INTRODUCTION TO LOAD SHEDDING TRANSFORMER

Slides:



Advertisements
Similar presentations
Introduction to Switchgear
Advertisements

DC-DC Fundamentals 1.4 Charge Pump Regulator
Understanding Electrical TransmissionDemonstration D1 A Guide to the National Grid Transmission Model Demonstration D1 Power losses in transmission.
TUTORIAL 3 Q1 Draw and label a block diagram the elements of a DC power supply which receives an input from the 240 V; 50 Hz mains and produces an output.
Understanding Electrical TransmissionDemonstration C2 A Guide to the National Grid Transmission Model Demonstration C2 Why are high voltages used for transmission?
Understanding Electrical TransmissionDemonstration C1 A Guide to the National Grid Transmission Model Demonstration C1 Transformers and power.
Understanding Electrical TransmissionDemonstration A1 A Guide to the National Grid Transmission Model Demonstration A1 How is electricity generated and.
Uninterruptible Power Supply (UPS)
Previous Lecture 12 Voltage Dividers with Resistive loads.
2- Figure shows a circuit diagram. Determine the current,
Domestic Installation: Switch Circuits
Distributed Power Systems ELCT 908
POWER SUPPILES LECTURE 20.
Unit 28 Single-Phase Transformers. Objectives: Discuss the different types of transformers. List transformer symbols and formulas. Discuss polarity markings.
Parul Institute of Engineering & Technology Name of Unit : Diode And Its Applications___________ Topic : BRIDGE RECTIFIER_________________________ Name.
Rowena D. Olicia  A. Dry cell A. Dry cell  B. Switch B. Switch  C. Conductor C. Conductor  D. Load D. Load.
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
Introduction to Power Supplies
Steady State Analysis Of A Microgrid Connected To A Power System
Electrical Power Distribution. Forms of Energy All forms of energy fall under two categories POTENTIAL Stored energy or energy of position (gravitational)
EMT212 Analog Electronic II
A SUMMER TRANNING PRESENTATION ON 400 KV GRID SUB STATION BIKANER
Distribution Systems-General
SERVICE ENTRANCE EQUIPMENT
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Series and Parallel Circuits. Series Circuits ► Are the simplest type of circuits. ► Series circuits – all the components (lamps, cells, switches, etc.)
Electricity Notes 6 - Circuits Electric Circuit – _______________________________________ All electrical circuits have 4 parts: 1.____________________________________________________.
 General description of Power Supply  Advantages/Disadvantages of SMPS  Block diagram of SMPS  Basic topologies and practical  Requirements  Various.
DISTRIBUTED GENERATION ISSUES Technical Issues Non-Technical Issues.
Self Switching Power Supply. Introduction Self Switching Power Supply  Embedded system requires a regulated power supply.
This project on Primary sub station of Visakhapatnam port trust at Visakhapatnam. It is 132kv/11kv substation with incoming feeder from APTransco and 11.
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
BY-Udale Rupesh Zala Kishan Vivek Vaghasiya GUIDE :- ANKIT BRAHMBHATT DIVYESH MANGROLIYA.
6/22/2016 “IN THE NAME OF ALLAH THE MOST MERCIFUL AND THE MOST BENEFICIAL”
Single Phase and three Phase Distribution Substation
Total PML excluding the largest
Presented by Under the esteemed guidance of D.GANGADHAR REDDY, M. Tech. Asst. Prof., EEE Department UNIVERSAL COLLEGE OF ENGINEERING & TECHNOLOGY AUTO.
Half-wave Rectifier.
Center tap Full-Wave Rectifier.
SMPS.
Sub Station.
Introduction to Electric Power System and A. C. Supply
Uninterruptible Power Supply (UPS)
Eric A Lewis Enstore director
THREE-PHASE TRANSFORMER
SUB-STATIONS.
Subject Name: LINEAR INTEGRATED CIRCUITS Subject Code: 10EC46
THREE PHASE FAULT ANALYSIS WITH AUTO RESET ON TEMPORARY FAULT AND PERMANENT TRIP OTHERWISE Submitted by:
Power Generation and Distribution
Generating Electricity 7
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
Electric Machine Transformers
INDUCTION MOTOR PROTECTION FOR SINGLE PHASING, OVERVOLTAGE AND OVER TEMPERATURE Submitted by:
Recall Lecture 7 Voltage Regulator using Zener Diode
SMART GRID BASED FAULT IDENTIFICATION SYSTEM
SUMPNER’S TEST OF TRANSFORMERS
K. J. I. T institute of engineering 3-PHASE TRANSFORMER. PREPARD BY:-
AC Voltage Controllers AC to ac Converters
Engineering Project Cable Management.
3-Phase Transformer Construction, Principal, Working, Operation Advantages Over 1-Phase Transformer Introduction Advatages Construction Principal Working.
EET 323 – Electrical System Design Lecture 9: Grounding
Creating Circuit Diagrams
Exercise Session 3 Power systems.
EET 323 – Electrical System Design Lecture 11: Panel-boards and Switch-boards Instructor: Radian Belu, PhD.
AC Voltage Controllers AC to ac Converters
DISTRIBUTION SYSTEMS (Theory) By M A R Uzair Assoc Prof EEE NSAKCET
POWER ELECTRONICS DC-DC CONVERTERS (CHOPPERS) PART 2
Electrical Machines (EELE 3351)
Prepared by: Ismael K. Saeed
Rectifiers. Introductions of rectifiers: IN PARTICLE ACCELERATORS, ELECTRONS OR OTHER CHARGED PARTICLES ARE FORCED TO MOVE ALONG ORBITS OR TRAJECTORIES.
Presentation transcript:

INTRODUCTION TO LOAD SHEDDING TRANSFORMER

INTRODUCTION Load shedding = cutting off the electrical current on certain lines when the power become greater the supply. Load shedding transformer is defined as it will convert 3-phase supply to 1-phase supply. Hence it is used to convert agriculture feeder power supply from 3-phase to 1-phase during 16-hours when demand become greater than the available power supply.

When the demand becomes greater then the available power supply, at that time the load shedding become necessary. Hence load shedding transformer performed dual duties. It is used for shedding the load as well as it is provided 1-phase power supply to consumer.

CIRCUIT DIAGRAM

CIRCUIT DESCRIPTION As shown in figure outgoing under ground cable is contained 3-phase supply during some time when agriculture consumer require 3-phase power supply at that time period load shedding transformer is disconnected from agricultural feeder & 3-phase is directly connected to the change over switch at the dotted position. Hence 3-phase & 1-phase is available at the secondary of distribution transformer.

During the remaining time demand become greater than the available power supply at that time position of switch will be change & now load shedding transformer is connected in system.

Advantages After the invention of LST , theft of power supply is totally disappeared on agriculture feeder. Vary large number of working class families residing at the site of Agr. They get the continuous 1-phase supply. It is used for shedding the load, when demand is greater than the available power supply.

Thank you