Longreach Water Mains Replacement

Slides:



Advertisements
Similar presentations
CASE STUDY – SUFFOLK HIGHWAYS PARTNERSHIP HEADLINE CWC assessed the potential for the implementation of Open Book Cost Management and Target Costing into.
Advertisements

Organization of Primary Entities
ABC Change Orders College of Environmental Design
Facilitated by Joanne Fraser RiverSystems
Contract CloseOut.
Get Started in e-Business. Aim This presentation is prepared to support and give a general overview of the ‘How to Get Started in e-Business’ Guide and.
Procurement in PPPs February 27, When do you start thinking about procurement? Preliminary Scoping & teaming Viability assessment Choice between.
Chapter 14 Schedule Risk Management Dr. Ayham Jaaron Second Semester 2010/2011.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Chapter 3 Project Initiation
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
ISO 9001: 2000 Certified Audit Process What to do.
King Fahd University of Petroleum & Minerals
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Report on the Challenges in the Planning and Procurement of Services for the Ceres and van Rhynsdorp Correctional Facilities Portfolio Committee on Correctional.
Preparing for 2017 RA Update March Tampa Bay Reasonable Assurance Update Annual assessment of water quality and attainment status of chl-a.
CONTRACT PRICING ALTERNATIVES Presented by: Fahad H. Al-Anazi CEM 520 February 27,1999.
Can you afford NOT to have a QS managing your construction budget?
Designer/Contractor JV- Apron Services Projects- A Winning Case
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
Outsourcing of Census Operations United Nations Statistics Division Regional Workshop on the 2010 World Programme on Population and Housing Censuses: International.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Regional Coordinators Meeting
Longreach Mains Replacement an ECI Model. Parties involved in the Project MARK SHIRLEY ENGINEERING CONSULTANTS.
Dr. Vladimir Mamaev UNDP Regional Technical Advisor Integrated Natural Resource Management in the Baikal Basin Transboundary Ecosystem Russian Federation.
NYAS Independent Visitors’ Services
Project Management PTM721S
Title of presentation Name(s) of author / presenter / co-authors
Roles and responsibilities PM
4/14/2018.
Direct Payments Debbie Waldron 22nd June 2016
Seminar On Energy Audit Submitted To: Submitted By:
The public – private continuum
Procurement Management
Systems Analysis and Design in a Changing World, 4th Edition
Change Management V.N.Bhaskar Rao Engineering & Construction Director Amec Foster Wheeler India Operations.
Bills of Quantities Introduction to FIDIC - Bills of Quantities -
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Outsourcing of Census Operations United Nations Statistics Division
DEFINED BENEFIT VS DEFINED CONTRIBUTION.
RIBA Plan of Work 2013.
Responsibilities & Tasks Week 2
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
Safety Responsibilities
Infrastructure Cost Mitigation
COST PLANNING AND ESTIMATION
COST PLANNING AND ESTIMATION
Project Development and Managing your Build Agenda
COST PLANNING AND ESTIMATION
VENDORS, CONSULTANTS AND USERS
Guidelines to Choose a Property Tax Consultant.
The 3-R Program Renew – Refresh – Revitalize
Engineering Project Tendering.
10 Stages Of the Engineering Design Process
Chapter 2 Managing Spending
Kick-Off Meeting Administrative Items
Infra program Project outline Jouko Kankainen
Organisational NRW Management
PROJECT OPTIMIZATION DTAR DIGITAL SOLUTION
Today’s Agenda Dealing with Vendors Consultants Contracts
Tips For Working With A General Contracting Company
Presented by: Ian Massey
Reports Welcome to the Finance video on reporting.
RIBA Plan of Work 2013.
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

Longreach Water Mains Replacement Superintendent’s Assessment by Allan Luyt

Superintendent’s Role in the ECI Good business relations between parties The ECI modal is dependent on participation GBA’s role: Assist in establishing the correct contractual path Administration of EOI Tender assessment and recommendations Stage 1 & 2 Contract Administration George Bourne and Associates has a long history of working with Longreach Regional Council to supply the best services for the towns people The ECI modal is dependent on successful participation by all parties and a strong working relation is a good start GBA has been involved from the beginning to: Assist in establishing the correct contractual path Administration of EOI Tender assessment and recommendations Stage 1 Contract Administration Stage 2 Contract Administration

