ETSI EE status of activities in 2013

Slides:



Advertisements
Similar presentations
ATTM activities Energy Consumption of ICT Equipment Dominique Roche ATTM Chairman © ETSI All rights reserved Turk Telekom - ETSI Workshop © ETSI.
Advertisements

SEM10-04 Initiation of a Work Item ETSI Seminar © ETSI All rights reserved.
SEM16-05 Maintenance & withdrawal of documents ETSI Seminar © ETSI All rights reserved.
SEM14-05 APPROVING YOUR DRAFT ETSI Seminar © ETSI All rights reserved.
Month 2012 Committed to Connecting the World International Telecommunication Union Green Data Centers Overview of ITU-T Recommendation L Seventh.
ETSI Green Agenda Jonas Sundborg Ericsson ETSI Board member DOCUMENT #:GSC13-PLEN-53 FOR:Presentation SOURCE:ETSI AGENDA ITEM:6.9.
Clarification for Deliverable 3 Methodology Clarification for Deliverable 3 Methodology Takeshi Origuchi (NTT, Japan) Chief Editor of WG-A ITU-T Focus.
ETSI EE STATUS OF ACTIVITIES IN 2013 Paolo Gemma Chairman of Working Party 3 of ITU-T Study Group 5 ETSI EE Secretary/WG EEPS Chairman.
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Ahmed ZEDDAM France Telecom Orange Chairman, ITU-T Study.
International Telecommunication Union D3 Methodology Objectives for this meeting from Chairman of WG-A Yoh Somemura (NTT, Japan) Vice Chairman of FG on.
IMPLEMENTING MOBILE NETWORK ENERGY EFFICIENCY STANDARDS Mauro Boldi (Telecom Italia) Rapporteur of ETSI TC EE ES © ETSI All rights reserved.
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
International Telecommunication Union Committed to connecting the world 4 th ITU Green Standards Week Paolo Gemma WG2 Coordinator, ITU-T Focus Group on.
Sustainability in etsi
TC247 Relation between Energy Performance in Buildings to Building Automation,Controls (BACS) and Building Management (BM) standardised by CEN/TC247 EUROPEAN.
Overview of ITU-T Study Group 5 “Environment and Climate Change” Cristina Bueti, Adviser, ITU.
Efficient broadband deployment & multi-service implementation European home networking platform Dominique Roche (ATTM chairman) DOCUMENT #:GSC13-GTSC6-19.
ETSI Home Networking activities Rainer Münch ETSI TISPAN Chairman Presenter: Ian Spiers DOCUMENT #:GSC13-GTSC6-20r1 FOR:Presentation SOURCE:Rainer Münch,
Committed to connecting the world Overview of Question 17/5 “Energy efficiency for the ICT sector and harmonization of environmental standards” and Question.
International Telecommunication Union “ Result of work on Deliverable 2 ” From the ICT and Climate Change Focus Group Geneva October 12-16, 2009.
1 GISFI_GICT_ GISIF#7, , 2011 Agenda GICT_ , Standardization of Global Green Mobile Charger, Prof. Pandey, IIIT-A ITU Climate Change.
International Telecommunication Union Committed to connecting the world ITU/EBU Workshop Accessibility to Broadcasting and IPTV ACCESS for ALL, 23 – 24.
Committed to connecting the world ITU-T Study Group 5: the role of green ICT standards for sustainable ICT development: Paolo Gemma Huawei Chairman, Working.
International Telecommunication Union Committed to connecting the world 4 th ITU Green Standards Week Paolo Gemma Chairman of Working Party 3/5 of ITU-T.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
ETSI Green Agenda Jonas Sundborg Ericsson ETSI Board member DOCUMENT #:GSC13-PLEN-53r2 FOR:Presentation SOURCE:ETSI AGENDA.
PNOs-Suppliers Technical Interfaces Heidelberg, 3 March EIRUS User Group for Reliability and Quality Measurements Jan Willems, EIRUS secretary Belgacom.
ITU Regional Standardization Forum for Africa Livingstone, Zambia March 2016 ITU-T SG5 Activities A special focus on L.1440: Methodology for environmental.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Ventilation for buildings Energy performance of buildings Guidelines.
ETSI TC Cable in a nutshell
Status of in-progress work of CEN/TC235 on revision of
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
Exploiting Research via Standards
Update on 3GPP RAN3 Multi-RAT joint coordination
ICT and Environment (Green Agenda)
ICT and the Environment TTC activity for ICT & climate change
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
1st Informal Group on WLTP Palais des Nations, Geneva
Implementing Mobile Network Energy Efficiency Standards
Tyre GTR # 16 Progress report
Jonas Sundborg Ericsson ETSI Board member
Update – Reconfigurable Radio Systems
Informal document GRE Rev.1
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
CENELEC TC215 WG3 (EN Series)
Technical Organization and approval procedures
Standardization activities in ITU:
Final Report of TF-CS/OTA September The Amba Hotel, London
ICT and Environment (Green Agenda)
Informal document GRPE th GRPE, 9-12 January 2018
Underlying Principles of Approval Marking for the LSD Regulation
Underlying Principles of Approval Marking for the LSD Regulation
Forum on Energy Efficiency and Future Network Infrastructure
Evan Kane Division of Water Resources
Legal framework of territorial classifications and typologies for European statistics – state of play NUAC meeting, Brussels June 2015 Gorja Bartsch.
ETSI work with EY for HENs under M/536
Recent Standardization Activities on E-waste
Informal document GRVA st GRVA, September 2018
4th ITU Green Standards Week
Striving to achieve through international standards
Informal document GRE Rev.1
ETSI work with EY for HENs under M/536
The ETSI Standardisation Process
Informal document GRE-80-0X
Continuing Cooperation on IMT Standardization
OCP Engineering Workshop Hosted by Flex
European Standardization
ETSI BRAN Update (IEEE Co-Existence Workshop)
Presentation transcript:

