ALICE 5 o’clock meeting Wk 2 - 2011.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
TC meeting P2 planning wks 7&8 A.Tauro
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
EN-CV interventions during YETS
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
30/10/2008Engineering Forum on Cooling for the LHC Detectors 1 The ALICE water cooling systems A.Tauro.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
(Alice COsmic Ray Detector) Status Report
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
CMS Area Working Group Meeting
ALICE 5 o’clock meeting Wk
ITS Cooling: Xmas Plan Claudio Bortolin.
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
M.Tavlet, H.Taureg - ALICE
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
LHCb & EYETS
November technical stop activities:
Contact
Presentation transcript:

ALICE 5 o’clock meeting Wk 2 - 2011

INDICO You’ll find this meeting here: http://indico.cern.ch/categoryDisplay.py?categId=2957 The full shutdown planning is here: http://indico.cern.ch/conferenceDisplay.py?confId=118265

Access request Cavern and surface You should submit an ADI and a task procedure Attach task procedure Work breakdown structure – risk associated at each step Two persons minimum ADI https://edh.cern.ch/Document/ADI Task procedure Template EDMS 1103355 11/1/11 5 o’clock meeting

ALICE Christmas break schedule Open L3 doors TRD Close Experiment EMCal Open Experiment Close L3 doors 11/1/11 5 o’clock meeting

UX25 access Rules for access restrictions: Removal/installation of shielding (restriction includes RB24 triplets) PX24 blocks: no access CR5 and UX25 PX24 beams (35t): no access CR1-5, Expo, and UX-25 All other blocks: no access to UX-25 LHC evacuation test (7/12 after 18:00 and 24/12) – no access UX25 Gas functional test (10/12 - 2 hrs) – no access UX25 and CR1-5 AUG test (20/1) (Arrêt Urgence General – General Emergency Stop) – no access UX25 DSO test (12-13/1) (Department Safety Officer) – no access UX25 No access SX2 during manipulation of blocks in SX2 (except ACR and WRs) 11/1/11 5 o’clock meeting

L3 (and MNF) access No Ventilation 13 EMCal 3 No Ventilation 24 31 7 EMCal EMCal Evac. No Ventilation Lift Wks 50 and 5: access (TPC) to be coordinated with TC (transport) Wks 1-2: no access during EMCal SMs insertion inside L3 (see day-by-day) When moving from low-beta to yellow platform: no access to MNF When inserting the module: no access L3 and MNF Watcher needed in wk 49 and from wk 4 onwards Wk 6 or 7 (tbd): Kr calibration – TPC T stability (all interventions to be agreed by TC/RC) 11/1/11 5 o’clock meeting

Day-by-day schedule UX25 and MNF - Wk 2

Activities in UX25 - Week 2 - 10/1 Monday VIP visit (Mr Herman Josef Lamberti, Deutschen Bank) 16:50-17:25 Visits: 9:00 University of Frankfurt - 50 persons. Kai Schweda 14:00 Private school, St. Leon, Germany - 30 persons. Kai Schweda Philippe: install PHOS temporary cooling pipes Yannick: re-install TPC cooling pipes MNF (I-side) It H Laser TPC FEC Muon TRG: RPC (PM) TOF TRM TPC cooling SDD/ SSD Install new Ekspla laser Check gas tightness on few RPC detectors, repair 2 gas distribution channels. Replace 1 HV cable (need both nacelles) SDD: calibration of 78 pressure sensors (10-12/1) SSD: replacement CAEN module (C-side) + repair bad temperature signal (C-side) 11/1/11 5 o’clock meeting

PMD: replacement electronics chains Activities in MNF - Week 2 - 10/1 Monday PMD: replacement electronics chains 11/1/11 5 o’clock meeting

Activities in UX25 - Week 2 – 11/1 Tuesday EN-EL: pull control cables L3-Dipole lights – from CR5 to cupboard A-I side Visit (15 people at 14:00). Werner Power cut: 9:05 – 9:45 Philippe + A.Vinogradov: 9:00 switch PHOS cooling on tap water 15:00: stop Ar/H2, C2H2F4, Isobutane, CH4 and SF6 2 tables (DAQ) It H TRP cables Laser TPC FEC Muon TRK: bus-patches Muon TRG: RPC SPD cooling TOF TRM SSD/SDD cooling Use RED nacelle Wash 4 bad sectors + repair heater (nacelle) SSD: removal of cooling pipe from corrosion test setup Move new laser down to platform 11/1/11 5 o’clock meeting

PMD: replacement electronics chains Activities in MNF - Week 2 - 11/1 Tuesday PMD: replacement electronics chains 11/1/11 5 o’clock meeting

Activities in UX25 - Week 2 - 12/1 Wednesday Cooling towers maintenance (start 14:00) (No primary water) SNIFFER maintenance Maintenance UPS EBS106/2X and EBS128/2X (transparent) Lower SM10 onto low beta platform Cleaning rack filters (Philippe) PH-DT: new gas monitoring Visit (P-A.Giudici + 3 persons) Euronews visit 10.20 - 11.30 SM9 It Install EMCal 80deg-C H Laser TPC FEC Muon TRK: bus-patches Muon TRG: RPC EMC Survey TPC cooling SPD cooling SDD/ SSD 11/1/11 5 o’clock meeting

PMD: replacement electronics chains Activities in MNF - Week 2 - 12/1 Wednesday PMD: replacement electronics chains 11/1/11 5 o’clock meeting

Activities in UX25 - Week 2 - 13/1 Thursday Cooling towers maintenance (No primary water) DSS modification. Will stop the full DSS, trigger all interlocks, including stopping power to all racks EN/CV: maintenance SG2 ventilation RAMSES: radiation source tests SNIFFER maintenance Visit: (15 p.) Danish high school class (C. Søgaard) SM10 It H Install EMCal 80deg-A Laser TPC FEC Muon TRK: bus-patches Muon TRG: RPC EMC Survey TRD LV TPC cooling SPD cooling HMPID cooling SDD 11/1/11 5 o’clock meeting

PMD: replacement electronics chains Activities in MNF - Week 2 - 13/1 Thursday PMD: replacement electronics chains 11/1/11 5 o’clock meeting

Activities in UX25 - Week 2 - 14/1 Friday Cooling towers maintenance (No primary water) SNIFFER maintenance RAMSES: radiation source tests Visit (2 people). Resp. L.Pinsky EN/CV: maintenance SG2 ventilation Start pumping out LACS: revision UX25 access doors It Removal EMCal infrastructure H VAC Laser TPC FEC Muon TRK: bus-patches EMC Survey TRD LV EMC Survey SPD cooling SDD SPD cooling 11/1/11 5 o’clock meeting

PMD: replacement electronics chains Activities in MNF - Week 2 - 14/1 Friday PMD: replacement electronics chains 11/1/11 5 o’clock meeting

Activities in UX25 - Week 2 - 15/1 Saturday Cooling towers maintenance (No primary water) It H 11/1/11 5 o’clock meeting

Activities in MNF - Week 2 - 15/1 Saturday 11/1/11 5 o’clock meeting

Activities in UX25 - Week 2 - 16/1 Sunday Cooling towers maintenance (No primary water) D.Budnikov at CERN It H PHOS cooling PHOS: maintenance crystal cooling plant 11/1/11 5 o’clock meeting

Activities in MNF - Week 2 - 16/1 Sunday 11/1/11 5 o’clock meeting

AOB - 11/1/11 5 o’clock meeting