Baby MIND Logistics for Japan

Slides:



Advertisements
Similar presentations
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
Advertisements

EA meeting, Wednesday 6 Dec 2006 TT installation, Jeroen van Tilburg 1 TT installation Installation of the TT station.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
PHENIX UPGRADE Stony Brook Project Hadron Blind Detector Glove Box 31Aug05.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
IMPACTS OF INSTALLING THE REFERENCE MAGNET PLACEMENT IN B december 2014 Fulvio Boattini & Natacha Lopez Hernandez.
Transport and handling at CERN for FAIR
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
Transport of the CLIC Modules and Elements CLIC Workshop October 2007 Two Beam Hardware and Integration Working Group Keith Kershaw (CERN)
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
CLIC MODULE TRANSPORT AND INSTALLATION Keith Kershaw CES, 8 October 2008.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Mnemonics Using letters to make up phrases that help you remember.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Insulating Glass Manufacturing Quality Procedure Manual TM (07)
Planning for Proto-DUNE PD Installation and Cabling at CERN
IBBelle: Status & Plans
Installation of the T600 at Fermilab
Baby MIND Transport to Japan
MICE CM28 Engineering Session Summary (On behalf of Wing)
Schedule CM SPS G.Vandoni.
Service channels between Tracker and PP1
SBN Far Detector Installation & Integration
Service channels between Tracker and PP1
Escalator Installation
CSP 25th November 2010 Technical agreement number 3: overview
E. Noah, A. Blondel, P. Benoit, F. Cadoux, A. Dudarev, L. Nicola, H
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Status of the Mechanics at Ciemat.
CMS Area Working Group Meeting
CE Status: Activities executed until 03/08 and ongoing
Baby MIND Transport to Japan
Preparing Baby MIND for Japan
Baby MIND Status on T9 E. Noah 6th July 2017.
SR1 cleanroom extension
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
Baby-MIND for T2K collaboration
Extension SR1 WP3 Electrical installations
Senior Year Scheduling October 17, 2017 Laura Hopkins
IBBelle: Status Commissioning at MPP Transport to KEK
A Class Calendar in PowerPoint
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
13-block rotation schedule
Weekly Sight Words List 13.
Shipping and Transport College Rotterdam
Release 3 Scope & Proposed Plan
JANUARY 2018 SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
January 2015 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
| January Sunday Monday Tuesday Wednesday Thursday Friday
New EU Regulation on General Safety Implementation of Tyre Aspects
Bunker Project Schedule/Budget
Annex A1.6.2b RU access to OBI RNE General Assembly 16 May 2018.
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Quick start guide MS110 SHIPPING/Set Up/ Operation REQUIREMENTS
January Monday Tuesday Wednesday Thursday Friday Saturday Sunday 30 31
2015 January February March April May June July August September
Specials Calendar Time Day 1 Day 2 Day 3 Day 4 Day 5 Day 6
Presentation transcript:

Baby MIND Logistics for Japan E. Noah 15th November 2017

Rough schedule SaRoMaN workshop: 6th December Collaboration meeting: 7th to 8th December 2017 10th December: ETA Tokyo 11th December: Customs clearance 12th December: Buffer day/Etam+Laurent J-PARC safety course 13th-14th December: Offloading and storage in NA building 2018 8th-22nd January: Installation phase I 12th-25th February: Installation phase II March: Installation phase III End March: T2K beam switched ON April-May: T2K beam running June: T2K beam OFF 2019 T2K beam back ON Transport & storage Installation & systems integration Commissioning Operation

Transport

Packaging: see with Ordem SA. Some recommendations brought up during 12th September discussions Containers: Same container from CERN to J-PARC. Chassis must be properly anchored to container, so it does not move inside during shipment. Shipping: request “under deck”, ensure one single ship from Europe to Japan. Loading: Packaging: see with Ordem SA. Ensure the fragile connectors at the top of the scintillator modules are well protected. Ensure humidity is kept at minimum Vacuum packing might be possible Wood to block chassis against container walls Monitoring: Contact EN department to get hold of temperature, humidity and shock sensors Japan phase: Japanese contact person (or KEK, J-PARC?) in charge of transport phase in Japan. Person that will: manage documentation for customs clearance, communicate with customs and transport companies in Japan rental of crane truck for offloading at J-PARC.

Document for agreement on transport to J-PARC

Transport support frames: Dimensions 4 large transport support frames (referred to as chassis): designed to transport several magnet and scintillator modules, weighing between 18 and 20 tonnes per chassis Allowed floor load in transport container: as given in Hapag-Lloyd document: (assume 1 axle = 2 wheels) (5460 kg/2)/142cm2=19.23 kg/cm2 Measured chassis dimensions Maximum dimensions measured at feet level (widest surface of blocks)… Length [mm] Width [mm] Height [mm] Weight [ton] # Feet Feet area [cm2] [Kg/cm2] Chassis #1 3925 2150 2260 20 8 5000 4 Chassis #2 3835 1160 18 6 3250 5.54 Chassis #3 1080 Chassis #4 1520

Other hardware Other hardware: 2 palettes with cable bundles: approx. 1 tonne. To be transported with chassis Electronics, 9 minicrates: not heavy, but fragile. To be transported by air DAQ PCs (2 to 4) To be transported by air B2 support frames for installation at J-PARC: B2 floor, ND280 pit. approx. 10 tonnes To be transported by air, but separate shipment probably