ETSI EE status of activities in 2013 Paolo Gemma Chairman of Working Party 3 of ITU-T Study Group 5 ETSI EE Secretary/WG EEPS Chairman

Current activities To complete the EN 300 132-3 series on 400 Vdc and AC solutions. Monitoring standards Equipment monitoring: information on energy consumption, temperature GAL: Monitoring and control to detect energy consumption and load and change the status of equipment to reduce the energy consumption. Interfacing of renewable energy or distributed power sources to 400 VDC distribution systems

Current activities ITU joint activities: Networks metrics. LCA standard revision. Revise existing metrics standards to introduce new measurement methods/conditions. Energy Efficiency metrics and measurement for equipment in non ”static” conditions. Consider a definition of load that is changing to simulate the real traffic situation that is changing continuously.

Presentations available at ETSI Workshop on Environmental Impact Assessment and Energy Efficiency taking place on 7-8 October 2013 in Athens (Greece Presentations available at http://www.etsi.org/news-events/past-events/668-2013-eeworkshop Next event could take place in May 2015

Background information

New deliverables Published ES 202 336-4 V 1.1.1 Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks); Part 4: AC distribution power system control and monitoring information model ES 202 336-6 V 1.1.1 - Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks); Part 6: Air conditioning system control and monitoring information model. ES 202 336-9 V1.1.1 - Monitoring and Control Interface for Infrastructure Equipment (Power, Cooling and Building Environment Systems used in Telecommunication Networks) Part 9: Alternative energy sources TR 103 116 V1.1.1 - Practical verification of ETSI TS 102 706 V1.2.1 TR 103 117 V1.1.1 - Principles for Mobile Network level energy efficiency ES 203 184 V1.1.1 Measurement Methods for Power Consumption in Transport Telecommunication Networks Equipment ES 203 136 - Measurement Methods for Power Consumption in Switching and Router Networks Equipment ES 203 156 V.1.1.1 Environmental Engineering (EE); Thermal Management requirements for outdoor enclosures EN 301 605 V. 1.1.1 Environmental Engineering (EE); Earthing and bonding of 400 VDC data and telecom (ICT) equipment

Revision of existing deliverables TR 102 532 V1.2.1 - The use of alternative energy solutions in telecommunication installations EN 300 019-2-2 V 2.3.1 Environmental conditions and environmental tests for telecommunications equipment; Part 2-2: Specification of environmental tests; Transportation EN 300 019-2-3 V 2.3.1 Environmental conditions and environmental tests for telecommunications equipment; Part 2-3: Specification of environmental tests; Stationary use at weatherprotected locations EN 300 019-2-4 V. 2.3.1 Environmental Engineering (EE); Environmental conditions and environmental tests for telecommunications equipment; Part 2-4: Specification of environmental tests; Stationary use at non- weatherprotected locations Environmental tests; Stationary use at non- weatherprotected locations. TR 102 489 V. 1.3.1 Environmental Engineering (EE); European telecommunications standard for equipment practice; Thermal management guidance for equipment and its deployment TS 102 706 V. 1.3.1 Environmental Engineering (EE); Measurement method for energy efficiency of wireless access network equipment

