Improving Your Construction Site

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

SWPPP Stormwater Pollution Prevention Plan
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
WYOMING WATER & ENERGY LAW NPDES Permitting Issues Kara Brighton Hageman & Brighton, P.C. Cheyenne, WY.
Construction Site Stormwater Compliance Presentation for CALBIG October 9, 2013 Kristin Kerr, P.E., QSD EOA, Inc. on behalf of the San Mateo Countywide.
ALABAMA STORMWATER The Problem and How ALDOT Has Corrected It.
Stormwater 101: How to stay out of trouble with TDEC.
GEORGIA ENVIRONMENTAL PROTECTION DIVISION SMALL BUSINESS ENVIRONMENTAL ASSISTANCE PROGRAM.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Env 247 Overview of Stormwater Management March 1, 2011.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
Indiana Confined Feeding Operations Permit Program Indiana Department of Environmental Management.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Module 7: Construction Phase
Construction and State Storm Water Permits What does it all mean? February 5, 2015Casper Workshop1.
Environmental Viewer and KPDES Permit Maintenance Managers April 2007.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Welcome to training on Best Management Practices for Erosion and Sediment Control.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
Stormwater Control & Design
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Stormwater Regulations NC Division Of Water Quality DPPEA Technical Sharing Session May 25, 2004.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
Module 8: Post-Construction Phase Post-Construction Phase BMP Monitoring BMP Maintenance Temporary BMP Removal After Stabilization BMP Reporting and Record.
Test Your Storm Water Knowledge!
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
0 Montana Department of Environmental Quality Permitting and Compliance Division Water Protection Bureau Water Quality Discharge Permits Section Storm.
CGP Transfers and Terminations How does it end?. Transfers.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Expectations for Construction Activities The City of Hendersonville Department of Public Works Erosion Control Inspection Review Process Power Point Presentation.
Level 1B Recertification July 2016
Level 1A Recertification July 2016
Current NPDES General Permits are available
Stormwater Construction General Permit (CGP) TXR150000
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Stormwater Management and MS4 Compliance
Ohio Department of Transportation
For Storm Water Discharges Associated with Construction Activity
Environmental Rule 327 IAC 15-5 to a General Permit
SWPPP Basics.
Storm Water Pollution Prevention Plan Development
Presentation to the Livingston City Council on the Phase II MS4 Permit
Importance of Pre-Construction Meetings
TPDES Construction Management at the City of Laredo
Sacramento County Stormwater Quality Program
EPA Public Meeting Dallas, Texas May 10, 2005
John Tinger U.S. EPA Region IX
Stormwater Commitments
Stormwater Pollution Prevention Plans
INDOT Storm Water Management
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
Rule 5 and 13 Conversion Impacts
TPDES Construction General Permit Compliance
MS4 = Municipal Separated Storm Sewer System
Illicit Discharge Detection & Elimination (IDDE) Plan
Sacramento County Stormwater Quality Program
Stormwater Construction General Pemit (CGP) TXR150000
Erosion & Sediment Control Plan (ESCP)
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Improving Your Construction Site Ryan Alltop, CPESC, DECI Construction Division Manager

Overview Know the Regulators Know the Regulations Follow the Regulations and your SWPPP Manage Your Subcontractors During Construction Modification Stabilize Signoff

Know The Regulators National Pollutant Discharge Elimination System (NPDES) -Construction Activities USEPA 327 IAC 15-5 Administered by the Indiana Department of Environmental Management Local Regulations by MS4s and SWCDs

Know The Regulations SWPPP Submitted to IDEM and MS4 Public Notice Given Notice of Intent (NOI) – Must show proof of SWPPP and Public notice. Image from Fanpop.com

Know The Regulations 70 percent cover for areas not being worked on for 15 days. Inspections every week or within the first business day after a measurable storm event (.5 inches) Notice of Termination (NOT) NOT may only be submitted after a Perennial Stand of Vegetation having 70 percent or greater coverage has been established.

Follow The Regulations and Your SWPPP Inspect your site at the correct time. During rainstorms or immediately after. Driest day in July won’t tell you much. Improve your BMPs, and Modify or Switch BMPs that don’t work Update your SWPPP Avoid offsite discharge of sediment

Manage Your Contractors If something will effect your bottom line make it effect theirs Teach them about your SWPPP and how it effects them Let them know your expectations while they are on your site

During Construction Modification If it is Broken Fix it!

Stabilize

Sign Off Submit Your Notice of Termination Must Have 70 Percent Permanent Perennial Vegetative Cover Remove temporary sediment control BMPs

Construction Division Manager Questions? Ryan Alltop Construction Division Manager ENCAP, Inc. 2585 Wagner Ct., DeKalb, IL 60115 772 North Madison St. 815-748-4500 Crown Point, IN 46307