Under supervision of: Eng. Reema Nassar

Slides:



Advertisements
Similar presentations
057 CONSTRUCTION PRODUCTIVITY (MAJOR INFLUENTIAL FACTORS)
Advertisements

Joint Ventures in Construction Firms in Saudi Arabia By Kamal Khalil Khairaddin Abbasi A thesis paper summary Summarized by Mahdi Fida Al-Adel.
F INANCIAL R ISK M ANAGEMENT A FFECTING B UILDING P ROJECTS IN WB, C ONTRACTOR ’ S P ERSPECTIVE Prepared by: Alaa Al-Araj Ahmad Freehat Hazza’a Ammori.
Factors Governing Housing Construction Costs in Saudi Arabia Abdelrahman Al-Gwaiz Kamal Al Dihan Faisal Al Ankary.
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
KFUPM, Department of Construction Engineering and Management CEM 520 LIABILITY ALLOCATION AMONG THE PARTIES TO FIXED-PRICE CONSTRUCTIN CONTRACTS IN SAUDI.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Factors affecting contractors’ risk attitudes in construction projects: Case study from China 박병권.
Genesis Solar Module Brochure ™
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved Business Plug-In B15 Project Management.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Introduction Time Quality Cost Project Constraints Success Introduction.
An-Najah National University Graduating project II Delay in construction projects.
Joint Venture in construction company in West Bank.
Delay In Construction Project In West Bank. Outline:  Background.  Research objective & methods.  Important factors that cause time and cost overrun.
Foundations of Technology.  To familiarize students with the function, applications, and requirements of construction management.
An-Najah National University Faculty of Engineering Industrial Engineering Department Graduation Project 1 Situational assessment for pharmaceutical sector.
Nguyễn Văn Tâm Bsc of Civil Engineering, 1997 (CTU, VN) Lecture notes: TU Delft, Holand Geotextile and Structural Experiment, 2000 Construction equipment.
College of Environment Design Construction Engineering Technology Assessment of Constructability Practice Among General Contractors in The Eastern Province.
So you want to be a… Construction Manager. Construction Manager Plan, direct, coordinate, or budget activities concerned with the construction and maintenance.
OVERHEAD COSTS IN BUILDING CONSTRUCTION IN SAUDI ARABIA Author: Mohammad Al-Shahri (1997) Presented By Fawaz Al-Ghamdi January 1, 2005.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
MY CAREER COMPASS FOR CONTRACTING Derek Stobbart.
ALARA IMPLEMENTATION AT UKRAINIAN NPPs T. Lisova, Nuclear Energy Department, Ministry of Fuel and Energy of Ukraine Y. Roshchyn, National Nuclear Energy.
Planning Planning is considered the most important element of the administrative process. The higher the level of administration, the more the involvement.
BONDING & ACCESS TO CAPITAL SMALL CONTRACTORS INITIATIVE.
PROBLEM SOLVING. Definition The act of defining a problem; determining the cause of the problem; identifying, prioritizing and selecting alternatives.
Cost Overrun in Construction Projects Supervisor : Eng.Reema Nassar.
CRITICAL PATH METHOD - PRECEDENCE DIAGRAMS - SANDEEP DIGAVALLI.
Network analysis Homework:
Job Titles Examples Used for HISD Nonexempt Jobs
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Claims in Construction Projects
Engineering Fundamentals and Problem Solving, 6e
BUSINESS DRIVEN TECHNOLOGY
Procuring Professional Services
Measuring Palestinian Labors Productivity
Maintenance Scheduling
Faculty of Postgraduate Studies and Scientific Research German University in Cairo Modeling to Reduce Variation Order in Construction Projects in Egypt.
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Reality of Highway Construction Equipment in Palestine
{Beir Ziet Secondary Boys School }
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Setting up Enterprise End Next.
Aaker, Kumar, Day Ninth Edition Instructor’s Presentation Slides
Understand the principles of change management
Causes of Contractors’ Failure “ North West Bank” Graduation Project
(Additional materials)
An-Najah National University
PLAN, NETWORK ANALYSIS AND 3D MODELING OF MULTISTORY BUILDING
Construction Project Management
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Construction Project Management
MAINTENANCE PLANNING AND SCHEDULING
9/18/2018 Bids CONTRACTING Khamis…..
Engineering Project Project Management Project Management.
An - Najah national university Civil engineering department
Construction Projects
5th Annual Construction Berkeley Research Group
Reducing Project Duration
Supervisor: Eng. Mohammad abu neama
Network analysis Homework:
ENGINEERING MANAGEMENT (GE 404)
Factors Affecting Bid/No Bid Decision Making IN The West Bank
‘ Causes of Delay During Construction Phase at Palestine ’
An-Najah National University Faculty Of Engineering civil Department
Muskat Secondary School Project
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Under supervision of: Eng. Reema Nassar Factors and problems affecting the determination of construction contract duration in Palestine By Tariq Judeh Ahmad Wardan Saleh Abed Abdallah Jafer Under supervision of: Eng. Reema Nassar

Contents Introduction. Objectives. Research methodology. Data required and data collection. Techniques for determining contract duration. Factors affect the determination of project duration. Problems affecting the duration of construction projects. Questionnaire analysis and results. Discussion. Software guide. Conclusion and Recommendations.