New Wis approved in 2013 1/2 Revision of ES 201 554 “Measurement method for Energy efficiency of Core network equipmentto include in the present ES 201 554 the RNC/BSC equipment. Revision of ES 203 215 “Measurement methods and limits for power consumption in broadband telecommunication network equipment” to address the vectoring functionality, the setting of fan units, update the annex with power targets and publish the document as EN. Change request of EN 300 019-1-1, source Ericsson, reference contributions: EE1(13)42_003, Change Request, and EE(13)42_026 for the NWI form. As the scope defined in the NWI was not in line with the change request (NWI form is to add new classes) and the milestone dates were not reflecting the time required for the approval of an EN, the NWI was then amended as reference EE(13)42_026r1. Supporting members are: Ericsson, Orange, Telecom Italia, Alcatel-Lucent. The draft of the revised standard was available with reference EE(13)42_032. The NWI was approved; see decision EE#42-D05. Change request of EN 300 019-1-3, source Ericsson, reference contribution: EE1(13)42_007, Change Request, and EE(13)42_029 the NWI form. As the scope defined in the NWI was not defined and the milestone dates were not reflecting the time required for the approval of an EN, the NWI form was then amended in line with the CR and is in reference EE(13)42_029r1. Supporting members are: Ericsson, Orange, Telecom Italia, Alcatel-Lucent. The NWI was approved; see decision EE#42-D06 Change request of EN 300 019-1-4, source Ericsson, reference contribution: EE1(13)42_008, draft standard and Change Request, and EE(13)42_030 for the NWI form. As the scope defined in the NWI was not defined and the milestone dates were not reflecting the time required for the approval of an EN, the NWI form was then amended in line with the CR and is in reference EE(13)42_030r1. Revision of EN 300 019-1-2 V.2.1.4, source Ericsson, reference contribution is EE(13)043018. The proposed changes are on the reference standards; the proposal is to update them and to apply dated references, and furthermore to change the Annex A from “Normative” to “Informative” because no requirements are given. The NWI form was presented to TC-EE with reference EE(13)42_027r1. Supporting members are: Ericsson, Telecom Italia, Alcatel-Lucent, Deutsche Telekom. The NWI in document EE(13)42_027r1 was approved; see decision EE#43-D05. The draft standard for this NWI was also submitted to TC-EE, with reference EE(13)043018r2, for Approval Procedure. TC-EE approved this draft EE(13)043018r2 for Approval Procedure, see decision EE#43-D06. Revision of EN 300 019-2-1 V.2.1.2, source Ericsson, reference contribution is EE(13)043016. The changes are to update the reference standards for test methods and to adopt dated references. The NWI form was presented to TC-EE with reference EE(13)42_031r1. Supporting members are: Ericsson, Telecom Italia, Alcatel-Lucent, Deutsche Telekom. The NWI was approved; see decision EE#43-D07. The draft standard for this NWI was also submitted to TC-EE, with reference EE(13)043016r2, for Approval Procedure. TC-EE approved this draft EE(13)043016r2 for Approval Procedure, see decision EE#43-D08.

New Wis approved in 2013 Revision of EN 300 019-2-2 V.2.3.1, source Huawei, reference contributions are EE1(13)43001 and EE1(13)43002. The proposed changes are on the clarification of applicability of water test and on the aligment of latest ETSI editing rules. The NWI form was presented to TC-EE with reference EE(13)043021r1. Present supporting members are: Huawei, Telecom Italia, Alcatel-Lucent. The NWI proposal will be circulated to TC-EE for approval; see decision EE#43-D09. Revision of EN 300 019-2-4 V.2.3.1, source Huawei, reference contributions are EE1(13)43001, EE1(13)43003 and EE1(13)43004. The proposed change is to clarify the salt mist test applicable to equipment. The NWI form was presented to TC-EE with reference EE(13)043022r1. Supporting members are: Huawei, Telecom Italia, Alcatel-Lucent, Orange, British Telecom, Deutsche Telekom. This NWI was approved; see decision EE#43-D10 Revision of ES 203 156 V.1.1.1, source Deutsche Telekom, reference contribution is EE1(13)43008. The proposed changes are to correct units for temperature differences and the abbreviations of cooling capacity and to change the climatic class of equipment in free cooling cabinet (it should be class 4.1 instead of 3.3). No rapporteur was available for this work and therefore the NWI form could not be processed. The NWI form, when available, will be submitted to TC-EE approval by correspondence. EE1 had discussed the proposal to produce a deliverable on the thermal management in telecom/data centres, reference document is EE1(12)000002. This proposal is to define the temperature measurement points in the telecom/data centres aisles and close to the equipment racks. EE1 proposal to TC-EE is to revise the TR 102 489 to include the specifications for temperature measurementd in telecom/data centres. The EE1 new work item proposal was presented to TC-EE with reference EE1(13)000006r2. Present supporting members are: Telecom Italia, British Telecom, Huawei. The NWI proposal will be circulated to TC-EE for approval; see decision EE#43-D11. Revision of EN 300 253 V.2.1.1, source Ericsson, reference contribution: EE2(13)000014. The proposed changes are on the updates of references and definitions. The NWI was presented in TC-EE with reference EE2(13)043009, supporting members are: Ericsson, Alcatel-Lucent, Orange, Huawei, BT, Deutsche Telekom, Emerson. TC-EE approved this NWI, see decision EE#43-D15.   NWI for a TS on interfacing of renewable power source to 400 V-DC distribution system powering telecom/datacom equipment. This was presented by EE2 chairman with reference EE2(13)0430005r1. The NWI was presented in TC-EE with reference EE(13)043031, supporting members were: Orange, BT, Emerson, Ericsson, NTT, Huawei, Deutsche Telekom. This will be a joint Work Item with ITU-T SG5 (SQ19). This NWI was approved by TC-EE, see decision EE#43-D16