Chapter 17 Project Management McGraw-Hill/Irwin
Advertisements

F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
CHAPTER 17 Project Management.
pert and cpm ch 9 Learning objectives:
1 Project Scheduling CP - Chapter 10 Lecture 3. 2 Project Management  How is it different?  Limited time frame  Narrow focus, specific objectives 
Project Scheduling Prof. Jiang Zhibin Dept. of IE, SJTU.
18-1Project Management Chapter 18 Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Operations Management
1 Project Management Inventory Management – In-class Example  Number 2 pencils at the campus book-store are sold at a fairly steady rate of 60 per week.
PROJECT MANAGEMENT PART SIX Chapter Eighteen Project Management.
© 2000 by Prentice-Hall Inc Russell/Taylor Oper Mgt 3/e Chapter 6 Project Management.
Lecture 4 Project Management Chapter 17.
Chapter 13: Quantitatve Methods in Health Care Management Yasar A. Ozcan 1 Chapter 13. Project Management Time in Weeks Activities
Project Management Chapter 17.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Project Management. Projects „Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.”
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management. Learning Objectives  Discuss the behavioral aspects of projects in terms of project personnel and the project manager.  Discuss.
Project Management Chapter Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame. Build A A.
1 Project Management Chapter Lecture outline Project planning Project scheduling Project control CPM/PERT Project crashing and time-cost trade-off.
Operations Management
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 17 Project Management Part.
© Stevenson, McGraw Hill, Assoc. Prof. Sami Fethi, EMU, All Right Reserved. Project management; Chapter7 MGMT 405, POM, 2010/11. Lec Notes Chapter.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Management (專案管理)
Project Management Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
© Stevenson, McGraw Hill, Assoc. Prof. Sami Fethi, EMU, All Right Reserved. Project management; Chapter 5 MGMT 405, POM, 2012/13. Lec Notes Chapter.
2 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Project Management 2 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
8-1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Management Chapter 8.
Project Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 17 Project Management.
Project Planning and Budgeting Recall the four stages Project Definition and Conceptualization Project Planning and Budgeting Project Execution and Control.
Project Management McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER EIGHTEEN Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
(M) Chapter 12 MANGT 662 (A): Procurement, Logistics and Supply Chain Design Purchasing and Supply Chain Analysis (1/2)
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
18-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
17 Project Management Homework; 1b, 4b, 5b, Sup1, Sup2.
Beni Asllani University of Tennessee at Chattanooga
Chapter 16 – Project Management
Chapter 5: Project Management
Project Management Chapter 8.
Project Management.
Chapter 3 Project Management. Chapter 3 Project Management.
PROJECT MANAGEMENT.
Project Management (專案管理)
Project Management Chapter Topics
Project Management: PERT/CPM
Chapter 17 Project Management McGraw-Hill/Irwin
Project Planning & Scheduling
Project Management (PERT/CPM) PREPARED BY CH. AVINASH
PART SIX PROJECT MANAGEMENT Chapter Eighteen Project Management.
Project Planning & Scheduling
Chapter 5: Project Management
Chapter 6: Project Time Management
17 Project Management.
Project Planning and Budgeting
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Stevenson 17 Project Management.
Chapter 3 Project Management.
Project Management Chapter 17
Chapter 16 – Project Management
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Presentation transcript:

17 Project Management

Learning Objectives Discuss the behavioral aspects of projects in terms of project personnel and the project manager. Discuss the nature and importance of a work breakdown structure in project management. Give a general description of PERT/CPM techniques. Construct simple network diagrams.

Learning Objectives List the kinds of information that a PERT or CPM analysis can provide. Analyze networks with deterministic times. Analyze networks with probabilistic times. Describe activity “crashing” and solve typical problems.

Projects Build A A Done Build B B Done Build C C Done Build D Ship JAN FEB MAR APR MAY JUN On time! Unique, one-time operations designed to accomplish a specific set of objectives in a limited time frame.

Project Management How is it different? Why is it used? Limited time frame Narrow focus, specific objectives Less bureaucratic Why is it used? Special needs Pressures for new or improves products or services

Project Management What are the Key Metrics Time Cost Performance objectives What are the Key Success Factors? Top-down commitment Having a capable project manager Having time to plan Careful tracking and control Good communications

Project Management What are the Major Administrative Issues? Executive responsibilities Project selection Project manager selection Organizational structure Organizational alternatives Manage within functional unit Assign a coordinator Use a matrix organization with a project leader

Project Management What are the tools? Work breakdown structure Network diagram Gantt charts Risk management

Planning and Scheduling MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Locate new facilities Interview staff Hire and train staff Select and order furniture Remodel and install phones Move in/startup Gantt Chart

Key Decisions Deciding which projects to implement Selecting a project manager Selecting a project team Planning and designing the project Managing and controlling project resources Deciding if and when a project should be terminated

Project Manager Responsible for: Work Quality Human Resources Time Communications Costs

