Calorimeter Upgrade Session : News

Slides:



Advertisements
Similar presentations
LAPP electronics developments Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC WS 12-16/10/2009.
Advertisements

LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
WAO 2007 Andrej Košiček Dealing with the Obsolescence in state-of- the-art Electronic Components 27 September 2007.
R&D on pixel sensors at ILC ILC Workshop - November 2006 – Valencia.
GEM Electronic System Status New releases of electronic boards: ◦ MPD v 4.0 ◦ Backplane 5 slot short (for UVa design) ◦ APV Front-End with Panasonic connector.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
B. IlleWACH /11/20021 WELCOME to WACH I am happy to introduce this ‘Workshop Analysis Calorimetry H4’ dedicated to M0’ data analysis and the.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Proposal for participation in Si-PM testing and Upgrade work HEP Group Department of Physics Panjab University Chandigarh M. India-CMS meeting,
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
Intervention for Chronic and Emergency Exposure Situations Assessment and Response during Nuclear Emergency Protective Action Decision Making for Severe.
303LON and 308LON Project Updates – Individual Presentations Unit: 9.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
IND137 Team Concepts & Problem Solving Scenario Introduction.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
LAPP BI Read-out electronics Jean Jacquemier, Yannis Karyotakis, Jean-Marc Nappa,, Jean Tassan, Sébastien Vilalte. CLIC BI WS 02-03/06/2009.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
LHCb – Calo Upgrade Meeting – 20th October 2013 – CERN Upgrade Calo FE Review Comments: Analog D. Gascon for the LHCb calo group Universitat de Barcelona.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
CALO News Pascal Perret LPC Clermont 23 October 2011.
For discussion… Adachi. Horizontal effort Horizontal effort: one example – All of the proposed barrel PID detector use quartz bar radiator – Possible.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
Summary of the Barcelona Meeting March 10 th and 11 st, 2009 Calorimeter Upgrade Meeting Frédéric Machefert On behalf of the Barcelona and Orsay Groups.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
Work on Muon System TDR - in progress Word -> Latex ?
News and Introduction from CERN June 15th, 2005
Irradiation test of Commercial (BASLER) digital cameras
LIU Wire Scanner Milestones June 2017
Introduction LOI Hardware activities and GBT Simulations
Update on CSC Endcap Muon Port Card
EC Activities Status for the LIU
CMS November Upgrade Week
SCLS All Director’s Meeting July 27, 2011
European Detector R&D: AIDA
NA61 news and plans News from other labs/experiments
AMMS-WG BE-BI and PPE 9/12/2018.
Calorimeter Upgrade Meeting - News
LHCb Calorimeter upgrade
Calorimeter upgrade meeting
CMS Goal of the experiment
Assembly order PCB design
L1Calo Joint Meeting Introduction
BLM planning 24/02/2014.
Tests Front-end card Status
BEAM LOSS MONITORS The BLM system Status of the monitors
Overview of the LHCb Calorimeter Electronics … focus in the ECAL/HCAL
Lehman 2000 Project Timeline
Green Your schedule for today!
LS1 status 17/03/2014.
AIDA Asic Heatsinks Prototype received, and approved.
ELA, 3/9/18.
Adults, Health and Housing DPEG – ‘Policy Co-Production’
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Calorimeter Upgrade Session : News One Calorimeter Electronics meeting (2 days) every 1 ½ month Already two meetings in Barcelona and one in Orsay Minutes of the meetings are available from the agendas Prototyping level But last Calorimeter Upgrade session was in March Today → good opportunity to show to the calorimeter group the problems, solutions, path followed concerning the electronics An introduction by Jacques and two “mini-reviews” Carlos/Edu → analog electronics Olivier → digital electronics Sept 09th, 09 Calorimeter Upgrade Session

Calorimeter Upgrade Session : News MC studies to decide on usefulness of SPD/PS → Hugo We know that VFE should be OK for upgrade No information on feasibility : 64 channel board possibility, cost estimate … Volunteers ? Calorimeter Modules Irradiation → good progress on this side Rustem will report on Module calibration and Installation in the LHC tunnel An EDMS note was written (draft) → EDMS 1014963 A request for R&D was sent to the russian manufacturer of PbWO4 (Sheldon- Andrei) No outcome yet, but company looks in a delicate situation We had a meeting on FPGA radiation tolerance A group (Syracuse) expressed its interest in performing studies on that subject But our candidates are known APA3 (and AX) and are supposed to be ok We should be able to put our prototypes in particle beams Sept 09th, 09 Calorimeter Upgrade Session