PROCUREMENT 2017 DESIGN KAIDO ZIMMERMANN

Slides:



Advertisements
Similar presentations
1 Better Value for Money Workshop, CEC, Brussels, March 12, 2003 Interoperability and Track Maintenance Agent of Progress in &
Advertisements

Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Public Procurement in Albania in the framework of recent reforms PUBLIC PROCUREMENT AGENCY 1.
The Future – the “Roadmap” SIMPLIFICATION. The Road Map 2 TSI in Place Hi Speed Conv Loc & pass Off TENS TSI Conformity New Vehicles Networks Open pointsUpdates.
1 8 July 2010 Cross – Acceptance and Safety Ralf Schweinsberg Vice-President Eisenbahn-Bundesamt UNECE Group of Experts on Unified Railway Law Secon Session;
Rail Baltica RETURN TO EUROPE IN NEW QUALITY
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
The European Railway Agency in development
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
Developing eProcurement policies for public sector Key regulatory questions in current international legal standards and national laws Eliza Niewiadomska.
JASPERS – Supporting Urban Transport Projects Ministry of Regional Development, Czech Republic JASPERS Seminar, Prague - 28th November 2007 Dr. Joachim.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Indicators achieved in ES Structural Funds activities within the competence of the Ministry of Transport.
Challenges and the benefits of interoperability for the railway industry and the rail transport Eric Fontanel UNIFE General Manager.
1 PUBLIC PROCUREMENT AND USE OF FIDIC CONTRACTS IN LATVIA Procurement Monitoring Bureau 2013.
CENTRAL EUROPE PROGRAMME SUCCESS FACTORS FOR PROJECT DEVELOPMENT: focus on finances Partner Search Forum Poznań, Poland 16 – 17 December 2008.
Modernisation of signalling system (2001/LV/16/P/PT/006) Stage 1 Intermediate Body: Ministry of Transport Employer: Latvian Railway - LDZ Contractor: Consortium.
Audits of pre-accession funds in the State Audit Office of the Republic of Latvia 2000/2001 Uldis Kremers Auditor of the Audit Department of the State.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING March 18-3:00PM | ROOM 1E-113.
WORKING WITH ASIAN DEVLOPMENT BANK  BOARD OF TRADE OF METROPOLITAN MONTREAL September 22 nd 2015.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Forum for Sustainable Mobility and Metropolitan Development Oradea, November 2013 JASPERS Teo Falato, Transport Sector Specialist.
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
THE NEW DIMENSIONS OF THE EUROPEAN PUBLIC PROCUREMENT POLICY Christian SERVENAY DG MARKT/Unit C1.
Status of QUACO project
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Development of Riga and Pieriga Mobility Plan and Action Program Māra Tapiņa Director.
Start and break slide Kick-Off-Meeting April 1 st – 3 rd 2009 Large Conference Hall of Hotel Riga Riga/ Latvia host: Baltic Sea Region Programme
Airport master planning for infrastructure development Gabriel Hyde.
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Progress of Riga and Pieriga Mobility Plan (RRMP) Andulis Židkovs Deputy State Secretary,
Different aspects of Latvian Railway Sector
Vehicle-Wayside Intercommunications: future EN Standard Marcos Albuquerque January 2002.
E LECTRIFICATION OF L ATVIAN RAILWAY NETWORK 1. O PERATIONAL P ROGRAMME FOR THE EU F UNDS P ROGRAMMING P ERIOD «G ROWTH AND EMPLOYMENT » 6.2.
Georgia Technology Authority CIO Council June 9, 2008.
Workshop accreditation and recognition / conformity assessment Removing Technical Barriers - TSIs within New Approach and Safety Directive Dr.-Ing. Andreas.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY Eighth Regional Public Procurement Forum May, 22-25, 2012 Tirana
EUROPEAN DISABILITY FORUM MITA EDF’s support to the Manifesto for Accessible Tourism Carlotta Besozzi|22/03/2013.
EPPSS 1 Frequently Asked Questions What are the recommended technical specifications for using ePPSS? 1 Relatively modern workstation and recent Operating.
Via Nordica 2008 Development of Main Road Networks both in the Baltic States and Poland Valdis Laukšteins Director of Technical Division SJSC Latvian State.
Menauitpuitptransport#MENAUITP Land Transportation Projects in the Kingdom of Bahrain Nada Deen Director, Land Transportation Projects Ministry of Transportation.
Copyright © AEbt 2016 All Rights Reserved. AEbt Angewandte Eisenbahntechnik AEbt Angewandte Eisenbahntechnik (AEbt Applied Railway Technology) Further.
Reaching beyond the borders Dins Merirands, Deputy State Secretary Ministry of Transport of the Republic of Latvia Railway PRO Technology & Services Forum,
PROCUREMENT STUDIES Kaspars Briškens,
Business Environment in Latvia
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
Marek Stavinoha Legal officer DG MOVE A4 European Commission
Stage 2 Light Rail Transit Program “In the ground ready”
Minimum Set of Requirements for Suppliers
Rail Baltica procurement organisation and regulations
University of Birmingham My Future World Careers for Geography & Environmental Science Transport Planning Stephen Hill.
Joint Presentation of the NCPs from PL, EE, LV and LT
What to be taken into consideration for public procurement in Lithuania? Dainius Budrys Director, Rail Baltica statyba April 25, 2017.
TRANSPORT SCIENCE: INNOVATIVE BUSINESS SOLUTIONS
Minimum Set of Requirements for Suppliers
TAF TSI implementation in Latvian Railway (LDz)
RAIL BALTICA PROCUREMENT PLAN
European Rail Infrastructure Managers
NAB/RB Training Workshop In Valenciennes, April 2016
Accident investigations: developments and roles
The New Italian Law on Ports in the European Perspective
Session II: System authority for ERTMS 4RP Trackside approval
NATIONAL PROCUREMENT IN LATVIA
Rail Baltica Cross-border Procurement Experience
Non-RU Applicant (NRA), PCS UG
Kristjan Kaunissaare Rail Baltic coordinator (Estonia)
ERTMS: specifications, deployment, financing
Shift 2 Rail ERA Involvement 17 FEB 2014 BRUXELLES.
Certification and Assurance
Working Group on Rail Transport Statistics:
Fourth Railway Package Technical Pillar Hearing at the European Parliament, Brussels 7 May 2013 José GORTAZAR Chief Technical Officer, CAF.
Transport policy for sustainable development
ERA and accident statistics
Presentation transcript:

