Range Cost Estimates Estimating Accuracy Trumpet

Slides:



Advertisements
Similar presentations
Technology Module: Technology Readiness Levels (TRLs) Space Systems Engineering, version 1.0 SOURCE INFORMATION: The material contained in this lecture.
Advertisements

Design of Experiments Lecture I
S Y S T E M S E N G I N E E R I N G.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
Proactive Re-Optimization Shivnath Babu, Pedo Bizarro, David DeWitt SIGMOD 2005 (presented by Steve Blundy & Oleg Rekutin)
Program Analysis & Evaluation 1 © 2006 July 13, /18/98 2:13 PM Research Sponsors Robert Flowe, Gary Bliss OSD Program Analysis and Evaluation, Resource.
6-1 Copyright © 2013 McGraw-Hill Education (Australia) Pty Ltd Pearson, Larson, Gray, Project Management in Practice, 1e CHAPTER 6 Estimating Project,
Cost Estimation (OA 4702) Professor Dan Nussbaum Department of Operations Research Glasgow
“WHY AFFORDABILITY IS A SYSTEMS ENGINEERING METRIC” Quentin Redman Director – Solutions Architect PRICE Systems L.L.C.
Gate Review Process presented at DODCAS 2009 DON Session CAPT Jim Baratta Deputy Director, NCCA.
Enterprise Life Cycle Logistics Management (LOG350) Course Review Marty Sherman Center Director – Life Cycle Logistics LCL FIPT 14 Nov 08.
PROMISE RISK TO CONTRACTORS RISK TO GOVERNMENT CASH FLOW PROGRESS PAYMENTS ADMINISTRATION FEE/PROFIT COST- REIMBURSEMENT Best Effort Low High As Incurred.
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
AMERICA’S ARMY: THE STRENGTH OF THE NATION Mort Anvari 1 Cost Risk and Uncertainty Analysis MORS Special Meeting | September.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Budgeting the Project 4-1 Budget. 4-2 Homework #17  Overview  Approaches for gather data  Budgeting & Estimating costs  Budget uncertainty and risk.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
Profit Planning: An Overview Chapter 2 Managerial Accounting Concepts and Empirical Evidence.
Life Cycle Logistics.
AT&L Hot Topics in Acquisition Presentation for DAU 9 August, 2006.
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
BSBPMG503A Manage Project Time 6.4 Estimate Activity Duration The process of approximating the number of work periods needed to complete individual activities.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Transforming the Way We Work Jill Garcia Defense Acquisition University 29 October 2004 Logistics Community of Practice Knowledge Sharing Initiatives Knowledge.
Estimating Project Time and Cost
CSCI 6231 Software Engineering Cost Estimation Supplemental Instructor: Morris Lancaster.
ERROR IN MEASUREMENTS P M V Subbarao Professor Mechanical Engineering Department How Truthful are Our Observations?
Deputy Assistant Secretary of the Army for Cost & Economics (DASA-CE) 1 Schedule Risk Mort Anvari Acquisition Costing Directorate.
4-1 Budgeting the Project Budget. Outline: 4-2 Homework #17, #18, #19 (below) For #19 use the #18 data but add to it the following: -Vendor costs of either.
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
MORS Special Meeting: Risk, Trade Space, & Analytics for Acquisition
System Engineering Considerations (See Chapters 3 and 9)
Technology Readiness Assessment (TRA)
Life Cycle Logistics.
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Milestone A to Milestone B Requirements Management Activities
Product Support Strategy Demonstrated Performance
DAG CH 3 Figure 11: Weapon System Development Life Cycle
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
AT&L Hot Topics in Acquisition
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
Product Support Strategy
Fielding plan details and adjustments
Accuracy and Precision
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Fielding plan details and adjustments
Year 11 Mini-Assessment 13 HIGHER Estimation.
Definition/Decomposition of Warfighter’s Sustainment Requirements ICD
جلسه چهارم مديريت هزينه پروژه/1 (Project Cost Management)
Rounded Off Values Upper and Lower Bounds.
Product Support Strategy Demonstrated Performance
The MDAP Process MDAP Process Price Fighters Services Concept Refinement System Development & Demonstration Production & Deployment Operations.
Rounding and estimating: Upper and Lower Bounds
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

Range Cost Estimates Estimating Accuracy Trumpet Point estimates are almost always wrong. Range estimates show risk and uncertainty as well as most likely. Point estimate for funding is “most likely” from the range estimate. OSD AT&L now requires two estimates at each oversight review: Upper bound “will-cost” for funding Lower bound “should-cost” for baseline and program execution Concept Refinement System Development & Demonstration Production & Deployment Operations & Support Technology Development Concept Decision Design Readiness Review FRP Decision Review A B C FOC IOC Analogy Parametric Actuals Engineering Cost Estimating Techniques MDAP Process

Range Cost Estimates – In Working Estimating Accuracy Trumpet Point estimates are almost always wrong. Range estimates show risk and uncertainty as well as most likely. Point estimate for funding is “most likely” from the range estimate. OSD AT&L now requires two estimates at each oversight review: Upper bound “will-cost” for funding Lower bound “should-cost” for baseline and program execution A B C IOC FOC Concept Refinement Technology Development System Development & Demonstration Production & Deployment Operations & Support MDAP Process Design Readiness Review FRP Decision Review Concept Decision Analogy Parametric Actuals Engineering Cost Estimating Techniques