Introduction

Objectives Verify the factors used for the determination contract duration for any project in Palestine. Verify the methods used for the determination contract duration for any project in Palestine. Identify problems related to the contract duration. Suggest solutions for the top ten problems that affect the duration of the projects.

Significance of study Determination of the top ten factors that affect the determination of the contract duration in order to be taken into consideration. Assist owners to deal with the top ten problems that may cause a delay in the project, or can affect the duration of the project by suggest the solutions that help them to override these problems.

Research methodology

Data required Current practice Problems Factors

Data collection Literature review. Questionnaire. Pair wise comparison paper.

Techniques for determining contract duration There are several techniques used to determine construction contract duration: Estimated Cost Method Bar Chart (Gantt chart) Critical Path Method (CPM)

Time reduction techniques There are two commonly techniques used for reducing time overruns: Time Compression of Critical Path Time Crashing Technique

Factors affect the determination of project duration. Limited of the resources and supports Mismanagement of construction project Safety The environmental factor Construction labor productivity Annoyances in residential areas Weather conditions Dependency between activities Time to obtain necessary permits Over time principle

Previous projects Owner Experience Availability of Resources Local regulations & laws Israeli occupation Project management strategies Material price Inflation Project size Project type& design Required Quality of work

Problems affecting the duration of construction projects Resource Restrictions Mismanagement of construction project Weak labor productivity Bad weather conditions Problems in obtain necessary permits Low experience Israeli occupation Complex Project design High risk Missing data Equipment restriction Unsuitable site place

Number Of Municipalities Sample size Number Of Municipalities District 9 Nablus 7 Jinen 11 Tulkarm

Questionnaire analysis and results 96% of municipalities' engineers have a bachelor degree. 71% of the municipalities use the Bar chart method to represent the project planning and scheduling. 63% of the municipalities use Primavera in the determination of project duration.

Top ten factors Weighted score (from 5) Factors Rank 4.0416 Required quality of work 1 3.9583 Project size 2 3.7501 Limited resources 3 3.6667 Project type 4 Project design 5 3.4583 Experience 6 Safety 7 3.3751 The environmental condition 8 3.3333 Israeli occupation 9 Labor productivity rate 10

Top ten problems Weighted score from 5 Problem Rank 4.0833 Not adequate financial support 1 3.9166 Resource restrictions 2 3.4583 Mismanagement of construction project 3 Weak labor productivity 4 Obstacles to Israeli occupation 5 3.3752 Missing data (Design) 6 3.2916 Low experience 7 Complex project design 8 2.9167 High risk 9 2.7501 Bad weather condition 10

Analysis of the pairwise comparison papers Weight Accumulated score Score from the second contractor (expert) (this score from 90) Score from the first contractor (expert) Factors 0.672222 121 54 67 Limited resources 0.6 108 42 66 Required quality of work 0.55 99 63 36 Experience 0.516667 93 43 50 Project type 0.505556 91 55 Labor productivity rate 0.483333 87 44 Israeli occupation 49 38 Project design 0.438889 79 37 Project size 0.422222 76 45 31 Safety 0.327778 59 32 27 The environmental condition

Discussion Top ten factors discussion Top ten problem discussion

Top ten factors discussion Required quality of the work Quality of the work due to the differences in cost and allowable time in construction projects.

Limited resources Resources include the materials, equipments and labors that should be exist in the work place.

Project size Project size The first factor comes to mind before the determination of construction contract duration is the size of the project.

Project design This factor may be increase or decrease the duration.

Project type this factors depends on the past experience and knowledge of the owners in this type of projects.

Experience Experience consists of knowledge of or skill of something or some event gained through involvement in or exposure to that thing or event.

Safety There is a positive relation between the safety on the project with the duration needed to finish the project.

The environmental conditions The environmental factor influence on each project separately.

Israeli occupation Is one of the most important factors that affect the duration of the project. where the Israeli occupation has a high risk on engineering projects.

Labor productivity rate The productivity of the worker is define as the size or the number of units that can be produced during a certain period of time.

Top ten problems discussion Not adequate financial support Financial plan. Look for other sources of funding. Take some loans from banks.

Resource restriction The owners should ask the contractors to deliver the resource profiles for the whole activities before the start of the project.

Mismanagement of construction projects Employing a construction manager for the project to supervise the work of the project. Making a prequalification for the contractors that needed in the project.

Weak labor productivity This problem could be overridden by setting up several supervisors, improve payment process, and applying motivations methods.

Obstacles by Israeli occupation Israeli Occupation is considered as force majeure. It is possible to link it with a contingency plan will help us to predict the effect of the occupation on future projects.

Missing data (Design) Several meetings between owner, contractor and designer assist to discuss and explain the construction project planning. The integration between contractor and designer should be considered to override this problem.

Low experience The owner should have past enough experience and knowledge in this field of work or he can consult a professional expert in this field.

Complex project design The owner must have general courses in the design. The designer can give extra information about the design to be easy to understand. The best solution if the design is complex that is by the search for a professional expert who can understand the design and predict the needed time to implement this design.

High risk Make a contingency plan which means the plan that suggests clear steps to deal with any problem at work and propose solutions that fit these problems.

Bad weather conditions Using special equipments and clothes while working in a bad weather Carefully choose a suitable time of day in a bad weather condition. The allowance time should be considered previously in the plan.

Software guide

Conclusion and recommendations