Monday 14th March Second fill with pilot + 3 nominal bunches

Slides:



Advertisements
Similar presentations
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Ion Commissioning: Thursday & Friday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
LHC commissioning Week 38
LHC Injection and Dump Protection
Lost at 12:05 to power converter (RTQX2.R1) problem
Wed :40 Lost S78 - QPS controller.
Thursday 10th May - morning
LHC Status Sun Morning 20-Mai
Week 35 – Technical Stop and Restart
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Programme for Saturday 10 July
Summary Thursday h21: Stable beams fill #1303.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Summary for LPC (March 7th, Ralph Assmann)
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Thursday 30th September De-bunching test
Thursday
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Daniel, Gianluca and Belen (for the Collimator team)
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Tuesday
Presentation transcript:

Monday 14th March Second fill with pilot + 3 nominal bunches Some debunched beam for beam 2? But losses on FBCT, would expect this on DC-BCT?? Stable beams 10:40 – 16:00 15/03/2011 LHC 8:30 meeting

End of fill studies @ 3.5 TeV collisions Betatron loss maps B2 H & V First impression ok “Asynch dump” test B2 The ratio of losses on the TCTs/cold elements to TCDQA was 3e-4 for B1, and 4e-4 for B2, assuming a filter factor of 60 on the TCDQA BLM.  This is fine (BG). FMCM tests by generating an FGC_STATE fault in the related power converters Analysis off-line Automatic BLM-BIS test All tests passed ok 15/03/2011 LHC 8:30 meeting

Abort gap monitoring BSRA “Asynch Dump” test Image at dump BTVDD Abort gap monitoring BSRA FBCT BSRA BLMs 15/03/2011 LHC 8:30 meeting

Multi-bunch injection test – injected 48 bunches Adjusted MKE delay for both beams (68 us Beam 1, 54 us Beam 2) with pilot bunch and settings copied to LHCFAST1-3 and LHC1-4 ==> ready for injecting trains of multi-bunches Checked injection of the following sequences: Probe + 8 b adding on to 32 bunches total per ring         - Probe + 2 x 8 b adding on to 48 bunches total per ring         - Probe + 1 x 8 b + 3 x 8 b adding on to 56 bunches total per ring               - Probe + 1 x 8 b + 1 x 24 b adding on to 56 bunches total per ring         - Probe + 1 x8 b + 2 x 24 b adding on to 56 bunches total per ring Clean injection for beam 1 after correcting hor. and vert. trajectory on LHC3; no correction needed on Beam 2. IQC latching for both beams when injecting 48 bunches for BLM and RF bucket (see attachment), and losses at MQ7 (fixed BLM display) at 30% from dump limit when injecting 48 b for B2. Extrapolation from 48 b: - B1: ratio to dump 20% - B2: ratio to dump 30% Next step will be more statistic with 48 b using the intensity increase check list and then moving on to the injection of 96 b (4 x 24 b). M.Meddahi, C.Bracco 15/03/2011 LHC 8:30 meeting

Third fill stable beams 3 bunches 02:00 Stable Beams fill #1617 RF-feedback during squeeze ‘monitoring’ If ok can be switched on on next fill 05:00 Self trigger Beam Dump on B2 MKD generator M Seems to be problem at the level of slow control To be checked in detail During ramp down fault RB78, probably caused by active filter. Opened switches. Seems ok, but also to be checked in detail 15/03/2011 LHC 8:30 meeting

Plan Tuesday morning MPS tests: BIS, XPOC/IPOC Another ramp and squeeze with 3 or 8 bunches with RF feedback and tune feedback on during the squeeze Stable beams with 32 bunches If all above goes well If rMPP ok 15/03/2011 LHC 8:30 meeting