CMS RPC Endcap RE1 Status Report

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
Jiawen Zhang, IHEP, 2008, April 10, frascati Status of BEPCII/BESIII and Physics preparation Jiawen Zhang 2008/4/7—10 , PHIPSI08, Frascati.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
RPC Endcap Maintenance and RE4 Upscope Anton Dimitrov on behalf of RPC TC CMS Week Dec 2012 CERN, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Barrel Endcap The RPC System Baseline Six stations in the Barrel Four station in the Endcap up to  = 2.1 Baseline Six stations in the Barrel Four station.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
India CERN Meeting, BARC, 28/02/11
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W.Van Doninck Re-scope TDR August 2008 The forward RPC system (TDR) China Korea Pakistan Gap production Korea Gap production Korea Front-end electronics.
Сессия Ученого Совета ОФВЭ 27 декабря 2006 Проект CMS в 2006 Ю.М.Иванов В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
Activity related CMS RPC Hyunchul Kim Korea university Hyunchul Kim Korea university 26th. Sep th Korea-CMS collaboration meeting.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Silvia Costantini RPC General Meeting CMS week 15 June 2010.
ESS Program Plan and Schedule Update
Results with the RPC system of OPERA and perspectives
(University of Sofia “St. Kliment Ohridski”)
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Status of BESIII and upgrade of BESIII
University of Wisconsin
DC56 R&D Goals, Schedule and Status
Technical Coordination Parallel Session November 2011, FNAL
Integration and Services RE3/1 and RE4/1
Production ad Quality control of RPCs for the CMS muon barrel system
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
T1 status (a selection from EDR presentations)
LHC Experimental Vacuum Systems Status October ‘07
10/month is the present production rate 2 FTE + sporadic contributions
Technical Support Activities in PH-ADO-PO
CLAS12 First Experiment Workshop Report
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
CSC Electronics Installation and Commissioning CSCE I&C
BESIII RPC Detector Jiawen Zhang
RPC Detector Control System
Preparation of the CLAS12 First Experiment Status and Time-Line
RPC Detector Control System
CSC Trigger Meeting Summary
UK CMS Oversight Committee Mtg
RPC Readiness for installation
RPC Detector Control System
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
PCS Technical Board 27th February 2018, Vienna.
Teleconference ACS – FREIA 19th June 2017
Pierluigi Paolucci & Giovanni Polese
Plans for the 2004 CSC Beam Test
SNS-PPU upgrades the existing accelerator structure
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

CMS RPC Endcap RE1 Status Report Schedule V34.1 RE-1048 HALF: RE1/2 + and RE1/3 ready for installation April 05 RE-1049 RE2, 3 installed on YE+ Sep 05 2004 Milestones 3 RE1/2 & 1 RE1/3 pre production chambers tested Korean gaps deliveries ISR Assembly Lab on schedule CSC+RPC+LB Beam Tests Cosmic QC 20 RE1/2 +10 RE1/3 2005 Milestones Production 18 RE1/2 and 18 RE1/3 Installation April end 60 RE1/2 & 60 RE1/3 Installation October-November Cosmic Tests / Magnet Test Preparation On behalf of Peking University Colleagues And all at ISR

RE1/2 Completed chambers ready for quality control Dec. 2004 HV connector Last step Cosmic stand and DAQ RE1/2 Completed chambers ready for quality control tests in the cosmic stand

Production Status: 20 RE1/2 + 30 RE1/3 Assembled Preparation gas pipes – 120 chambers Cables – 60 chambers Mechanics .. Cover closing Alu plates Chamber production rate Expected 5 per week March 20 RE1/2 mass production re-launch GOAL: June RE1/2 complete April end RE1/3 Gaps expected GOAL: Sept 30 RE1/2 complete 36 needed @ X5 April 2005 Chambers Planned Constructed GOAL: Dec 05 All certified!

Database developed to store RPC production information http://forwardrpc/cms_forward_rpc/production_db/Main_db.htm

Create plots from cosmic test data Strip response profile

Cosmic QC See Andrey’s talk % HV 9.2kV mA Noise < 10Hz/cm2

Chamber QC 4 Checklists At different stages of production Cosmic Tests : Andrey Waiting for Final Destination: Point 5

Document history - Following DB Workshop Jan 24-28 Barrel and Forward (Endcap) RPC’s Configuration and Condition database requirements for CMS Core DB Team Document history - Following DB Workshop Jan 24-28 Version Number Description Author Date 0.1 First draft about RPC sub-detector description and related database requirements after having discussion with Frank Glege, Anil Kumar, Saima Iqbal and Marcello Abbrescia Archana Sharma 31-JAN-2005 0.2 Initial draft provided by Archana Sharma is edited to add the configuration database requirements jointly for Forward (Endcap) RPC (requirements given by Archana Sharma) and for Barrel (given by Marcello Abbrescia) and on the basis of discussions with Frank Glege, Andrew Branson and Norbert Zoltan Toth. Saima Iqbal 14-Feb-2005 0.3 Comments to v0.2 by Archana + 15-Feb-2005 0.4 Comments to v0.3 by Marcello Saima + Marcello 17-Feb-2005 0.5 Ambiguities mentioned in v0.2 resolved. Add Configuration database schema (Initial version is provided after editing discussion based on requirements among Norbert, Andrew, Saima and Marcello ) and add condition database schema requirements as provided by Marcello 06-Mar-2005 0.6 Question mentioned in V0.5 are resolves 13-Mar-2005

Schema for RPC Barrel and Endcap See Marcello’s talk – DB meeting Wednesday 16 at 8.30

Magnet Tests SX5 Cables & Services 18m HB 10m HB 15m 49m 10m 20m horizontal distances inside SX5 18m Counting House (see next page) HB 10m HB 15m 49m 10m YE+2 YE+2 YE+2 YE+1 20m magnet test position YE1 6 RE1/2 Chambers (One sector 60o) 6 Link Boards available

SX5 Cable Paths to be defined 15m 8m SX5 Cable Paths to be defined horizontal distances Counting House only runcontrol detectors magnet DAQ Counting House The Green Barrack

Summary and Conclusions Mass production gas gaps Korea full steam Assembly RE 1 ramped up @ ISR lab and has reached 5 chambers per week The final RE 1/2 RPC has been mated to ME 1/2 RE1/3 installation exercise performed Preparation for magnet tests started RE 1 production expects to meet the CMS master schedule for its installation and commissioning