EAD AIXM 5.1 Implementation Razvan Guleac DNM/COO/NOM/ADM AIXM 5.1 Seminar
PLANNING EAD AIXM 5.1 Implementation
EAD Evolution One release every 12 Months 13/09/2018 EAD Evolution One release every 12 Months Client involvement during definition & assessment Dedicated workshops depending on release content Extensions to a release Necessity to react to the needs of the EAD clients On dedicated topics No impact on existing MyEAD/ESI API Between release – every 6 months Patches Maximum one per month Bug fixing EAD AIXM 5.1 Implementation Enter here your Presentation Title
EAD Development Process Operational Regulatory Evolution TF members SSG Members DOP, ITP Subsystems Etc. EUROCONTROL ICAO SES Etc. Web Tool – EAD CHM Tool End of April / Beginning of May Release End of October/ Beginning of November Release Extension Test Test Test Test Acceptance Acceptance 6 m 12 months EAD AIXM 5.1 Implementation
EAD Change Management Tool EAD AIXM 5.1 Implementation
EAD CHM – 814 – Route Package Download in AIXM 5.1 EAD AIXM 5.1 Implementation
Future Implementation Milestones AIXM 5.1 Digital NOTAM ICAO 2012 Flight Plan EAD AIXM 5.1 Implementation
AIXM 5.1 Implementation (1) Analysis, Specifications, Development, Testing AIXM 5.1 Obstacles Upload Digital NOTAM Increment 1 Min SDO Download 6 months Obstacles Upload / Download Min SDO Download Digital NOTAM Increment 1 AIXM 5.1 decoupling EAD Pre-Ops Min SDO Download EAD Production R6 R6E1 R7 MAR 2011 NOV 2011 APR 2012 EAD AIXM 5.1 Implementation
AIXM 5.1 Implementation (post R7) ADQ Support: Upload – ADQ scope (AIP, Charting, eTOD) Digital NOTAM upload & visualisation … R7E1 R8 R8E1 NOV 2012 MAY 2013 NOV 2013 EAD AIXM 5.1 Implementation
SDO 5.1 Architecture EAD AIXM 5.1 Implementation
System Architecture SDDO CORE SDDO Business Logic AIMSL WS AIMSL WFS AIMSL WMS AIP SDDO CORE CHP AIXM 4.5 DP - ESI AIP I/F AIMSL I/F AIXM 4.5 -> AIXM 5.1 Mapping 4.5 ESI I/F CHP I/F INO-DU SDDO Business Logic and AIXM 5.1 Database 5.1 AIXM 5.1 DP - ESI INO-DU I/F HMI I/F INO-DP I/F Digital N. I/F AIXM 5.1 DP - HMI INO-DP (current) AIXM 5.1 Download Digital NOTAM AIXM 5.1 -> CACD Mapping AIXM 5.1 -> ARINC Mapping AIXM 5.1 -> INSPIRE Mapping AIXM 5.1 -> AIXM 4.5 Mapping CFMU CACD ARINC Data User INSPIRE Data User AIXM 4.5 Data User AIXM 5.1 Data User EAD AIXM 5.1 Implementation
Data Maintenance Principles Data maintenance is done only in the appropriate system. This means that AIXM 4.5 data is handled in SDO (4.5) while AIXM 5.1 data is handled in SDO (5.1). This includes the HMI as well as uploads via ESI and IFS. The synchronisation is done via dedicated system interfaces between SDO (4.5) and SDO (5.1); backwards download (5.1 -> 4.5) shall be limited, e.g. ad-hoc SNAPSHOT Minor updates in the SDO (4.5) system to enable data model compatibility: new business rules, new DHOs It is not possible to have mixed slots, the slot-handling for 4.5 slots is done in SDO (4.5) while the equivalent handling for the 5.1 slots is done in SDO (5.1). Slot-operations are therefore only possible in the system where the slot has been created originally. The mapping shall be robust enough not to lead to any error in the counterpart system (mapping & business rules). EAD AIXM 5.1 Implementation
AIXM 5.1 Business Rules EAD AIXM 5.1 Implementation
EAD AIXM 5.1 Business Rules Based on the AIXM 5.1 Business Rules Will be transposed into EAD AIXM 5.1 Business Rules Using SBVR - Semantics of Business Vocabulary and Business Rules Will be developed progressively with the implementation of the upload packages (i.e. starting with Release 7 – May 2012) Will contain both Static Data rules and Digital NOTAM Event Specification Rules EAD AIXM 5.1 Implementation
EAD AIXM 5.1 Implementation
EAD AIXM 5.1 Implementation