Ethical Issues Temptation to understate costs Withhold information Misleading status reports Falsifying records Comprising workers’ safety Approving substandard work

Project Life Cycle Concept Feasibility Planning Execution Termination Management

Work Breakdown Structure Figure 17.2 Project X Level 1 Level 2 Level 3 Level 4

PERT and CPM PERT: Program Evaluation and Review Technique CPM: Critical Path Method Graphically displays project activities Estimates how long the project will take Indicates most critical activities Show where delays will not affect project

The Network Diagram Network (precedence) diagram – diagram of project activities that shows sequential relationships by the use of arrows and nodes. Activity-on-arrow (AOA) – a network diagram convention in which arrows designate activities. Activity-on-node (AON) – a network diagram convention in which nodes designate activities. Activities – steps in the project that consume resources and/or time. Events – the starting and finishing of activities, designated by nodes in the AOA convention.

The Network Diagram (cont’d) Path Sequence of activities that leads from the starting node to the finishing node Critical path The longest path; determines expected project duration Critical activities Activities on the critical path Slack Allowable slippage for path; the difference the length of path and the length of critical path

Project Network – Activity on Arrow Figure 17.4 1 2 3 4 5 6 Locate facilities Order furniture Furniture setup Interview Hire and train Remodel Move in AOA

Project Network – Activity on Node Figure 17.4 1 2 3 5 6 Locate facilities Order furniture Furniture setup Interview Remodel Move in 4 Hire and train 7 S AON

Network Conventions a b c d Dummy activity

Time Estimates Deterministic Probabilistic Time estimates that are fairly certain Probabilistic Estimates of times that allow for variation

Example 1 Figure 17.5 1 2 3 4 5 6 Deterministic time estimates 6 weeks Locate facilities Order furniture Furniture setup Interview Hire and train Remodel Move in Deterministic time estimates

Example 1 Solution Critical Path

Computing Algorithm Network activities Used to determine ES: early start EF: early finish LS: late start LF: late finish Used to determine Expected project duration Slack time Critical path

Probabilistic Time Estimates Optimistic time Time required under optimal conditions Pessimistic time Time required under worst conditions Most likely time Most probable length of time that will be required

Probabilistic Estimates Figure 17.8 Beta Distribution Activity start Optimistic time Most likely time (mode) Pessimistic time to tp tm te

Expected Time te = to + 4tm +tp 6 te = expected time to = optimistic time tm = most likely time tp = pessimistic time

Variance (tp – to)2 2 = 36 2 = variance to = optimistic time 2 = (tp – to)2 36 2 = variance to = optimistic time tp = pessimistic time

Example 5 1-3-4 a 3-4-5 d 3-5-7 e 5-7-9 f 2-4-6 b 4-6-8 h 2-3-6 g 3-4-6 i 2-3-5 c Optimistic time Most likely Pessimistic

Example 5 Time Estimates Tabc = 10.0 Tdef = 16.0 Tghi = 13.50 2.83 a 4.00 d 5.0 e 7.0 f b 6.0 h 3.33 g 4.17 i 3.17 c

Path Probabilities Z = Specified time – Path mean Path standard deviation Z indicates how many standard deviations of the path distribution the specified tine is beyond the expected path duration.

Example 6 17 Weeks 10.0 16.0 13.5 1.00 a-b-c d-e-f g-h-i

Time-cost Trade-offs: Crashing Crash – shortening activity duration Procedure for crashing Crash the project one period at a time Only an activity on the critical path Crash the least expensive activity Multiple critical paths: find the sum of crashing the least expensive activity on each critical path

Time-Cost Trade-Offs: Crashing Figure 17.11 Total cost Shorten Cumulative cost of crashing Expected indirect costs Optimum CRASH

Example 7 6 a 4 d 5 c 10 b 9 e 2 f

Advantages of PERT Forces managers to organize Provides graphic display of activities Identifies Critical activities Slack activities 1 2 3 4 5 6

Limitations of PERT Important activities may be omitted Precedence relationships may not be correct Estimates may include a fudge factor May focus solely on critical path 1 2 3 4 5 6 142 weeks

Goldratt’s Critical Chain Goldratt’s insight on project management Time estimates are often pessimistic Activities finished ahead of schedule often go unreported With multiple projects, resources needed for one project may be in use on another

Project Management Software Computer aided design (CAD) Groupware (Lotus Notes) CA Super Project Harvard Total Manager MS Project Sure Track Project Manager Time Line

Advantages of PM Software Imposes a methodology Provides logical planning structure Enhances team communication Flag constraint violations Automatic report formats Multiple levels of reports Enables what-if scenarios Generates various chart types

Project Risk Management Risk: occurrence of events that have undesirable consequences Delays Increased costs Inability to meet specifications Project termination

Risk Management Identify potential risks Analyze and assess risks Work to minimize occurrence of risk Establish contingency plans

Summary Projects are a unique set of activities Projects go through life cycles PERT and CPM are two common techniques Network diagrams Project management software available