Nominated by Miller Heights Neighborhood Association Justification: 01 Access – removes cycling obstacle 02 Safety – reduce pedestian leaps 03 Environment – stops erosion from pedestrians and dogs scrambling across Costs: None to taxpayer. No fundraising, Eagle candidate’s parents will pay cost of materials and thank-you lunch for participating Scouts Proposed Build Date: 2 May 2015 (Saturday) FAIRFAX COUNTY PARK AUTHORITY: Name: Todd Johnson Signature: Date:
Life Scout: Chris Nesbitt APPROXIMATE CCT 11200 Sorrell Ridge, Oakton VA 22124 11012 Blenheim Drive, Oakton VA 22124 Life Scout: Chris Nesbitt Email: cbn100@gmail.com Planned Installation: Saturday, 2 May 2015 Park Authority Approval: Mr. Todd Johnson Email: todd.johnson@fairfaxcounty.gov Eagle Advisor: Email:
Battery-operated drill (2) Gas chain saw 11200 Sorrell Ridge, Oakton VA 22124 APPROXIMATE CCT 11012 Blenheim Drive, Oakton VA 22124 Materials & Tools: Materials on next page Pre-cut in garage Shovels (2) Battery-operated drill (2) Gas chain saw Plan of the Day (Entry Point Permission Secured First): 0900 Assemble/Park at Miller Heights & Miller Road 0930 Walk to meet truck at 11012 Blenheim Drive Hand-carry all materials & equipment to work site Build bridge, bury ends, clear trail (3 obstacles) 1200 Walk to trail exit at Miller Heights & Miller Road
2” deck screws affix planking 3” deck screws assemble foundation 28 surface planks, each 1” x 6” x 2’ (chalk line in pre-assembly for pre-drilling guide holes) 2” deck screws affix planking 3” deck screws assemble foundation 14’ 2” x 10” x 14’ foundation 6’ 2’ 18’ 2’ x .5” rebar anti-flood brace (4) All wood pressure-treated. Each end of bridge sunk in level to path, 2’ in each side. 1’ 9” NOTE: This is a Class 1 footbridge, of short length, in a rural area with very limited foot traffic. By limiting the bridge to 2’ in width, we automatically limit pedestrians to single file. Horses will continue to use existing crossings without a footbridge. Height is under 4’ no handrail required.