Thanks to everyone for attending!!

Slides:



Advertisements
Similar presentations
T1-NREN Luca dell’Agnello CCR, 21-Ottobre The problem Computing for LHC experiments –Multi tier model (MONARC) –LHC computing based on grid –Experiment.
Advertisements

1 Technology Readiness Maryland /2015 Admin Schedule 2 AssessmentOnline/CBT Testing Dates PARCC - PBAMarch 2 – May 8 MSA ScienceApril 13.
ICT STRATEGY AND IMPLIMENTATION IN A HOSPITAL JARED M OWINY UNITID FELLOW- HIV PROGRAMME MANAGEMENT.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operations update Guillaume Cessieux.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks perfSONAR deployment over Spanish LHC Tier.
Thoughts on Future LHCOPN Some ideas Artur Barczyk, Vancouver, 31/08/09.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Ops WG Act 5 Guillaume Cessieux (CNRS/IN2P3-CC,
1 LHC-OPN 2008, Madrid, th March. Bruno Hoeft, Aurelie Reymund GridKa – DE-KIT procedurs Bruno Hoeft LHC-OPN Meeting 10. –
Database Administrator RAL Proposed Workshop Goals Dirk Duellmann, CERN.
LHCOPN operational working group Guillaume Cessieux (CNRS/FR-CCIN2P3 – EGEE SA2) third meeting CERN – December th, 2008
Connect. Communicate. Collaborate perfSONAR MDM Service for LHC OPN Loukik Kudarimoti DANTE.
From the Transatlantic Networking Workshop to the DAM Jamboree to the LHCOPN Meeting (Geneva-Amsterdam-Barcelona) David Foster CERN-IT.
Connect communicate collaborate LHCONE moving forward Roberto Sabatino, Mian Usman DANTE LHCONE technical workshop SARA, 1-2 December 2011.
Connect. Communicate. Collaborate Using PerfSONAR tools in a production environment Marian Garcia, Operations Manager, DANTE Joint Tech Workshop, 16 th.
Enabling Grids for E-sciencE EGEE-II Meeting EGEE-II SA2 activity Tziouvaras Chrysostomos, MSc NTUA, 14 th March 2006.
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
11 DESIGNING AN ADMINISTRATIVE SECURITY STRUCTURE Chapter 7.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
CERN IT Department CH-1211 Geneva 23 Switzerland t James Casey CCRC’08 April F2F 1 April 2008 Communication with Network Teams/ providers.
CMS: T1 Disk/Tape separation Nicolò Magini, CERN IT/SDC Oliver Gutsche, FNAL November 11 th 2013.
LHCOPN operational model - 4 use-cases Guillaume Cessieux (FR-CCIN2P3 / EGEE networking support) on behalf of the Ops WG LHCOPN meeting, , Berlin.
1 LHCOPN Monitoring Directions January 2007 Joe Metzger
David Foster, CERN GDB Meeting April 2008 GDB Meeting April 2008 LHCOPN Status and Plans A lot more detail at:
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN Operational model: Roles and functions.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks LHCOPN operations Presentation and training.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
From the Transatlantic Networking Workshop to the DAM Jamboree David Foster CERN-IT.
LHC-OPN operations Roberto Sabatino LHC T0/T1 networking meeting Amsterdam, 31 January 2006.
LHCOPN operational model Guillaume Cessieux (CNRS/FR-CCIN2P3, EGEE SA2) On behalf of the LHCOPN Ops WG GDB CERN – November 12 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
David Foster, CERN LHC T0-T1 Meeting, Cambridge, January 2007 LHCOPN Meeting January 2007 Many thanks to DANTE for hosting the meeting!! Thanks to everyone.
15-Jun-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) CERN 15 June 2004 David Kelsey CCLRC/RAL, UK
LHCOPN / LHCONE Status Update John Shade /CERN IT-CS Summary of the LHCOPN/LHCONE meeting in Amsterdam Grid Deployment Board, October 2011.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ENOC status LHC-OPN meeting – ,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operating an Optical Private Network: the.
Launch event ICRI 2016, Cape Town - South Africa Launch event ICRI 2016 Cape Town South Africa David Bohmert Member ESFRI Executive Board Swiss ESFRI Delegate.
INF526: Secure Systems Administration Student Presentations And Review for Final Prof. Clifford Neuman Lecture July 2016 OHE100C.
LHCOPN operational handbook Documenting processes & procedures Presented by Guillaume Cessieux (CNRS/IN2P3-CC) on behalf of CERN & EGEE-SA2 LHCOPN meeting,
T0-T1 Networking Meeting 16th June Meeting
Which network parameters are interesting
Regional Workshop to disseminate Water Supply and Sanitation Standards of Quality of Service, adapted to LDCs Preparation to the ISO TC 224 Draft Standards.
COMM02 Project Monitoring and Control Unit 8
LHCOPN/LHCONE status report pre-GDB on Networking CERN, Switzerland 10th January 2017
“A Data Movement Service for the LHC”
New EGNRET Concept Notes
Supported by: PCR Status report AESAG, September
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
Cisco Unified Communications Management
PSS Plans for Improved Reliability and Availability
Information Technology Service Availability Metrics
Measurements on Internet2
Ian Bird GDB Meeting CERN 9 September 2003
GÉANT2 update - II Otto Kreiter, DANTE.
Networking for the Future of Science
LHCOPN Operations: Yearly review
Monitoring Appliance Status
WLCG Service Interventions
Montenegro Internet eXchange Point (MIXP) – a success story
Workshop Summary Dirk Duellmann.
DevOps Projects, assignments, lifecycle management, configuration
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Milestones/Dates/Status Impact and Connections
Supported by: PCR Status report AESAG, September
Migration Strategies – Business Desktop Deployment (BDD) Overview
Windows 10 | Do great things.
ESnet Network Measurements ESCC Feb Joe Metzger
Aries Hung ASGC OPS, ASGCNet
Presentation transcript:

Thanks to everyone for attending!! LHCOPN Meeting July 2007 Thanks to everyone for attending!!

Conclusions Anything we rely on for service is part of the opn and subject to the operational procedures Additional links could be provisioned to improve T1-T1 connectivity. How much of this mission do we assume? LHCOPN is a collection of circuits to support the T0-T1 mission. This infrastructure can be used to help support the T1-T1 requirements in so far as that does not impact the T0-T1 service. LHCOPN meeting is assessing the T1-T1 requirements but not provisioning this. Backup testing strategy Part of the operational procedures Need to schedule a maintennace window to be negotiated with the physics programme Backup Paths some solutions to improve resilience Principle: single event does not isolate a T1 Clear recommendations: Need to re-route some links and add some new links. These should now become actions! RAL and PIC need to be informed (action David/Kors) Ral should have a path to SARA Operational Procedures Group will take a step back to understand fully the requirements Domains should formally sign up to the handbook (MoU) T1-T1 mission needs clarification Simplification is the network is for bulk data movement. This is done by specific people in the sites and experiments. Need a round with the small group and prepare the workshop. (October) (Action Mathieu) – Date to be fixed by end August Monitoring Operations handbook should specify who has access to which data. Software suite ready by November - link utilization, round trip delay, one way delay tests, bandwidth tests. Other possibilities, netflow analysis and BGP monitoring. EGEE Grid community should be made aware of monitoring deployment plans (Action David) OSG will deploy these tools. 1 or 2 PC’s needed per T1. Proposal by Dante is a managed service for the ENOC by shipping an appliance to every T1 This would be installed at the OPN dmarc. There could be a right to use the appliance for other monitoring. Collect site specific data (hardware infrastructure) and plan for implementation within personar service. (Action Dante) Deployment plan and status (Dante) Flyer Feedback to Kors (Action: Everyone) Next meeting Report on the USLHCNet CFT More complete summary of ‘redundancy’ physical hardware

Procedural Notes Meetings Intermediate Activities 2 x 0.5 day Separate Ops Workshop? Ops entities have to be represented. Next meeting: October with Workshop at CERN Intermediate Activities Conf calls?