English for Construction Engineering Management,建筑工程专业英语

Slides:



Advertisements
Similar presentations
CONTRACT PAYMENTS & VARIATIONS
Advertisements

广东省省级精品课程《国际贸易》 Chapter 2 Basic Classification of Foreign Trade and Statistics Index 广东外语外贸大学国际经贸学院 卢立岩 副教授 School of International Trade and Economics,
Contract Law 2014 NCHCA Education Series- January 23, 2014 Presented by Geoffrey Cantello, City of Ottawa and Ron Price, Rasmussen Starr Ruddy LLP.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Time for a new standard - AS General Conditions of Contract
四、 建筑安装工程费用构成 四 清单建筑安装工程费用构成 (一)、 建筑安装工程费用的构成 1 、直接费 ( 1 )、直接工程费 ( 2 )、措施费 2 、间接费 ( 1 )、规费 ( 2 )、企业管理费 3 、利润 4 、税金 ( 1 )、营业税 ( 2 )、城市维护建设税 ( 3 )、教育费附加.
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
Contract price & payment
Valuations and interim certificates. Purpose Value the works taking account of: – the physical work done on site; – any extra work ordered by the client;
2.A. Budgeting and Payment Procedures for All other Types of Contracts
人教 PEP 六年级上册英语 singer singer actor actor.
CONSTRUCTION CONTRACTS DOCUEMENTS
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
教材版本: (新上海版)小学牛津英语 教学内容: 三年级上册 Unit 10 Numbers 授课教师:安徽省黄山市屯溪区东城实验小学 程倩 教材版本: (新上海版)小学牛津英语 教学内容: 三年级上册 Unit 10 Numbers 授课教师:安徽省黄山市屯溪区东城实验小学 程倩.
Start Typical student project Advanced student project Level of final response.
广东省省级精品课程《国际贸易》 Chapter 2 Basic Classification of Foreign Trade and Statistics Index 广东省省级精品课程《国际贸易》 Chapter 2 Basic Classification of Foreign Trade and.
1 中央大學營管所學分班 工程契約與文件管理 CHAPTER 16 TEST AFTER COMPLETION Silver Book, 2002 Clause 12. 授課教授 : 謝定亞 博士 學員 : 陳忠正 ( 研發中心管線組 )
Big Data 刘鹏 管理学博士 / 教授 上海财经大学信息管理与工程学院 Data Mining with WEKA.
LECTURE 5 FORMULATION & PRESENTATION OF OTHER CLAIMS
FIDIC guidelines for EPC / Turn Key System of Contracting
酒店管理专业介绍. 搜索: 前途是啥 …… 我想西装革履,我 想风度翩翩 …… 我想日不晒雨不淋, 我想优雅大方 …… 小叮当帮我实现所有的愿望 ……
Introduction of Chinese Language Courses, Arrangement and Requirement Department of Teaching Chinese as Second Language 对外汉语教学系.
Final Accounts. Accounts Submissions Last Bill for Contracted Works ( excluding Retention) Presented at Practical Completion Practical Definition dependant.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
April 29, 2014 WELCOME!. Tips & Tricks Interface & View.
UNIVERSITY OF PALESTINE FACULTY OF APPLIED ENGINEERING & URBAN PLANNING CIVIL ENGINEERING DEPARTMENT ENGINEERING PROJECT MANAGEMENT CHAPTER 3 INTRODUCTION.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
EFCA Annual Conference 2016, 02–04 June 2016, Sofia, Bulgaria Application of FIDIC CC for EU- Funded Projects in Bulgaria Assen Antov Transport Engineer.
DEALING WITH VARIATIONS E.M.M.B. EKANAYAKE BSc(Hons)QS, MRICS, MCIArb, MAACEI (Chartered Quantity Surveyor & Claims/Contracts Specialist) by Under FIDIC.
Insurance in Construction
Mike Ellis Executive Director – Property + Projects
Introduction to FIDIC - Manuals
Technical Specifications & Employer's Requirements
Administration of a FIDIC Contract - Project Control
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Works Contract under GST
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Works Contract under GST
Particular Conditions of Contract & Appendix to Tender
Administration of a FIDIC Contract - Pre-Contract Phase -
Financial Clauses and Procedures.
Drawings Introduction to FIDIC - Drawings -.
Administration of a FIDIC Contract - Financial Management
Evaluation Grids Evaluation Grids.
Money and Banking and Financial Markets 货币金融学 任课教师 杨荣
Contractor’s Post-contract Cost Management Processes
DTF CONSTRUCTION MONITORING
Lesson 1 Introduction To Accounting Section 1 what is Accounting
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Safety Responsibilities
Particular Conditions of Contract & Appendix to Tender
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
TOPIC-7- PROJECT CASH FLOW
University of Calgary Continuing Education
Certificates JCT 11 SBC allows for 10 different kinds of certificates.
بسم الله الرحمن الرحيم Tests on Completion Dr. Kamaleen Sha’ath
Contractual Arrangement
THE EMPLOYER Right, of access to the site.
ARCH 435 PROJECT MANAGEMENT
Dennis Li - HKCIC Lecturer
Public works contract Clauses 10.5 & 11.5 Explored
通信工程专业英语(本) Lesson 15 How to Draw Schematic Diagrams 第15课 如何绘制原理图
Construction Contract Administration
Building Order Cash-Flow Management, Invoicing
英国伯明翰大学 Zhibing Zhang教授 学术报告
5626 BESG Construction Contracts
Presentation transcript:

English for Construction Engineering Management,建筑工程专业英语 授课教师:赖小东 email: tylerlai@126.com. Cell#13627005955 江西财经大学旅游与城市管理学院工程管理系

Lecture 8 Payments and Final Accounts 1. Construction Payments Introduction 2.Advance Payments 3. Interim(临时) Payments 4. Interim Payment Certificates 5. Final Account/Payment 6. Retention Money保留资金

Payments and Final Accounts 1. Construction Payments Introduction In construction contracts payments may be classified into three categories: Advance payments Interim payments Final payments Account最后支付

Payments and Final Accounts 2. Advance Payments An advance payment, or simply an advance, is the part of a contractually due sum that is paid in advance, while the balance will only follow after completion of the works. Advance payments are typically between 15% and 20% of the contract amount, but this depends on the nature of the works.

Payments and Final Accounts 3. Interim Payments Generally the interim payment will occur at pre-determined intervals in the contract. Interim valuations can be called stage payments or milestone payments paid at specific times when the contractor achieves the various stages of completion Under FIDIC contracts the commonly used document to value interim payments are the bill of quantities, and the schedule of rates.

Payments and Final Accounts 4.Interim Payment Certificates Elements of “Interim payment certificates” means a payment certificate issued under the clause “contract Price and payment” FIDIC Sub-Clause 14.6 stipulates that the engineer shall make the interim valuation and to issue within 28 days after receiving a statement/application and supporting documents from contractor.

Payments and Final Accounts 5. Final Account/Payment In basic terms of construction contracts, a final account is the agreed statement of the amount of money to be paid at the end of a building contract by the employer to the contractor. The final account based on the following documents: The form of contract Original priced bill of quantities Variations Drawings Agreed contractor’s claims

Payments and Final Accounts 6. Retention Money Retention money is amount retained by the employer for any defective works that may occur during the construction period and the defects liability period. typically 5%~10% of the total contract price the employer to release the retention as stated in the contract, once the defects are rectified to the satisfaction of the engineer.

Any Questions?