Solar Power in Madhya Pradesh Malaviya Solar Energy Consultancy www.malaviya.in
MPERC Bench Mark Tariff The present MPERC Bench Mark Tariff is given below: For Solar PV Projects Solar Plant Benchmark Tariff for Bidding Solar PV Power Generation Plants Tariff of INR15.35 per unit at normal rate of depreciation Tariff of INR 13.94 per unit if accelerated rate of depreciation is considered
MPERC Bench Mark Tariff For Solar Thermal Projects Solar Plant Benchmark Tariff for Bidding Thermal Solar Plant Tariff of INR 11.26 per unit at normal rate of depreciation Tariff of INR 10.29 per unit if accelerated rate of depreciation is considered
Procurement of 200MW Power from Solar Power Projects To meet the RPO targets set by MPERC and as per the energy requirement of Madhya Pradesh, MP Power Management Co Ltd has initiated procurement of Solar power through competitive bidding . The bidders were free to establish their Solar Thermal/PV projects anywhere in the Country.
Capacity of Solar Power Projects The capacity of each Solar Power Projects shall be minimum 5 MW. Any Bidder can apply for minimum 5 MW. There is no upper ceiling limit of capacity. However in case bidder supply solar power from the plants located outside the state, minimum offered capacity shall be 10MW.
Competitive Bidding Process Total 12 bidders have shown their interests in establishing Solar PV Power Projects in MP. Total for 430 MW offers were received against 200 MW. The qualified Bidders were required to submit RfP indicating the discount offered per kWh on the present MPERC Bench Mark Tariff. All the 12 bidders were qualified at RfS stage and they were offered RFP for giving discount on MPERC bench mark Tariff.
RFP Stage Out of 12, only 9 bidders have submitted their RFP bid. The lowest tariff offered after discounting was 7.90/kWh The highest tariff offered after discounting was 15.35 by five bidders. GoMP has decided to offer 25-25 MW Solar Power each to MoU signed Companies.
Power Purchase Agreement PPAs have been signed during October, 2012 with these Companies for procurement of 200 MW solar Power in Madhya Pradesh. Alfa Infraprop Pvt. Ltd. 20 MW M/s Welspun Solar Madhya Pradesh Pvt. Ltd 105 MW M/s ACME Energy Solutions Pvt. Ltd. 25 MW M/s Precious Energy Services Pvt. Ltd. Total 200 MW
Commissioning of Solar Plant The commissioning of Solar PV plant of capacity upto 25MW, shall be within 13 months from the date of signing of PPA. For capacity beyond 25MW, commissioning period shall be as under. Sl. Quantum of power Commissioning Period from the date No. offered in MW of signing of PPA 1 Above 25 MW and upto 50MW 14.5 months 2 Above 50 MW and upto 75MW 16 months 3 Above 75 MW and upto 100MW 17.5 months 4 Above 100 MW and upto 125MW 19 months 5 Above 125 MW and upto 150MW 20.5 months 6 Above 150 MW and upto 175MW 22 months 7 Above 175 MW and upto 200MW 24 months
Availability of Solar Power The Solar Power likely to be available from 13 months to 24 months from the date of signing PPA. It means, solar power would be available from December 2013 to November 2014.
Thank You