PROCUREMENT 2017 DESIGN KAIDO ZIMMERMANN Planning and Implementation Manager, RB Rail AS

WHO IS RESPONSIBLE FOR DESIGN? DESIGN OF TRACK AND STRUCTURES DETAILED TECHNICAL DESIGN: RB RAIL AS CONSOLIDATED PRELIMINARY DESIGN: RB RAIL AS PRELIMINARY DESIGN: IMPLEMENTING BODIES

RB RAIL AS RESPONISBILITY DETAILED TECHNICAL DESIGN: Master Design Detailed Design CONSOLIDATED PRELIMINARY DESIGN TO ENSURE INTEROPERABILITY

DESIGN PROCESS ORGANISATION DETAILED TECHNICAL DESIGN: MASTER DESIGN DETAILED DESIGN PRELIMINARY DESIGN . CONSOLIDATED DESIGN 2016 2018 2019 2018 2020 2020 2022

DESIGN PROCESS ORGANISATION Design - 9 tenders Technical assessment -3 tenders Notified Body -1 tender

DESIGN GUIDELINES Design guidelines-set of predefined and standardized technically and economically justified engineering and design solutions for Rail Baltica; Operating rules-draft regulatory basis of Rail Baltica Railway operations; Fully complaint with TSI INF traffic codes P2/F1; Available from October 2017

RAIL BALTICA PROCUREMENT – DESIGN Up-coming Tenders 5 On-going tenders 1 6 Tenders on Design in 2017

RIGA INTERNATION AIRPORT PASSENGER STATION AND RELATED INFRASTRUCTURE Procurement of Latvian implementing body – Eiropas Dzelzceļa līnijas Qualification phase was announced on 04/11/16  with a submission deadline 03/01/17 Second phase will start in May Design contract signed in Q4 2017 On-going Tender

RB RAIL AS UPCOMING TENDERS 2017 - DESIGN Tender start: Q4 2017 Tender start: Q4 2017 Detailed technical design of the entire railway line in Estonia Technical assessment of the technical design in Estonia Detailed technical design for railway line in Central section, Latvia Technical assessment of the technical design - Central section, Latvia 01 02 03 04 05 NOBO Tender for the Baltic States