Container 1- ref: QNNU 123717 Container 2- ref: QNNU 123580 Container references Container 1- ref: QNNU 123717 Chassis 1: 23 Tonnes Container 2- ref: QNNU 123580 Chassis 2: 21 tonnes,Palette: 3 boxes of tools 24 boxes of cable bundles # 2,3,4,5,6,16,17,18 2 pairs of stands for magnet assembly Container 3- ref QNNU 123483 Chassis 3: 21 tonnes,Palette: 12 boxes of cable bundles # 1,7,10,15 2 boxes of magnet power supply 1 box with cable for power supply 1 switch plate Container 4- ref QNNU 124373 Chassis 4: 21 tonnes,Palette: 18 boxes of cable bundles # 8,9,11,12,13,14 1 tool box

No transshipment until Tokyo! GENEVA www.marinetraffic.com Port Said: EGYPT 15/11/2017 21:00 ROTTERDAM 2 4 3 Ship can stop in up to 10 seaports along the way for typically 24-48hrs per stop 1 No transshipment until Tokyo! 4.a) Offload from ship to storage dock at seaport 4.b) Temporary storage Tokyo 4.c) Customs clearance at seaport 4.d) Load onto lorry at seaport 4.e) Offload from lorry at J-PARC (special crane truck required) 4.f) Storage at J-PARC: special weather resistant covers required outdoors, is it enough? Indoors best. GENEVA 2.a) Offload container from lorry to temp. storage BASEL 2.b) Temporary storage BASEL 2.c) Load from temporary storage BASEL to barge 2.d) Offload container from barge Rotterdam 2.e) Temporary storage Rotterdam 3.a) Load from temporary storage Rotterdam to SHIP 3.b) Direct ship Rotterdam to Yokohama/tokyo (no change of ship) 3.c) How many stops for stage 3? Where? Temperature issue? 1.a) Load chassis into container, 1.b) Load container onto lorry Crane in bldg 180 Stage 1: road/truck From: Geneva (CH) To: Basel (CH) Stage 2: rhine/barge From: Basel (CH) To: seaport Rotterdam (NL) Stage 3: ship via Suez From: seaport Rotterdam (NL) To: seaport Tokyo (JP) Stage 4: road/truck From: Tokyo (JP) To: Tokai (JP)

Offloading/Storage Photo: loading at CERN

Chassis placed in temporary storage (indoors possible NA building) When at J-PARC: Offloading at J-PARC and handling empty containers Communication between Japanese contact, DBSchenker and CERN logistics to ensure arrival date/time of lorries at J-PARC is known in advance. Ichikawa-san to rent a crane truck for the offloading operations at J- PARC. Container lifted off lorry Chassis lifted out of container Empty container put back on lorry Chassis placed in temporary storage (indoors possible NA building)

Temporary storage: Ichikawa-san made request to ND280 run coordinators for storage in NA building; approved 14th November ND280 building NA building

Installation

Test experiment proposal submitted 14th November 2017 Spokesperson: Alain Blondel This is not a detailed plan for installation…

Floor plan on B2 floor OK for Minamino-san

Other

Some general questions: answered during 12th September meeting What is scope for DBSchenker to work with a transport company in Japan for stage 4, i.e. sub-contract a transport company in Japan? We ideally want one single transport contract from CERN in Geneva to final destination J-PARC in Japan Answer: this is OK, DBSchenker Japan office can handle this, either directly or with sub-contracted company. What type of containers/transport structure? 20’ Hardtop or 20’ flatrack? Answer: 20’ Open top What are limitations in terms of maximum admissible load per linear meter in the container? Answer: It is OK. Admissible load defined by fork lift truck with axle weight of 5460 kg, with a contact area per wheel of 142 cm2, i.e. 19.23 kg/cm2 (c.f. Baby MIND max. 5.54 kg/cm2. Temperature and humidity? What is the temperature profile likely to be during stages 1,2,3,4? Is it possible to specify less than 40oC? Answer: Can ask for the containers to be placed “under deck” but there is no guarantee, it is up to the ship captain to decide. Ask EN department for shock and temperature sensors. What timeline to organise transport? Quotation, contract? Pick-up from CERN at the end of October? Answer: CERN logistics prefer a planning with arrival at J-Parc at the beginning December 2017 (Stephanie suggestion)! Take 50 days for the shipment in total, this means the chassis must leave CERN beginning October. Can we have a container delivered to CERN for ~1 week to do some handling tests? Beginning October Answer: can be confident the objects can be loaded into the chassis based on the published container dimensions, so no need for special handling trials.

To do list: after 12th September meeting Organise meeting with DBSchenker and Ordem SA to view the hardware in building 180 ASAP (Week 38) - DONE Get definitive quotes DONE: from DBSchenker from Ordem SA Plan a schedule with pick-up beginning October (for arrival J-Parc beginning December) Want to avoid shipping in winter close to Christmas closure. DONE Start working on customs clearance documentation status of Baby MIND for customs? STARTED Understand how to get green light from Japan for transport within next 2-3 weeks. Can we get such a green light before the ”Baby MIND test and commissioning” proposal is approved at J-PARC. DONE – Green light given on Friday 29th September 2017 Could not do Friday 6th and Monday 9th October at CERN, packaging company not ready!! Loading Tuesday 17th and Wednesday 18th October at CERN