TSP From secondary market resale From secondary market transfer

Auction Transmission Market View Transmission Rights * "Quantity" may be represented by multiple data elements to reflect: Quantity purchased/sold – used for settlements Quantity held – reflects current rights less any auction or bilateral secondary market resales/reassignments Quantity committed – reflects rights currently being used or otherwise not available for resale (i.e., scheduled use in physical rights markets, offered into auction for financial rights markets, pending resale/reassignment, etc.)