Camera to Top End Assembly Integration Travis Lange Camera I&T M. E

Slides:



Advertisements
Similar presentations
1 Second Safety Council Meeting Tucson, AZ April 10-11, 2014 Name of Meeting Location Date - Change in Slide Master The Dome Project Bill Gressler Telescope.
Advertisements

Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Vbine Energy Generator Assembly Pictures and Info Slide Show.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
M2 Status & Near Term Major Milestones C. Araujo/B. Gressler 1.
SOL-GEL COATING FACILITY CONCEPTUAL DESIGN REVIEW October 19, 2005.
I&T and Operating and Support Hazards Martin Nordby Chief Mechanical Engineer LSST Camera Safety Review August 18, 2015 R1.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Telescope Integration and Tests Tuesday Afternoon.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy LCLS Girder Support Concept Design Sushil Sharma.
Design Progress Allen Ellis 18-September
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
8am: start testing the corner cube mounts on DX cells.
15/07/2008 EMCAL Meeting Nantes A. Palmeri - F. Noto I.N.F.N. Catania1 EMCAL CATANIA A. Palmeri - F. Noto.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Almega. Visible Raman Microscope
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
Documenting Camera Base Facility Needs P Hascall.
Tim Abbott & Brenna Flaugher, CTIO Integration Meeting 1 The DECam Project Closeout, Action Items Hexapod Optical Lenses CCD Readout Filters Shutter 2008.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
6-Mar-2016 Dan Wenman | FC Installation 1 APA installation and integration at CERN Shipment of APAs APA handling Acceptance testing Tools needed.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
LSST SLAC Office of Communications August 8, 2016 Communications Roadmap.
Commissioning Planning
Installation Walkthrough Image Guide
LSST External Communications Suzanne Jacoby, Andrew Gordon Communications Leads at LSST and SLAC August 17,
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Refrigeration System Status and Plans
Camera Maintenance and Access
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Refrigeration System Status and Plans
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Interfaces Travis Lange ComCam TDR May 10, 2017
Cryomodule test stand at ESS site
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Kevin Reil LSST Commissioning Camera Rep
Mechanical Integration
C50 Cavity pair Assembly Changes
PFIS Camera & Collimator Conceptual Design
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
Management Breakout: MREFC Budget Summary Victor L
EVLA LO/IF Racks/Bin/Modules
GLAST Large Area Telescope:
Compressor Cabinet Design & Interface Diane Hascall Integration Engineer Joint Technical Meeting 2017 March 6, 2017.
Cryomodule Assembly Plan
OCP Engineering Workshop Rack & Power, Advanced Cooling Solutions, Data Center Facility
Polarized 3He target installation
ATST Instrument Interface Overview
Presentation transcript:

Camera to Top End Assembly Integration Travis Lange Camera I&T M. E Camera to Top End Assembly Integration Travis Lange Camera I&T M.E. LSST 2017 Project & Community Workshop August 16, 2017

Discussion Topics Space Planning in Summit Maintenance Area Un/under-defined Utilities Connections Tooling Needed for Integration

Space Planning at Summit Maintenance Area

3rd Floor Camera Maintenance Facility White Room Camera Staging and Test Area Clean Room Utility Area Walkway Mirror Coating Facility

Receiving the Camera and Prepping for Install Camera Integration Stand BOT Camera Staging and Test Area Clean Room (class 10,000) White Room (class 100,000)

Camera Testing & Alignment “Umbilicals”– Refrigeration, Power, Fibers, Copper Comm

Prep Hexapod/Rotator Assembly Camera Integration Assembly Stand/Cart Camera Top End Assembly

Integrate Camera on Hexapod/Rotator Assembly “Umbilicals”– Refrigeration, Power, Fibers, Copper Comm Complete Camera Top End Assembly ready for telescope

Un/Under-defined Utilities

Utility interfaces are defined in LSE-64 and LSE-65 Still Need: Utility Topics Utility interfaces are defined in LSE-64 and LSE-65 Still Need: Better definition of utility locations in Camera Maintenance Area Topic is covered by LCR-917 Addition of power for Camera Integration Stand Topic is covered by LCR-949 Define end-to-end connections of refrigeration protection See following slides Define end-to-end connections of refrigeration Define end-to-end connections of fiber optics Utilities need to connect to both Camera UT and back of Cable Wrap

Updated Staging Area Utilities Additional Nitrogen Tap New 220VAC/3-phase/48A per phase for Camera Integration DAQ/CCS Fiber Optic Refrigeration Isolation Valve Panel 380VAC/3-phase outside White Room door

Refrigeration Protection Communication Need similar layouts for DAQ/CCS Fibers and Refrigeration Lines Credit: P. Hascall

Tooling Needed for Integration

Mounted to the Integrating Structure How do we keep the bulkhead plate in position during integration? Need to align bulkhead plate to top end assy center bearing Camera needs a restraint for holding in place during shipping

Bulkhead Plate as Viewed from Camera Tolerance for center bearing?

Cable Wrap and Bulkhead Plate

T&S provides cart to hold Top End Assy Tooling Questions Camera provides lift fixture to move Camera from Integration/Test stand to Top End Assy T&S provides cart to hold Top End Assy Camera provides bulkhead plate restraint? Requirements? Guiding of Camera into Top End Assy provided by T&S? Tooling required for this? If so, must use features already defined in ICD (LSE-18)