Project Planning Committee Closing Report (Session #75)

Slides:



Advertisements
Similar presentations
M2M Study Report: Status Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0008 Date Submitted:
Advertisements

ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
Project Planning Committee Closing Report (Session #77) IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE Gdoc.
11 ITU-R Liaison Group Report - Session #75 Closing Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0058.
ITU-R Liaison Group Report - Session #75 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0056 Date.
Project Planning Committee Opening Report (Session #77) IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE Gdoc.
Project Planning Committee (PPC): Session #70 WG Opening Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE.
Project Planning Committee (PPC): Next revision project
Session # Maintenance Task Group Opening and Agenda
MM RG Report Document Number: IEEE C802.16n-11/0083 Date Submitted:
ITU-R Liaison Group Report - Session #75 Opening Plenary
Emergency Service – NS/EP Vs E-911 for IEEE m
Session # NRR Committee Closing Report
Session # Maintenance Task Group Opening Slides
ITU-R Liaison Group Report - Session #73 Opening Plenary
Opening report of Connection Management and QoS DG
Project Planning Committee Closing Report (Session #76)
Project Planning Committee (PPC): Report
IEEE Presentation Submission Template (Rev. 9) Document Number:
HO DG Meeting Minutes Document Number: IEEE S802.16m-09/0752
Mesh Topology for Relays
Project Planning Committee Opening Report
UL Control Ad-hoc group discussion summary
IEEE m SDD ToC for Inter RAT Handover
Session # Maintenance Task Group Closing Plenary Report
Project Planning Committee Opening Report (Session #77)
ITU-R Liaison Group Report - Session #62 Opening Plenary
Title: LE TG Closing Report for Session #61
Title: LE TG Agenda for Session #54
Title: LE TG Agenda for Session #53
Title: LE TG Agenda for Session #65
Title: LE TG Agenda for Session #63.5
Suggestion to Retaining ALL 16m Features
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Closing Plenary Report
Resource Shifting in Persistent Scheduling
Session # Maintenance Task Group Closing Report
Session # Maintenance Task Group Opening and Agenda
Session # Maintenance Task Group Opening Report
Session # Maintenance Task Group Opening and Agenda
HARQ Ad-Hoc Report IEEE Presentation Submission Template (Rev. 9)
Overview and definitions adhoc report
Broadcast Handovers Tutorial Overview
Title: LE TG Agenda for Session #66
ITU-R Liaison Group Report - Session #80 Closing Plenary
Session # Maintenance Task Group Closing Plenary Report
ITU-R Liaison Group Report - Session #52 Closing Plenary
IETF 16ng Working Group Update
Session # Maintenance Task Group Opening and Agenda
Session # GRIDMAN SG Opening Report
ITU-R Liaison Group Report - Session #78 Closing Plenary
Frame Structure & Interference adhoc report
Title: LE TG Agenda for Session #60
ITU-R Liaison Group Report - Session #52 Opening Plenary
Title: LE TG Agenda for Session #52
Title: TG LE (P802.16h) Agenda - Session #51
Project Planning Adhoc: WG Opening Plenary Report
Title: LE TG Agenda for Session #64
Network Synchronization Considerations for n
ITU-R Liaison Group Report - Session #61 Opening Plenary
Title: LE TG Agenda for Session #59
Session # NRR Ad Hoc Committee Opening Report
Session # NRR Committee Closing Report
Session # Maintenance Task Group Closing Plenary Report
Treasurer’s Report Document Number: IEEE /0059
Session # NRR Ad Hoc Committee Report
ARQ protocol in m IEEE Presentation Submission Template (Rev. 9)
Presentation transcript:

Project Planning Committee Closing Report (Session #75) IEEE 802.16 Presentation Submission Template (Rev. 9) Document Number: IEEE 802.16ppc-11/0005 Date Submitted: 2011-09-22 Source: Rakesh Taori E-mail: Rakesh.Taori@samsung.com Samsung Electronics Venue: Bangkok, Thailand Base Contribution: None Purpose: Project Planning Report for the WG Closing Plenary Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: <http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>. Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.

PPC Session this week Timeslots this week: Discussion Topic(s): 1 Session: Thursday, 10:30am – 12:00 noon (Lotus Suite #12) Discussion Topic(s): Hierarchical Networks Input Documents/Contributions PPC Ad-hoc report on Hierarchical networks (80216ppc-11_0004) Text proposal for cooperative small base-stations in Hierarchical Networks (C80216ppc-11_0011.doc) Output Modified input-contribution (C80216ppc-11_0011r1.doc) Updated Hierarchical Network Study Report (80216ppc-11_0004r1).

Discussion on ITU-R’s study report on Cognitive Radio Technologies Imata Satoshi (KDDI) volunteered to lead an ad-hoc group that will consider Whether we need to preparing 802.16 WG’s inputs to the ITU-R’s study report. If yes, which section in the ITU-R report we are commenting upon What should be the format of our inputs Imata Satoshi will prepare a PPC contribution to Session #76 (Atlanta) providing A summary of the discussions and Recommendations of the ad-hoc group, if any, regarding submission (which sections, what fomat) of inputs to the ITU-R Study report.

Appendix NOTES FROM THE SESSION

Agenda Presentation of the contribution C80216ppc-11_0011.doc Follow-up on the ITU-R tutorial (Cognitive Radio)

Discussion on the Contribution Problem statement As we move towards small cell deployments, we need a mechanism to connect the small BSs Proposal Wireless connectivity in the Infrastructure Includes the following: Connection between Macro and Small Cell BS, Among Small Cell BSs and Connectivity of the SC BSs to the core/access network. Aspects to consider Signaling for cooperation, Among SC BSs SC BS and Macro Backhauling of data. In-band as well as out-of-band can be considered.

Discussion on the Input contribution Are we talking about In-band or out-of-band? Is the proposal to standardize backhauling? Or just the signaling? What kind of topologies? Mesh, P2P, P2MP among BSs? There are solutions being considered for instance based on 60 GHz (high directionality is a pro, but unlicensed operation is a threat). Other possibility is e-Band (71- 76 nd 81-86 GHz) Unlicensed band in 5GHz Discussions on updates to the proposed text. Inuk to update the Study report with 11r1.

ITU-R Tutorial Follow-up Are the multi-RAT, multi-mode scenarios described in the ITU-R’s CR study report covered in the 802.16 PPC’s Hierarchical Network Study Report? Section 2.2 covers some part (only covers .11) If other RATs are of interest, these could be added. Focus is HO between 3GPP and WiMAX Need to do a gap analysis between what NWG has already addressedand what needs to be added. Preparing inputs for the ITU-R based on the Study Report If useful, how about submitting a contribution to ITU-R? If we decide to go that way, we have to have a major re-haul of the current stud report. Imata-san volunteered to lead a discussion group that would consider the scope of the ITU-R Study report Consider 802.16 WG’s scope Make recommendations on what the possible inputs from 802.16 WG could be