Tender Assessment Tender assessment was effective EOI made the final recommendation simpler Thorough assessment with only three contractors Assessment: Design vs Construction vs Cost The combination of EOI followed by the tender assessment of the short listed contractors was effective The EOI made sure we have contractors that will appreciate the ECI process and made the tender assessment easier for the superintendent With only three contractors in the shortlist, the superintend can concentrate on being thorough and recommend the best contractor For assessment the superintendent must look out for a combination of design and construction experience and compare it to cost. All three factors must be balanced for ECI

Stage 1 – ECI Communications Communication is key Establish correct communication channels Sharing of technical information Separate Contractual and Technical information Technical meetings fortnightly Contractual meetings monthly Electronic correspondence is effective Face to face communication The project team is fairly large during design development with many ideas and correspondence to match Good communication channels where established early in the project and helped to keep momentum going The Design Consultant reports to the Contractor but technical information was shared by all It is important to separate Contractual information from Technical information – Had Separate meetings Technical meetings fortnightly Contractual meetings monthly Electronic correspondence is effective and especially useful for remote areas Face to face communication is always the most effective

Stage 1 – ECI Contract Project team was enthusiastic and cooperative Design work is paid per hour at contract rates Assess claims on value for money Cost of Design vs Cost of Construction ECI is a design development process Detailed design left for stage 2 Flexibility to allow construction works The client, contractor & superintendent all have the same goal in mind – a successfully completed project and an understanding of the process and effort to reach successful completion Design work is paid per hour at contract rates and superintendent must have a feel for productivity Design work must be carried out efficiently and superintendent must assess claims on value for money With a fixed project total, more money spent on design means less money for construction It is not essential to complete detailed design in Stage 1 The ECI design process leads up to detail design through a methodical process of investigation, survey, establishing standards, hydraulic design and prioritizing pipe replacement Stage 1 was concluded when there was suitable information for the detailed design The ECI contract includes rates for construction. 25% of this contract was paid for DMA pit construction and valve replacement

Stage 2 D&C Contract Back to the comfort zone - D&C Contract Finalize this contract during stage 1 Schedule of prices calculated from contract rates Schedule of prices is key for risk allocation Assessment of progress claims Detailed Design at a rate per meter Stage 2 was administered as a D&C Contract but required the ECI process first The contract document was compiled during stage 1 and could only be completed once the replacement prioritization was finalized and the schedule of prices agreed upon Schedule of prices are calculated from the original contract rates eg: Rates per meter of constructed pipe calculated from day work rates The allocation of risk shared by client and contractor was reflected in the structure of the schedule of prices Schedule of prices allowed for easy assessment of progress claims Detailed design drawings were paid for in Stage2 at a rate per meter

Superintendent’s Conclusions Good faith and Cooperation The D&C contract would not have been as successful without the ECI process ECI leads for future D&C contracts Construction methods and Contract Documents established for future projects Estimate cost of future projects Quantify the reduction in water leakage Terms such as good faith and cooperation stand out in the ECI contract The success of the ECI process is best measured after construction is complete The Stage 2 D&C contract would not have been as successful without the ECI process The ECI process has produced enough information to run all the remaining future pipe replacement on D&C contracts Construction methods and Documents developed during the ECI process can be used for future tenders Schedule of prices can be used to accurately estimate cost of future projects Measures are in place to quantify the reduction in water leakage now and in the future

Superintendent’s Conclusions Success is measured by the combined benefit that both parties have gained from the contract Project success was due to a strong project team and a good understanding of the ECI process A successful contract is not measured by the amount of money gained or saved by an individual party Success is measured by the combined benefit that both parties have gained from the contract This project has been a true example of success thanks to a strong project team and a good understanding of the ECI process